PLANNING BOARD PACKET APRIL 24, 2024 PAGE 3

Town Of Durham Planning Board Minutes Fire Station Meeting Room, 6:30 pm , 2024

1. Roll Call & Determination of a Quorum

In attendance: John Talbot (Chair), Juliet Caplinger (Vice Chair), Allan Purinton, Brian Lanoie, Marc Derr, Tyler Hutchison (Alternate), and George Thebarge (Town Planner).

Absent (excused): Anne Torregrossa

2. Pledge of Allegiance

3. Amendments to the Agenda: None

4. Acceptance of the Minutes of prior meeting (March 6, 2024)

Allan Purinton moved to accept the March 6, 2024 meeting minutes, Juliete Caplinger seconded, motion carried 5 – 0.

5. Informational Exchange on Non-Agenda Items:

a.) Town Officials:

George Thebarge

▪ The Town Meeting approved Land Use Ordinance amendments for housing density (Part 1), solar standards (Part 2), and fees (Part 3). A budget for codification of the Land Use Ordinance was also passed.

▪ The Select Board will be meeting on May 7 to discuss possible land use policy direction and projects for the coming year.

▪ The Community Center Visioning process will also be put in motion with an introductory meeting later in May.

b.) Residents - None

c.) Non-residents – None

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 4

6. Continuing Business:

a) Public Hearing on Applications for Transmission Line Section 62 Rebuild & Transmission Line Section 64 Rerate, Map 9, Lot 16, Map 12, Lot 25, & Map 13, Lot 12. (Public comment will be taken)

▪ Sam Rice of updated the Board on the supplemental submissions that addressed questions raised by the Board at the last meeting.

▪ He also summarized communications with the Fire Chief, Road Commissioner, and Code Officer.

▪ The public hearing was opened and closed with no member of the public requesting to speak.

b) Conditional Use Application for Transmission Line Section 62 Rebuild & Transmission Line Section 64 Rerate, Map 9, Lot 16, Map 12, Lot 25, & Map 13, Lot 12. (Public comment will not be taken)

▪ The Chairman read the draft findings for substantive deliberation by the Board:

Section 7.4 CONDITIONAL USE REVIEW CRITERIA

A. Review Criteria: Before it issues a conditional use permit, the Planning Board shall find, as a matter of fact, that the proposed use meets the following criteria:

1. Public Health Impacts: The proposed use will not create unsanitary or unhealthful conditions by reason of sewage disposal, emissions to the air or water, or other aspects of its design or operation.

Findings:

a. The Project will maintain the same safe and healthful conditions that currently exist in the transmission line corridor.

b. The Project will not result in any sewage disposal.

c. CMP provided its permits from the US Army Corp of Engineers and the Maine DEP. These approvals demonstrate that the Project has been designed to meet or exceed compliance with all applicable laws, ordinances, codes, and regulations with respect to air and water quality. Minor temporary influences of air quality may occur as a result of construction related activities, such as engine exhaust, but will be insignificant due to their limited duration and location within the existing transmission line corridor.

d. The Project will not create unsanitary or unhealthful conditions by reason of sewage disposal, emissions to the air or water, or other aspects of its design or operation.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 5

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for public health impacts. Motion seconded by Brian Lanoie: Votes to approve: 5 Votes to deny: 0

2. Traffic Safety Impacts: The proposed use will not create unsafe vehicular or pedestrian traffic conditions when added to existing and foreseeable traffic in its vicinity.

Findings:

a. No new permanent roads or driveway entrances are proposed.

b. Prior to construction activities, CMP will establish temporary access points from public or private roadways in areas where access does not currently exist. An adequate number of access points will be determined in locations that provide safe access with respect to sight distances, intersections, and applicable traffic generators. All temporary access points will meet MDOT Highway Driveway and Entrance Rules as specified in Title 17 Chapter 299.

c. During the construction phase, some material and equipment deliveries may require vehicles to stop on or back into a street right-of-way. During these infrequent occasions, spotters or flaggers will be used to assist vehicles into or out of the corridor.

d. Post-construction, CMP will utilize the currently existing roads that enable CMP to access the corridor for occasional routine and emergency transmission line maintenance and repair. This continued use will not cause additional highway or public road congestion.

e. CMP has consulted with the Durham Road Commissioner who proposed conditions of approval related to obtaining permits, the design and removal of temporary access points, erosion and sedimentation controls, and bonding for potential road damage.

f. The Project will not create unsafe vehicular or pedestrian traffic conditions when added to existing and foreseeable traffic in its vicinity.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered. Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of

compliance with the criterion for traffic safety impacts.

Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 6

3. Public Safety Impacts: The proposed use will not create public safety problems which would be substantially different from those created by existing uses in the neighborhood.

Findings:

a. The Project is located within the existing CMP transmission line corridor and is consistent with existing uses.

b. The proposed use will not create public safety problems which would be substantially different from those created by existing uses in the neighborhood or require a substantially greater degree of municipal services than existing uses in the neighborhood.

c. The applicant has consulted with the Fire Chief who has scheduled specialized training for emergencies involving high voltage lines.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Brian Lanoie: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

4. Environmental Impacts: The proposed use will not result in sedimentation or erosion, or have an adverse effect on water supplies.

Findings:

a. CMP’s Environmental Guidelines (Application Exhibit 7) will be applied to minimize soil disturbance and to protect water quality.

b. CMP’s permits from the USACE and the Maine DEP demonstrate that the Project has been designed to meet or exceed compliance with all applicable laws, ordinances, codes, and regulations with respect to sedimentation, erosion, and water supplies.

c. The Project will not result in sedimentation or erosion or have an adverse effect on water supplies.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered. Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of

compliance with the criterion for traffic safety impacts.

Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 7

5. Scale & Intensity of Use: The proposed use will be compatible with existing uses in the neighborhood, with respect to physical size, visual impact, intensity of use, and proximity to other structures.

