Skip to content

This site is in beta and not (really) for public release. The data is real but the design and copy is subject to significant change.

Electrical Permit Application

Applications & Permits · 1 pages · 213 words · all documents · the town's PDF →

This is machine-extracted text, not the document. It was extracted from the town's PDF; layout, tables and figures may not survive intact. The town's copy is authoritative; open it before relying on anything here.

Durham clerk’s recpt # ____________________

TOWN OF DURHAM

630 Hallowell Road Durham, Maine 04222 Tel. (207) 353-2561Fax: (207) 353-5367

Electrical Permit

Date: _____________                                                        Permit # ____________________

Durham Electrical Permit Authorization _____________________________ Property Owner’s Name: _________________________________ Location of work to be done: ____________________________________ Map ________ Lot ________ Property Owner’s Telephone #: ______________ txt avail ☐ If whole house, total Sq ft: _______________

Electrician: Name ________________________________ Master Electrician’s Maine License #: _____________________ Electrician’s Address: ________________________ Electrician’s Telephone #: _______________ txt avail ☐ Electrician’s E-mail Address ________________________

CMP Work Order # ____________________________________ FULL Description of electrical work to be completed:

● Electric work conducted in commercial establishments and residential rental units must be completed by a Licensed Electrician and permitted and inspected by the Maine State Electrical Inspector for this region. ● Homeowners or electricians must call when ready for inspection giving 24 hour notice. ● All under-ground wiring must be inspected before covering. ● Wiring in walls must be inspected before covering with insulation or sheetrock.

Schedule Inspections by calling – 207-844-1774

STAFF USE ONLY

Admin Fee ________ Meter Inspection Date & int: ___________________________ Permit Fee: ______ x ______ = ________ Rough-in Inspection Date & int: ___________________________ Total ________ FINAL Inspection Date: ___________________

Inspector’s Final Signature _______________________________ Comments: ________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________

Form updated July 21, 2026

Source: electrical-permit-application-fill.pdf on durhammaine.gov. Text extracted with pdftotext; no wording has been corrected.