TRANSPORTATION

2012

FLEET UPGRADE: CAPITAL PROJECTS TWO 77 PASSENGER BUSES COMPLETED

MAST LANDING CARPET BUS 33 REPLACEMENT

TWO MILES OF CARPET MAST LANDING CARPET INSTALLED

1

MORSE STREET BUS ROAD    WIDENED ACCESS ROAD FOR
      RE-PAVING                   SAFETY

  DISH WASHERS @ HIGH       POWNAL FREEZER IN
SCHOOL AND MORSE STREET         KITCHEN

POWNAL CARPET            POWNAL CARPET IN
 REPLACEMENT               CLASSROOMS

2

Pownal Phone and Intercom    MIDDLE SCHOOL BOILER
System Safety Improvement        REPLACEMENT

HIGH EFFICIENCY BOILERS     High Efficiency Water Heater

MORSE STREET CLOCK

Frequency Drives Added SYSTEM

3

  Morse Street School           Choices Durham Community
New clocks and controller                School

Building Improvement Choices Freeport High School Freeport Middle School

Building Improvement NATURAL GAS FOR HEATING Central Office NATURAL GAS IS THE PRIMARY SOURCE OF ENERGY USED TO HEAT

 POWNAL ELEMENTARY SCHOOL

 FREEPORT HIGH SCHOOL,

 MORSE STREET SCHOOL,

 MAST LANDING SCHOOL

4

2012-2013 NATURAL GAS FOR HEATING NATURAL GAS FOR HEATING

 BEGINNING THIS HEATING SEASON NATURAL GAS WILL BE THE MAIN 2011-2012 cost per Therm $1.00 SOURCE OF ENERGY TO HEAT 2012-2013 cost per Therm $.97

 FREEPORT MIDDLE SCHOOL Fuel oil equivalent per gallon $1.34 Propane equivalent per gallon $.88

Natural gas cost savings due to Natural Gas Freeport Middle reduced lock in price $.03 per School Therm $3,363

 19,000 gallons of heating oil 2011-2012 Therms of natural gas cost @ Therms of natural gas cost @ 1.00 per Therm $.97 per Therm  $72,200 cost using heating oil 2011-2012 2012-2013

 26,410 Therms of natural gas to replace

      Morse St. $20,632              Morse St $20,031      19,000 gallons of heating oil
        Pownal $10,061                 Pownal $ 9,759
                                                          Total cost of natural gas to replace heating
  Mast Landing $17,864           Mast Landing $17,328
  Freeport High $37,670         Freeport High $36,539      oil $25,617
Freeport Middle $26,410        Freeport Middle $25617
          Total 112,637                Total $109,274
                                                         Anticipated Savings this year $46,583

Natural Gas costs Avoidance                                   Electrical Savings Change of Rate
              Morse Street School $40,787                 Beginning in January of 2011 RSU5
        Pownal Elementary School $28,621                   entered into a rate agreement with
             Mast Landing School $28,428                   Maine Power options to reduce our
             Freeport High School $83,861                  average rate for electricity from
           Freeport Middle School $46,583                  .0919 to a two year rate of .0575
             Total Cost Avoidance $228,280
                                                          As a result of this change we will see
                                                           savings for electrical power of
  Based on $3.80 per gallon of heating oil                 $23,430 over a one year period

5

    Field Maintenance Equipment                                   Field Maintenance Equipment
Beginning in July of 2012 RSU5 entered into a                    The Town of Freeport agreed to purchase
  contract to mow 17 acres of fields located on
  Hunter Road                                                      this equipment and to allow RSU5 to
                                                                   retain ownership after completion of this
To accomplish this we requested additional                         contract
  equipment to include

   Groundmaster 4100-D mower with north                         This equipment is being used throughout
    American Road Package
   Topdresser 2500 assembly                                       RSU5 as well as Hunter Road fields and
   Workman MD with cargo bed                                      has proven to be a great time saver for
   Rahn Groomer w/springtime scarifier                            our field maintenance people
   Aervator w/rake, roller, standard tine & seed box

Field Maintenance Equipment Field Maintenance Equipment Mower

 Groundmaster 4100-D mower with north American Road Package, mows a path 10.5 feet wide allows us to cut mowing time such as at the middle school from 6 hours to 1 hour

 Topdresser 2500 assembly, spreads organic material onto the fields to improve the soil

 Workman MD with cargo bed, general duty work cart used to carry equipment (paint, tools etc.)