Findings:

a. The Project will be constructed within the existing CMP transmission line corridor.

b. The Project is a rebuild and a rerate of existing transmission lines and therefore is not only compatible but is identical to existing uses.

c. The Project will be compatible with existing uses in the neighborhood, with respect to physical size, visual impact, intensity of use, and proximity to other structures.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

6. Noise & Hours of Operation: The proposed use will be compatible with existing uses in the neighborhood, with respect to the generation of noise and hours of operation.

Findings:

a. The rebuilt and re-rated transmission lines will not create any noise that is different from present conditions.

b. As part of the state permitting of the New England Clean Energy Connect project, CMP evaluated transmission line noise in a sound study, which demonstrates that the Project in Durham will be below the Section 5.19 noise limits.

c. The Project will comply with Section 5.19’s prohibition on construction activities between 9 p.m. and 6:30 a.m.

d. The Project will be compatible with existing uses in the neighborhood, with respect to the generation of noise and hours of operation.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered. Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 8

7. Right, Title, or Interest: The applicant has sufficient right, title or interest in the site of the proposed use to be able to carry out the proposed use.

Findings:

a. The Project is located within the existing CMP transmission line corridor on land owned by CMP.

b. CMP provided evidence of title, right, or interest in Application Exhibit 3.

c. CMP has sufficient right, title or interest in the site of the proposed use to be able to carry out the proposed use.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by John Talbot: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

8. Financial & Technical Ability: The applicant has the financial and technical ability to meet the standards of this Section and to comply with any conditions imposed by the Planning Board pursuant to subsection 7.5.

Findings:

a. The Project is being funded as part of NECEC project, which will be fully funded by Massachusetts ratepayers.

b. Not only has CMP secured funding for the Project, but CMP is a subsidiary of AVANGRID, Inc., a leading sustainable energy company with approximately $41 billion in assets and operations in 24 U.S. states. CMP provided as Application Exhibit 9 a Letter of Commitment to Fund from Michael Panichi, Vice President & Treasurer of AVANGRID, Inc., which is the parent company of CMP.

c. CMP has extensive experience in the design, construction, and operation of electric infrastructure projects and will utilize existing staff capabilities for this Project. o support the Project, CMP has engaged a team of highly qualified and experienced engineers, permitting specialists, consultants, and contractors.

d. CMP has stated its commitment and has the financial and technical ability to comply with any reasonable conditions imposed by the Planning Board pursuant to subsection 7.5

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 9

• The Chairman moved to strike the first finding as being irrelevant to the demonstration of financial capacity. Marc Derr seconded the motion and the amendment passed unanimously.

Motion made by John Talbot: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

B. Compliance with Land Use Ordinance Standards: The proposed conditional use shall meet all applicable criteria and design or performance standards in all articles of the Land Use Ordinance.

1. Article 5 - Performance Standards: The Project conforms with the following applicable standards for specific uses and issues:

5.4 Air Emissions: The Project will not cause air pollution, and no degradation of air quality will result from the Project. Minor air emissions will result from construction- related activities, such as exhaust from diesel engines, but will be limited in duration and given the generally rural nature of the site, Section 5.4 criteria will be met. All activities will also comply with applicable federal and state regulations.

5.10 Construction & Plumbing Standards: All construction will be in accordance with CMP’s transmission standards, general industry standards, and good utility practices including all necessary live line working clearances, strength factors, and reliability factors that are governed by the National Electrical Safety Code (“NESC”). The transmission lines and all facilities will be operated in full compliance with CMP safety standards, which fully comply with federal Occupational Safety & Health Administration requirements.

5.11 Erosion Control: CMP’s Environmental Guidelines, which are used as a routine part of all transmission and substation projects, contain erosion and sedimentation control requirements, standards, and methods that will protect soil and water resources during construction of the various Project components. It contains specific BMPs appropriate for electric transmission line construction. These guidelines will be followed in the rebuild and rerate of these transmission lines in Durham and are consistent with the requirements of the Shoreland Zoning Ordinance, as well as Section 5.11(A)-(D). CMP’s Environmental Guidelines will serve as the soil erosion and sedimentation control plan to be submitted for approval per Article 9 Section 9.11(R)(1). Upon completion of the project, all disturbed areas will be permanently revegetated or otherwise permanently stabilized. This includes the restoration of all areas disturbed by pole installation, temporary access roadways, construction, and resource crossings. In limited circumstances, minor grading within 10 feet of a property line may be required in order to accommodate temporary access roads which will be restored at the end of the Project.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 10

5.14 Historic Resources: CMP conducted extensive pre-historic archaeological, historic archaeological, and historic architectural investigations and surveys along the Project route, for State purposes under Chapter 375.11 of the MDEP rules and for federal action under Section 106 of the National Historic Preservation Act (“NHPA”) (16 U.S.C § 470f). CMP consulted with the Maine Historic Preservation Commission (“MHPC”) throughout the state and federal permit application development and approval process. These surveys identified one site in Durham that is eligible for NHPA recommendation; however, this site will be avoided by construction activity; temporary construction fencing to prohibit disturbance of the site will be installed prior to construction activities.

5.16 Landscaping: The transmission line corridor will be revegetated through natural recruitment to a scrub-shrub habitat as required by the VMP (Exhibit 6) and Environmental Guidelines (Application Exhibit 7). CMP will maintain a forested buffer along the western extent of the Project that provides landscaping that screens views of the Project. Where the existing transmission lines are visible from nearby locations, including where the Project crosses open agricultural areas, no additional landscaping is proposed because it would not be practical or effective given the existing state of the landscape. Because the Project will be located within an existing corridor and adjacent to another existing transmission line, it will not adversely affect the scenic quality of the adjoining neighborhoods nor encroach on abutting land uses and the landscape will be preserved in its natural state to the maximum extent possible.

5.19 Noise Limits: The rebuilt and re-rated transmission lines will not create any noise that is different from present conditions. Nevertheless, as part of the state permitting of the NECEC Project, CMP evaluated transmission line noise in a sound study, which demonstrates that the Project in Durham will be below the Section 5.19 noise limits. The Project further will comply with the prohibition on construction activities between 9 p.m. and 6:30 a.m. 5.20 Odor Emissions: Minor temporary odor emissions as a result of construction- related activities, such as exhaust from diesel engines, may occur. Given the limited duration of construction activities and the generally rural nature of the site, any influences on overall odor emissions will be insignificant in Durham. Accordingly, the Project will not cause or allow the emission of odorous air contaminants from any source that would result in detectable odors at the lot line of the source in excess of the limits set forth in Section 5.20. All activities will also comply with applicable federal and state regulations.

5.25 Storage of Materials: There will be short-term storage in upland areas of wooden poles, wire, and other hardware to be used for the rebuild and rerate of these transmission lines. Materials will be neatly organized and stored so as to not harbor vermin, and to prevent stagnation of water. All materials stored outdoors will be stored in such a manner as to prevent the breeding and harboring of insects, rats, or other vermin. Only materials used for construction in the immediate area will be stored in these areas.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 11

5.29 Vibrations: During the normal operation of the transmission lines there will be no vibrations at or beyond lot lines.

5.30 Water Quality Impacts: The Project will not deposit on or into the ground or discharge any pollutant to the waters of the State. To protect water quality and minimize spill potential during construction, no fueling or maintenance of vehicles will be performed within 100 feet of wetlands, streams, or other sensitive or protected natural resources, unless done on a paved road. As described in the VMP (Exhibit 6), CMP uses and will continue to use a selective herbicide program to treat areas once every four years to maintain early successional scrub shrub growth. Herbicide will be selectively applied (using a low-pressure backpack-mounted applicator) to individual capable specimens to prevent growth (or re-growth of a cut plant) of individual plants. Herbicides will not be used within 100-foot riparian buffers.

2. Article 9 – Shoreland Zoning: Three poles (62-52, 62-53 and 62-54) which already exist within the Limited Residential Shoreland Zoning District will be replaced as part of the Section 62 rebuild and one existing pole (64-197) that will receive maintenance as part of the Section 64 rerate is located in the RP district of Libby Brook. A shoreland zoning permit is not required, but the Project conforms with following applicable Article 9, Sections 9.11 and 9.13(G) Land Use Standards and Criteria:

9.11.C. Piers, Docks, Wharves, Bridges, and Other Structures and Uses Extending Over or Located Below the Normal High-Water Line of a Water Body or Within a Wetland; and Shoreline Stabilization: There will be no in-stream work, and CMP will provide the riparian buffers described in the VMP (Application Exhibit 6) and implement its environmental protection requirements described in its Environmental Guidelines (Application Exhibit 7) and Environmental Control Requirements (Application Exhibit 8), such that impacts will be minimized. 9.11.H. Stormwater Runoff: The Project is designed to minimize stormwater runoff by deploying stormwater control methods described in the Environmental Guidelines (Application Exhibit 7). Temporary access roads and any construction activities will be carefully planned and designed to utilize existing natural runoff control features, such as upland vegetated buffers, and diversion and dissipation techniques such as water bars, check dams, or settling basins. Diversion and dissipation areas will be maintained as necessary to ensure proper functioning. Shrubby vegetation will be retained to the maximum extent practicable and soil exposure during construction will be minimized in both area and duration. After construction is complete, all areas will be returned to preconstruction contours, reseeded as needed, and allowed to revegetate to a scrub- shrub condition. The Project will not alter stormwater runoff from predevelopment conditions. 9.11.K. Essential Services: Where feasible, the installation of essential services shall be limited to existing public ways and existing service corridors. The Project will be located within CMP’s existing transmission line corridor and will be built entirely on land that CMP owns. The existing transmission line corridor will not require widening to accommodate the upgraded transmission lines. CMP’s existing, maintained transmission line corridor crosses the RP and LR districts in Durham. Pole number 64- 197, which is an existing pole that is partially located within the RP district of Libby Brook, will receive maintenance (installation of cross brace) as part of the Project. The Project will not be “installed” in the RP district associated with Runaround brook or the unnamed tributary to Runaround Brook but will simply pass overhead. CMP has minimized the impact of the transmission line upgrades by continuing to locate them within the existing corridor. There is no reasonable alternative to this Essential Service passing over the RP district in Durham. Locating the transmission line upgrades within an existing transmission line corridor minimizes impacts on the surrounding uses and resources, including natural resources and visual impacts. Within the corridor, CMP has sited each pole to avoid or minimize impacts on surrounding uses and protected natural resources to the greatest extent practicable and has compensated for impacts that cannot be avoided. The Project includes one pole location in the RP district associated with Libby Brook. 9.11.O. Exemptions to Clearing or Removal of Vegetations other than Timber Harvesting: The Project meets the exemption of clearing and vegetation removal requirements in the Shoreland Zone as per Section 9.11(O)(2) because Project does not involve construction of principal or accessory “structures” as defined in the Land Use Ordinance. 9.11.P. Hazard Trees, Dead Trees and Storm-Damaged Trees: Current transmission line corridor maintenance will continue on the rebuilt and rerated lines. During such maintenance, hazard trees, storm damaged trees, and dead trees may be identified; those trees are typically on the edge of the transmission line corridor and are identified as hazard trees because they pose an imminent threat of violating the minimum separation standard or are at risk of falling onto and contacting the lines due to disease, unstable shape, or potential instability. Hazard trees are typically removed immediately upon identification. Removal of hazard, storm-damaged trees, and dead trees, where the stumps remain and no new cleared areas are created, will be conducted only when necessary and is allowed in the shoreland zone without a permit after consultation with the CEO. 9.11.R. Erosion and Sedimentation Control: CMP’s Environmental Guidelines (Application Exhibit 7) will serve as the soil erosion and sedimentation control plan to be submitted for approval. Certified erosion control specialists will be present at the site each day these activities occur for a duration that is sufficient to ensure that proper erosion and sedimentation control practices consistent with this standard are followed. Erosion and sedimentation control measures will stay in place until the area is sufficiently covered with vegetation necessary to prevent soil erosion has been completed. 9.11.S. Soil Analysis: Based on the Soil Survey Geographic Database compiled by the United States Department of Agriculture – Natural Resources Conservation Service, the Project will be located on soils in or upon which the proposed uses and transmission poles can be established and maintained without causing adverse environmental impacts, including severe erosion, mass soil movement, improper drainage, and water pollution, during and after construction. 9.11.T. Water Quality: The Project will not deposit on or into the ground or discharge any pollutant to the waters of the State. To protect water quality and minimize spill potential during construction, no fueling or maintenance of vehicles will be performed within 100 feet of wetlands, streams, or other protected or sensitive natural resources, unless done on a paved road. As described in the VMP (Exhibit 6), CMP uses and will continue to use a selective herbicide program to treat areas once every four years to maintain early successional scrub shrub growth. Herbicide will be selectively applied (using a low-pressure backpack-mounted applicator) to individual capable specimens to prevent growth (or re-growth of a cut plant) of individual plants. Herbicides will not be used within the 100-foot riparian buffers within the RP district at Runaround brook, an unnamed tributary to Runaround brook, and Libby brook. The multiple methods, plans, and procedures to prevent water quality degradation during construction, operation, and maintenance of the NECEC are incorporated into the Environmental Control Requirements (Application Exhibit 8), VMP (Application Exhibit 6), and Environmental Guidelines (Application Exhibit 7). 9.11.U. Archaeological Sites: CMP has conducted extensive potential pre-historic archaeological, historic archaeological, and historic architectural investigations and surveys along the Project route. No identified site is located in the mapped shoreland zones crossed by the Project in Durham.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 12