 Rahn Groomer w/springtime scarifier, used to smooth out baseball infields and remove unwanted grass

 Aervator w/rake, roller, standard tine & seed box, aerates rolls and plants grass seed to improve seed germination from 30% to 85 to 90%

Field Maintenance Equipment Field Maintenance Equipment Aervator w/rake, roller, standard Workman MD with cargo bed tine & seed box

6

Field Maintenance Equipment
  Topdresser 2500 assembly                             2013-2014 Anticipated Capital Budget

Taken from RSU5 Capital Plan

Adopted January 2010

Revised 10-12-2011

     2013-2014 Anticipated Capital Budget*
                                                             Anticipated Capital Budget 2013-2014
   Bus 77 passenger Handicapped Equipped     $30,000
   Pick up Truck                              $30,000
    Mast Landing Playground Equipment         $10,000


   Middle School Gym Roof                    $50,000
                                                          Proposed capital                $400,000
   Middle School Elevator Upgrades            $40,000    Existing capital debt service   $394,483
   Audio/Video Enhancements                  $55,000
   Morse Street Carpet A & B wings           $30,000     Existing bus payments           $117,788
   Pownal Trim (paint/stain)                 $10,000
   Dish Washer Mast Landing                  $14,000     Total capital debt service      $912,271
   Pownal Main Hall Carpet                   $25,000
   Parking Lot Sander                         $8,000
    Morse Street Roof Repairs Gym & D Wing   $50,000
                                                             Proposed budget increase      $38,530


   Capital Reserves                          $48,000    
              total                          $400,000

Replace Bus 37 Handicapped Pick up truck for field work Equipped 1997 Bus

7

Mast Landing Playground Morse Street Carpet Wing A&B Equipment

Pownal Trim Repairs         Middle School Gym Roof

Middle School Elevator Upgrade   Mast Landing Dishwasher

8

Morse Street D Wing Roof                     2014-2015 Anticipated Capital Budget

   Buses (2) 77 Passenger (funded through retired
    bus debt)                                           $0
   Audio/Video Enhancement                         $55,000
   Middle School re-pave Access Road              $150,000
   Field Maintenance Tractor                       $33,000
   Morse Street Kitchen Steamer                    $15,000
   High School Steam Table                         $16,000
   Mast Landing Resurface Parking Lot              $50,000
   High School Add Cabinets Science Room 401       $15,000
   Capital Reserves                                $66,000
                              Total                $400,000

    Anticipated Capital Budget 2014-2015         2015-2016 Anticipated Capital Budget
                                                Buses (2) 77 Passenger (funded through
                                             retired bus debt                                                $0
                                                Audio/Video Enhancements                               $55,000
                                                High School Security System Upgrade                    $15,000
                                                 Morse Street Carpet C Wing
  Proposed capital                $400,000
                                             
                                                $20,000
                                                High School Elevator Upgrade                           $35,000
 Existing capital debt service   $383,220      High School Fire alarm Upgrade                         $15,000
                                                Mast Landing Security Upgrade                          $15,000
 Existing bus payments           $151,696      Middle & Mast Landing Outside Lighting upgrade         $10,000
                                                Pownal Windows                                         $50,000
 Total capital debt service      $934,916      Pownal Paving                                          $60,000
                                                High School Air Handler                                $50,000
                                                High School Carpet Main Hall Classrooms                $15,000
                                                Pownal Clock System                                    $10,000
                                                 Mast Landing Fire protection Upgrade                   $15,000
   Proposed budget increase      $22,646    

   Capital Reserves                                       $35,000
                                                  Total   $400,000

Anticipated Capital Budget 2015-2016           2016-2017 Anticipated Capital Budget

                                                Bus (1) 77 Passenger (funded through Retired Bus Debt)   $0
                                                Vans (2) Replacement                                   $60,000
 Proposed capital                $400,000      Pownal Septic System                                   $50,000
                                                 Middle School Fire Alarm Upgrade                       $15,000
 Existing capital debt service   $371,789   

                                                Morse Street Security Alarm Upgrade                    $15,000
 Existing bus payments           $147,000      Middle School Security Alarm Upgrade                   $15,000
                                                 Pownal Well & Tanks                                    $45,000
 Total capital debt service      $918,789
                                             

                                                Middle School Carpet Library                           $12,000
                                                Central Office Roof Main Building                      $35,000
                                                Morse Street D Wing Carpet                             $25,000
   Proposed budget decrease      -$16,127      Morse Street Elevator Upgrade                          $35,000
                                                Capital Reserves                                       $93,000
                                                Total                                                 $400,000

9

Anticipated Capital Budget 2016-2017         2017-2018 Anticipated Capital Budget

 Proposed capital                $400,000
                                                 Buses (2) 77 Passenger (funded through retired bus debt)     $0
 Existing capital debt service   $360,133   

                                                Central Office Carpet upper and lower                   $18,000
 Existing bus payments           $147,000      Morse Street Fire Alarm Upgrade                         $15,000
                                                 High School Roof Replacement                          $250,000
 Total capital debt service      $907,133
                                             

                                                Athletic Fields Upgrade                               $100,000
                                                Capital Reserves                                       $17,000
                                                                              Total                    $400,000
   Proposed budget decrease      -$11,656

Anticipated Capital Budget 2017-2018

 Proposed capital                $400,000
 Existing capital debt service   $348,133
 Existing bus payments           $148,200
 Total capital debt service      $896,333

   Proposed budget decrease      -$10,800

10