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 13

Section 9.13(G) Criteria for the Issuance of a Shoreland Zoning Permit

1. Maintain safe and healthful conditions: The Project will maintain the same safe and healthful conditions that currently exist in the transmission line corridor. The infrastructure and equipment in the transmission line corridor is regularly maintained to established industry standards to ensure the safety of utility workers and the general public. All construction will be in accordance with CMP’s transmission standards, general industry standards, and good utility practices including all necessary live line working clearances, strength factors, and reliability factors as governed by the NESC. The transmission line and all facilities will be operated in full compliance with CMP safety standards, which fully comply with federal Occupational Safety & Health Administration requirements.

2. Not result in water pollution, erosion, or sedimentation to surface waters: As described above with respect to Shoreland Zoning Ordinance Sections 9.11(H), (N), (R), (S), and (T) the Project will not result in water pollution, erosion, or sedimentation to surface waters.

3. Adequately provide for the disposal of all wastewater: Not applicable. There will be no wastewater disposal required for this Project.

4. Not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat: In order to identify existing resources, field biologists documented wildlife while conducting field surveys for the Project. In addition, CMP also conducted fish and wildlife database searches and contacted state and federal natural resource agencies to obtain existing data on wildlife and fisheries resources in the vicinity of the project components. The existing corridor occurs in wetlands within the Limited Residential District associated with an unnamed wetland. One single pole location (pole number 62-53) is partially located within a wetland at the LR District associated with an unnamed wetland and one existing single pole location (pole number 64-197) which will receive maintenance, is currently located within a wetland at the RP district associated with Libby Brook. Pole number 62-53 will result in approximately seven square feet of permanent wetland impacts. Six USACE vernal pools are located within the LR district at an unnamed wetland crossed by the existing corridor in Durham. No USACE vernal pools have been identified within the mapped RP district crossed by the existing corridor in Durham. No transmission poles are planned to be installed within vernal pools as part of the Project in the Town of Durham. There are no rare, threatened or endangered species, inland waterfowl and wading bird habitats, or other significant wildlife habitat identified within the mapped shoreland zone crossed by the Project corridor in Durham. There will be no in-stream work, and CMP will require the applicable riparian buffers, described in its VMP (Exhibit 6) and will implement its environmental protection requirements described in its Environmental Guidelines (Exhibit 7) and Environmental Control Requirements (Exhibit 8), such that impacts will be minimized and there will be no adverse impacts to fisheries and aquatic life.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 14

5. Conserve shore cover and visual, as well as actual, points of access to inland waters: Not applicable. The Project will take place entirely within the existing corridor and does not include alterations to points of access to inland waters.

6. Protect archaeological and historic resources as designated in the Comprehensive Plan: As discussed above with respect to Shoreland Zoning Ordinance Section 15(U), the Project will not impact any archaeological or historic resources in Durham.

7. Is in conformance with the provisions of Section 9.11., Land Use Standards: As described above, the Project complies with all applicable provisions of the Ordinance.

3. Article 11 – Floodplain Management: Pursuant to Section 11.8, the Planning Board has reviewed the Floodplain Management standards and makes the following findings:

• Proposals are consistent with the need to minimize flood damage. The Project will not cause flooding or flood damage.

• Public utilities and facilities, such as sewer, gas, electrical and water systems are located and constructed to minimize or eliminate flood damages. No sewer, gas, or water systems are proposed as part of this Project. The Project involves upgrades to two existing electric transmission lines, and CMP has appropriately located the Project to avoid any flood damage.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 15

• Adequate drainage is provided so as to reduce exposure to flood hazards. The area occupied by existing poles will not increase as a result of the Section 62 rebuild or the Section 64 rerate, therefore there will be no increase in stormwater runoff from the Project. The Project will not cause or increase flooding or cause a flood hazard to any neighboring structures. Furthermore, the Project will not affect runoff/infiltration relationships. The Project will minimize stormwater runoff by deploying stormwater control methods described in the Environmental Guidelines (Application Exhibit 7). The Project will not alter stormwater runoff from predevelopment conditions.

• All proposals include base flood elevations, flood boundaries, and, in a riverine floodplain, floodway data. These determinations shall be based on engineering practices recognized by the Federal Emergency Management Agency. The Project’s natural resource maps depict the FEMA flood boundaries in Durham. The requirement for base flood elevations apply only to the new construction or substantial improvement of “structures” as defined in the Land Use Ordinance. The aerial crossing of the transmission line and its poles do not meet this definition, and base flood elevations are therefore not required.

• Any proposed development plan must include a condition of plan approval requiring that structures on any lot in the development having any portion of its land within a Special Flood Hazard Area, are to be constructed in accordance with Section 11.6 of this ordinance. The proposed Project does not include “structures” as that term is defined by the Land Use Ordinance. The Project is otherwise in compliance with Section 11.6, Development Standards, as described in the Floodplain Management Permit Application.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Alan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Juliette Caplinger: Votes to approve: 5 Votes to deny: 0

6. Continuing Business:

c) Completeness Review of Site Plan Application for Transmission Line Section 62 Rebuild & Transmission Line Section 64 Rerate, Map 9, Lot 16, Map 12, Lot 25, & Map 13, Lot 12. (Public comment will not be taken)

d) Substantive Review of Site Plan Application for Transmission Line Section 62 Rebuild & Transmission Line Section 64 Rerate, Map 9, Lot 16, Map 12, Lot 25, & Map 13, Lot 12. (Public comment will not be taken)

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 16

• The Chairman read the draft findings for substantive deliberation by the Board:

A. SUBMISSION REQUIREMENTS

Section 8.5. SITE PLAN REVIEW MANDATORY SUBMISSIONS

The following items shall be submitted as part of the Site Plan Review Application, unless the applicant submits a written waiver request, and is granted a waiver from the submission requirement by the Planning Board, pursuant to Section 8.7.A. The applicant submitted and the Board reviewed the following documents:

1. Application narrative dated February 16, 2024, by Burns-McDonnel Engineering of Portland, Maine.

2. Site Plan Review Application Dated February 8, 2024.

3. Site Plan Review Checklist dated February 16, 2024.

4. Site Plan Review Waiver Request dated February 8, 2024.

5. State of Maine Public Utilities Commission Order dated May 3, 2019.

6. Maine Department of Environmental Protection Site Location Permit dated May 11, 2020.

7. Maine Land Use Planning Commission Site Location Permit dated January 8, 2020.

8. Spreadsheet listing deeded interests in property with copies of deeds.

9. Project Scope and Natural Resources Maps dated January 29, 2024.

10. Undated Transmission Line Configuration Cross Sections showing Existing, Permitted, and Proposed pole configurations.

11. New England Clean Energy Connect Post-Construction Vegetation Management Plan dated October 2020.

12. Central Main Power Environmental Guidelines for Construction and Maintenance Activities on Transmission Line and Substation Projects by TRC Engineering of Augusta Maine dated June 29, 2018.

13. Environmental Control Requirements for CMP Contractors & Subcontractors Oil, Hazardous Materials, and Waste dated February 2017

14. Letter evidencing Financial Capacity from Michael Panichi, Vice President & Treasurer of Avangrid Inc. & Avangrid Networks, Inc. of Portland Maine dated January 12, 2024.

15. Letter from Colin Clark, DEP Shoreland Zoning Coordinator, on interpretation of Chapter 1000, Guidelines for Municipal Shoreland Zoning Ordinances on how essential services are interpreted with respect to transmission lines dated June 8, 2020.

16. Spreadsheet of Deed Restrictions, Easements, Rights-of-Way, and other Encumbrances with copies of legal documents.

17. Memorandum of Agreement between CMP and State and Federal Agencies on Protection of Historic Properties dated June 18, 2020.

18. List of Abutter and Abutter Notices.

19. Supplemental materials requested by the Board:

a. Supplemental Cover Letter dated March 28, 2024;

b. Project Scope and Natural Resources Maps Updated (Exhibit 4 Revised);

c. Email Correspondence with Fire Chief Robert Tripp dated March 11&15, 2024; and,

d. Email Message from Sam Rice to Road Commissioner dated April 1, 2024. The applicant requested the following waivers from the submission requirements:

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 17

1. Section 8.5.C requirement for a site plan scaled at 100 feet to the inch. CMP requested that the Board authorize a scale of 250 feet to one inch, as on the maps in Application Exhibit 4, because the scale of the Project is of such magnitude as to make a larger scale map unnecessary and cumbersome. A relaxation of the terms of this ordinance related to the map scale requirement is granted because the proposed scale of 250 feet to one inch will substantially secure the objectives of the requirements if so waived, the public health, safety, and welfare will still be protected, and this waiver will not nullify the intent or purpose of the Comprehensive Plan or the Site Plan Review Ordinance, and the performance standards of the Site Plan Review Ordinance will be met.

2. Section 8.5.C.4 boundary survey. CMP requested that the Board waive the requirement for a boundary survey existing information from the Town of Durham’s Assessors Maps and CMP’s source deeds in Application Exhibit 3 demonstrate CMP’s ownership. The upgraded transmission lines will occur in the center of the 400-foot-wide property. There will be no possibility of encroaching on abutting property boundaries, and thus sufficient information is available to establish, on the ground, all property boundaries without a formal survey. The waiver would not nullify the intent and purpose of the Comprehensive Plan or this Ordinance, and the performance standards of the Site Plan Review Ordinance will be met.

3. 8.5.C.24 plan signature block. In lieu of this requirement, the Planning Board will attach to this Findings of Facts and Decision document the Project maps provided by CMP such that the signature affixed to this Findings of Facts and Decision document will substantially secure the objectives of the requirements if so waived, the public health, safety, and welfare will still be protected, and this waiver will not nullify the intent or purpose of the Comprehensive Plan or the Site Plan Review Ordinance, and the performance standards of the Site Plan Review Ordinance will be met. Motion made by Brian Lanoie: The applicant has met the submission requirements for site plan approval except for those specifically waived by the Planning Board per Section 8.7.A. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

B. SITE PLAN REVIEW CRITERIA

Section 8.6. SITE PLAN REVIEW MANDATORY SUBMISSIONS

A. Utilization of the Site:

1. The Project is sited within an existing CMP transmission line corridor and does not require tree removal; therefore, it is located in those portions of the site that have the most suitable conditions for development. CMP’s transmission line corridor will continue to be maintained in an early successional scrub/shrub habitat. Vegetation will continue to be removed and controlled in the manner described in the VMP (Application Exhibit 6). Throughout construction, shrub and herbaceous vegetation will remain in place to the extent practicable to minimize soil disturbance.

2. The location of new transmission line poles was engineered to avoid impacting environmentally sensitive areas to the greatest extent practicable and equipment access through environmentally sensitive areas will be avoided as much as practicable.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 18

3. The practices provided in the VMP and the Environmental Guidelines will be applied to minimize the extent and duration of soil disturbance and the potential for erosion and sedimentation and to protect adjacent natural resources.

4. Natural drainage areas will be preserved to the maximum extent practicable.

5. The plan for the development reflects the natural capabilities of the site to support development.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered. Motion made by Allan Purinton: The site plan reflects natural capabilities of site to support the development, buildings and parking are located on suitable land, environmentally sensitive portions of site have been avoided & protected, and natural drainage is maintained to the maximum extent practical. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

B. Adequacy of Road System:

1. The Project will generate no additional traffic other than construction vehicles during construction.

2. CMP will obtain required permits from the Durham Road Commissioner.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered. Motion made by Marc Derr: Access roads have capacity to take the added traffic proposed and the project does not generate peak hour trips that affect traffic safety on those roads. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

C. Vehicular Access into the Site:

1. No new permanent roads or driveways are required for the Project, and the Project will have no unreasonable negative impact on the Town’s Road system.

2. CMP has consulted with the Durham Road Commissioner and the Road Commissioner has proposed conditions of approval to address potential impacts of the project on Town- maintained roads.

3. All temporary access points will be constructed pursuant to CMP’s Environmental Guidelines (Application Exhibit 7) and will meet Maine Department of Transportation Highway Driveway and Entrance Rules as specified in Title 17 Chapter 299.

4. During operation of the transmission line, CMP will utilize access points similar to those currently used for occasional routine and emergency transmission line operation, maintenance and repair. This use will not cause unreasonable highway or public road congestion. No curb cuts are proposed.

5. During the construction phase, some material and equipment deliveries may require vehicles to stop on or back into a street. During these infrequent occasions, spotters or flaggers will be used to assist vehicles into or out of the corridor. Any temporary access way or temporary access way lane will be designed in profile and grading and be located to allow at least the minimum sight distance measured in each direction consistent with the Town’s ordinances.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 19

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Brian Lanoie: The project entrances meet safe sight distances, are appropriately spaced, and meet traffic safety standards. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

D. Internal Vehicular Circulation

1. Not applicable. No internal drives will be constructed. Motion made by John Talbot: This criterion is not applicable to the project. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

E. Parking Layout and Design

1. Not applicable. No parking lots will be constructed. Motion made by John Talbot: This criterion is not applicable to the project. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

F. Utilities

1. Not applicable. No utilities serving on-site facilities will be installed. Motion made by John Talbot: This criterion is not applicable to the project. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

G. Lighting Design Standards

1. Not applicable. No lighting will be installed per the utility corridor use type. Motion made by John Talbot: This criterion is not applicable to the project. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

H. Signage

1. Not applicable. No signage will be installed. Motion made by John Talbot: This criterion is not applicable to the project. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

I. Fire Protection

1. CMP has committed to outreach and communications regarding fire support related to the construction and operation of the Project. CMP will notify the local fire department prior to the commencement of construction activities of the type of work that will occur, its location, and when the activities have concluded.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 20

2. CMP, in cooperation with local emergency responders, will establish emergency response procedures and protocols that will be followed in the event emergency response to the Project area is required.

3. CMP will review fire support issues in meetings with the CEO and planning officials, and with the public in Planning Board proceedings. This will include a summary of discussions with local fire response personnel regarding records of any past fire events on the corridor, an assessment of locally-available resources, and any additional provisions that have been included in the construction contractors’ scope of work, which will be provided to support local emergency response.

4. Fire suppression requirements for the Project are no different than those for the transmission lines as they currently exist.

5. The water supply will sustain fire suppression requirements recommended for the Project consistent with the recommendations of the National Fire Protection Association for the fire loading level of the proposed development under NFPA 1142, Water Supplies for Suburban and Rural Fire Fighting.

6. The applicant has consulted with the Fire Chief who has scheduled specialized training for emergencies involving high voltage lines. Motion made by Juliet Caplinger: The water supply will sustain fire suppression requirements of NFPA 1142, Water Supplies for Suburban & Rural Fire Fighting. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

J. General Buffering Standards

1. Not applicable. No change in the utility corridor is proposed that would change the visual impacts or warrant special screening. Motion made by John Talbot: This criterion is not applicable to the project. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

K. Historic & Archaeological Resources

1. CMP conducted extensive pre-historic archaeological, historic archaeological, and historic architectural investigations and surveys along the Project route, for State purposes under Chapter 375.11 of the MDEP rules and for federal action under Section 106 of the National Historic Preservation Act (“NHPA”) (16 U.S.C § 470f). CMP consulted with the Maine Historic Preservation Commission (“MHPC”) throughout the state and federal permit application development and approval process.

2. These surveys identified one site in Durham that is eligible for NHPA recommendation; however, this site will be avoided by construction activity; temporary construction fencing to prohibit disturbance of the site will be installed prior to construction activities.

3. Appropriate measures have been proposed to protect historic and archaeological resources.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 21

Motion made by Allan Purinton: The project includes appropriate measures for protecting these resources, including but not limited to, modification of the proposed design of the site, timing of construction, and limiting the extent of excavation. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

L. Financial Capacity

1. CMP secured funding for the Project, which will be fully funded by Massachusetts ratepayers. Furthermore, CMP is a subsidiary of AVANGRID, Inc., a leading sustainable energy company with approximately $41 billion in assets and operations in 24 U.S. states. AVANGRID has two primary lines of business: Avangrid Networks and Avangrid Renewables. Avangrid Networks owns eight electric and natural gas utilities, serving 3.3 million customers in New York and New England.

2. CMP provided as Application Exhibit 9 a Letter of Commitment to Fund from Michael Panichi, Vice President & Treasurer of AVANGRID, Inc., which is the parent company of CMP. Pursuant to the Land Use ordinance, this letter of commitment is prima facie evidence of adequate financial capacity.

• John Talbot moved to strike the first sentence of the first finding and first word of the second sentence as being irrelevant to the demonstration of financial capacity. Marc Derr seconded the motion and the amendment passed unanimously. Motion made by John Talbot: The applicant has adequate financial resources to construct improvements in keeping with the standards. Motion seconded by Allan Purinton: Votes to approve: 5 Votes to deny: 0

M. Technical Ability

1. CMP has extensive experience in the design, construction, and operation of electric infrastructure projects and will utilize existing staff capabilities for this Project. CMP’s delivery system includes 2,919 miles of overhead transmission lines and 23,734 miles of distribution lines, and 205 substations. To support the Project, CMP has engaged a team of highly qualified and experienced engineers, permitting specialists, consultants, and contractors. Motion made by Allan Purinton: The applicant has adequate experience with site development and/or has retained qualified consultants & contractors to complete the project in keeping with the standards. Motion seconded by Brian Lanoie: Votes to approve: 5 Votes to deny: 0 PLANNING BOARD DECISION Motion made by John Talbot: The Planning Board grants site plan approval of the CMP Transmission Line Section 62 Rebuild and Transmission Line Section 64 Rerate subject to the following conditions of approval to be noted on the site plan:

1. The project is to be constructed in accordance with the plans, maps, diagrams, specifications, textual submissions, and testimony presented by the applicant and approved by the Board.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 22

2. Per Section 8.4.K., if the applicant wishes to make any changes to the approved site plan, the applicant must meet all the requirements for a site plan approval for that changed part of the application, i.e., the applicant will go through the site plan review process only for the section of the permit they want changed.

3. Per Section 8.4.L., the applicant shall commence construction of the required improvements within twelve (12) months of plan approval and shall complete said improvements within thirty-six (36) months.

4. Per Section 8.4.M., one copy of the approved site plan must be included with the application for the building permit for the project and all construction activities must conform to the approved site plan, including any conditions of approval.

5. All roadway access points will require a road entrance permit issued by the Road Commissioner.

6. CMP will install properly designed temporary access points to allow for unobstructed stormwater drainage within existing road ditches along the Town and private road rights-of-way. CMP’s contractors will construct timber mat spans over existing road ditches at temporary road access points. Construction contractors may also utilize a temporary culvert buried in riprap, depending on the site-specific conditions as approved by the Road Commissioner. Access points, including any matting or temporary culverts utilized, will be removed once construction and restoration is complete.

7. CMP will also require its construction contractors to follow erosion and sedimentation control best management practices, including care to avoid tracking mud and debris onto public roadways. If determined necessary to prevent mud or sediment tracking, CMP’s contractors will install a berm of crushed stone or erosion control mix at access points to reduce tracking of soil onto the roadway. The contractor is responsible for regular maintenance of access points and roadway entrances, including any street sweeping that may be required. Regular inspections will be performed by CMP’s environmental inspectors and MDEP’s third party inspectors. Inspection reports shall be provided to the Road Commissioner and Code Officer.

8. CMP and its contractors shall abide by spring seasonal weight restrictions on posted roads and equipment with a gross vehicle weight rating over 23,000 pounds will not use roadways as long as seasonal postings are in place.

9. Prior to commending construction, CMP or its contractors are to post a bond or other performance guarantee for $1 million satisfactory to the Road Commissioner to reimburse for expenses necessarily incurred in repairing damage caused to the roads by the project contractors. Motion seconded by Juliet Caplinger. Votes to approve: 5 Votes to deny: 0

7. New Business:

a) Completeness Review of Ruby Farmview Subdivision Amendment to Add 4 Lots, Map 5, Lot 78-B. (Public comment will not be taken)

b) Substantive Review of Ruby Farmview Subdivision Amendment to Add 4 Lots, Map 5, Lot 78-B. (Public comment will not be taken)

Applicant: Michael Copp (Rick Meek – Terradyn Consultants LLC representing Mr. Copp)

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 23

• The Board reviewed preliminary subdivision plan submissions for completeness.

• Juliet Caplinger moved to find the application incomplete and the Planning Board unable to process the application due to the applicant’s need to address the current violation of Section 6.10.I of the Land Use Ordinance. To make a determination of compliance with the Town’s subdivision regulations the Board requires the following information per the conditions of approval of the Ruby Farmview Subdivision:

1. The date of posting of the original performance bond for completion of the project infrastructure;

2. The date of issuance of the occupancy permits for the first four lots in the subdivision;

3. Engineer’s estimate of costs of completing Ruby Farmview Subdivision;

4. Town Attorney legal review of the proposed performance bond at applicant’s expense; and,

5. Town Attorney confirmation that the Planning Board has authority to grant an after the fact extension of the original subdivision approval at applicant’s expense.

• Alan Purinton seconded the motion and it passed by a vote of 5-0.

c) Conditional Use Application for Midcoast Heating & Cooling to Operate a Business at 28 Soper Road, Map 4, Lot 97 (Public comment will not be taken)

Applicant: Matt Sullivan

• Mr. Sullivan explained that the proposal makes no changes to the building or the site.

• The prior car dealership is gone.

• All storage will be inside the building.

• All components of the equipment will be delivered to the project sites.

• All materials removed from job sites will go directly to recycling facilities and will not be stored at the business.

• The Chairman read the draft findings:

LIST OF SUBMISSIONS:

1. Conditional Use Application for change of use of an existing building.

Section 7.4 CONDITIONAL USE REVIEW CRITERIA

A. Review Criteria: Before it issues a conditional use permit, the Planning Board shall find, as a matter of fact, that the proposed use meets the following criteria:

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 24

1. Public Health Impacts: The proposed use will not create unsanitary or unhealthful conditions by reason of sewage disposal, emissions to the air or water, or other aspects of its design or operation.

Findings:

a. The application states that the site has a septic system and trash removal.

b. The business will use the building for office and storage space.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for public health impacts. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

2. Traffic Safety Impacts: The proposed use will not create unsafe vehicular or pedestrian traffic conditions when added to existing and foreseeable traffic in its vicinity.

Findings:

a. No customers will visit the office as all work is done at the customers’ residences.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for traffic safety impacts. Motion seconded by Brian Lanoie: Votes to approve: 5 Votes to deny: 0

3. Public Safety Impacts: The proposed use will not create public safety problems which would be substantially different from those created by existing uses in the neighborhood or require a substantially greater degree of municipal services than existing uses in the neighborhood.

Findings:

a. The business has little to no traffic at the office.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for public safety impacts.

Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 25

4. Environmental Impacts: The proposed use will not result in sedimentation or erosion, or have an adverse effect on water supplies.

Findings:

a. The building is existing and there are no plans to add buildings or change anything existing.

b. No hazardous materials are stored onsite. Any chemicals more than a spray can are delivered to the project site and disposed offsite.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for environmental impacts. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

5. Scale & Intensity of Use: The proposed use will be compatible with existing uses in the neighborhood, with respect to physical size, visual impact, intensity of use, and proximity to other structures.

Findings:

a. The proposed use has less traffic than the prior use.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Marc Derr: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for scale and intensity of use. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

6. Noise & Hours of Operation: The proposed use will be compatible with existing uses in the neighborhood, with respect to the generation of noise and hours of operation.

Findings:

a. The proposed business office will be open from 8 am to 4:30 pm Monday through Thursday and 8 am to 1 pm on Friday. Closed weekends.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 26

Motion made by Juliet Caplinger: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for noise & hours of operation. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

7. Right, Title, or Interest: The applicant has sufficient right, title or interest in the site of the proposed use to be able to carry out the proposed use.

Findings:

a. The applicant has a lease.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered.

Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for right, title, or interest. Motion seconded by John Talbot: Votes to approve: 5 Votes to deny: 0

8. Financial & Technical Ability: The applicant has the financial and technical ability to meet the standards of this Section and to comply with any conditions imposed by the Planning Board pursuant to subsection 7.5.

Findings:

a. No construction or changes are proposed.

• The Chairman asked for any proposed additions, changes, or deletions in the draft findings and no motions were offered. Motion made by Allan Purinton: The applicant has satisfied a reasonable burden of proof of compliance with the criterion for financial & technical ability. Motion seconded by Juliet Caplinger: Votes to approve: 5 Votes to deny: 0

Section 7.5 CONDITIONS OF APPROVAL

A. Planning Board Approval Conditions: Upon consideration of the criteria listed in subsection 7.4, the Planning Board may by majority vote attach such conditions, in addition to those required by other provisions of this Ordinance, as it finds necessary to ensure compliance with those criteria and all other applicable requirements of this Ordinance. Violation of any of those conditions shall be a violation of this Ordinance. Motion made by John Talbot: To apply the following conditions of approval to the permit for conditional use. Motion seconded by Marc Derr: Votes to approve: 5 Votes to deny: 0

1. The project is to be constructed in accordance with the plans, maps, diagrams, specifications, textual submissions, and testimony presented by the applicant and approved by the Board.

PLANNING BOARD PACKET APRIL 24, 2024 PAGE 27

Motion made by John Talbot: The Planning Board grants conditional use approval of the Midcoast Heating and Cooling project at 28 Soper Road, Map 4, Lot 97. Motion seconded by Marc Derr. Votes to approve: 5 Votes to deny: 0

7. New Business:

d) Conditional Use Application for Maine Custom Woodlands LLC to Expand a Business at 1326 Hallowell Rd., Map 8, Lot 12 (Public comment will not be taken)

e) Completeness Review of Site Plan Review Application for Maine Custom Woodlands LLC to Construct a Nonresidential Building at 1326 Hallowell Rd., Map 8, Lot 12. (Public comment will not be taken)

f) Substantive Review of Site Plan Review Application for Maine Custom Woodlands LLC to Construct a Nonresidential Building at 1326 Hallowell Rd., Map 8, Lot 12. (Public comment will not be taken)

• Alan Purinton moved to continue the meeting on April 24 at 6:30 p.m. at the Fire Station with the applications of Maine Custom Woodlands LLC being considered first on the agenda. Brian Lanoie seconded the motion and it passed unanimously.

8. Adjourn

Juliet Caplinger moved to adjourn the meeting. Allan Purinton seconded; motion carried 5

– 0. Meeting adjourned at 8:50 pm.