RSU NO. 5 DURHAM -FREEPORT- POWNAL CAPITAL/ FACILITIES PLAN DECEMBER 2009

Revised 10-13-10

Revised 10-12-11

Revised 10-10-12 Proposed capital

. Item Descriptions

Current Debt Maturity Schedule Energy Efficiencies

RSU No. 5 - Capital Plan RSU No. 5 - Capital Plan : i i _ en _ i _ nnn n.Proposed Debt Service Existing Total Capital Budget _ a nln : Conn __,New__ (Excluding Bus/Van_ Debt Service Impact npn _.....ftem 1 Bus (1) 77 Passenger Handicapped equipped = $30,000 Se ccovvvannnn vane conn tem 2 Pick-up Truck ae et $30,000 meewewnied | scr _...{tem 3, Mast Landing Playground Equipment ene 10,000 enna nn cuuumnnnunnnndtem 4 Middle School Roof Repairs (Gym) 850,000 i . ; _vwwwww10dtem 5 Middle School Elevator Upgrade _ $40,000 a i “onsen wsnwn..ftem 6 Audio/Video upgrades Ce $55,000 sven _ww.dtem 7 Morse Street Carpet A & B Wings Sennen pee $30,000 ee ns ee none _....tem 8 Pownal Trim (paint/stain) cone 10,000 nen fn Lownie, ftem 9 Dish washer MastLanding Ln $14,000, a a en | jossmasnunnanisn wwesnnnadt @M 10 Pownal Main Hall Carpet ont $25,000, . en ee fossa coonwmnnn.ftem 11 Parking lot Sander tt on, 38,000) a fone osnnaenansnne .... tem 12 Morse Street Roof Repair (D wing,Gym) cant nn $50,000, _| no an ovina _vwumana.tem 13 Capital Reserves : ns ___-348,000 ! | eens a evant $400,000, _ $394,483 $117,788 $912,271 $38,530 counnmnaumnunun.ttem 1 Bus (2) 78 Passenger (funded through retired bus $0, ____| oe ee — sous <wwmnnnttem 2 Audioivideo upgrades $55,000 ; | ee svn nn Listen ttem 3 Middle School Re-pave Access Road _ ___ $150,000, _| en connuinnnnnnnnnnnmnadtem 4 Field Maintenance Tractor $33,000. _ | to. _onammuunnnntem 5 Morse St Steamer (kitchen) ; $15,000, ; ! | a4 containment eM 6 Kitchen Equipment HS Steam Table $16,000 to | i a cnstininnunietem 7 Mast Landing Resurface Parking Lot $50,000, ____| | ! a nuns _wwnnwnnttem 8 High School add cabinets to room 401 vo $15,000 | en : nnn __ltem_ 9 Capital Reserves __ $66,000) i es seen ee $400,000. $383,220 $151,696 $934,916 $22,646) oontnnninniinnnniinnunnndteMm 1 Bus (2) 77 Passenger (funded through retired bus $0. | | | cocuiinnwmnmninnnnnundt Mm 2 Audio/video upgrades |__ $55,000. an | ne : Lo wwwiiiiiitem 3 High School Security System upgrade $15,000, | 5 ee sunnnnvinnne Lo uwmnndtem 4 Morse StCarpetC Wing _.. $20,000, | a coc uniinnnininnnnndt eM § High School Elevator Upgrade $35,000, ee ee ee | cocwinnnnnnnnnuinnnadt eM 6 High School Fire Alarm Upgrade «$18,000, ee ee comnnnnnnninattem 7 Mast Landing Security Upgrade $18,000 es ee coawunitninnnaltem 8 Middle & Mast Landing Outside Lighting Upgrade $10,000 es ee | conned em 9 Pownal Windows ce 990000 ne nnd 10 Pownal Paving ___,__. $60,000 a ee scocuununstnnvannsnunnannsn item 14. High School Air Handler nn aren 950,000) ee ee a ee nnn tem 12 High School Carpet Main Hall Classrooms _ BIS 000 - . _...tem 13 Pownal Clock System 0 $10,000 snnnuinnnnnanunn _ttem 14 Mast Landing Fire Protection ep $16,000 en cnninnniinnanninnininnnne CApital Reserves _____ $35,000. i i | oon innit. $400,000, $371,789 $147,000 «$918,789 -$16,127 tem 1 Bus (1) 77 Passenger (funded through retired bus SO eps nnn tem 2 Vans (2) Replacement Cnr 960,000 : . - octet Item 3 Pownal Septic System : $60,000 ns Oe sna vvnu.uitem 4 Middle School Fire alarm Upgrades 815,000 : | . Item 6 Morse St Security Alarm Upgrade $18,000 uinaninnnnninunnnninnvannunne tem 7 Middle School Security Alarm Upgrades $18,000 : a ee . !tem 8 Pownal Well & Tanks $45,000 : __| _ <numnnunnnenninssnsce {tem 10 Middie School Carpet Library & Office . $12,000 : en nn a Item 11 Central Office Roof Main Building $35,000 i 4 . _ sons com ftem 12 Morse St D Wing Carpet_ ener $25,000 | : i a “unnnnnannen item 13 Morse St Elevator Upgrade _ . a 936,000 | eee ee “msn item 14 CapitalReservves 0 $93,000. a i _ oven $400,000 $360,133. $147,000 $907,133 -$11,656 a Item 1 Bus (2) 77 Passenger (funded through retired debt) = $0. i [Ree Gn “vsusmnnnnnnnvannasn item, 2 Central Office Carpet Business Office ______$8,000, 4 i :

— {tem 3. Central Office Carpet (upstairs) $10,000, ee a ee ittuntuanninunuunnnintem 4 Morse St Fire Alarm Upgrade $15,000, ee eee ee a Item 5 High School Roof Replacement 100,200 & 300 wings | $250,000. ! : a ae vssnunininumnunmenunnrnnnnnnelte 6 Athletic Fields Upgrade __$100,000 | al jo sn ; ltem 7 CapitalReserves 0 $7,000 - : os ponents i ee 400,000. 348,133.00 148,200.00. $896,333 -$10,800 uum !tem 1 Bus (2) 77 Passenger (funded through retired debt $0, \ ! —_ osnimnnaninsunnmnininnannninnmnnnanntt ln 2 Pownal Gym Roof . |. $30,000, \ | | reer a. ttem 3. Pownal Fuel Tank oo 350,000 | | 1 sneer _uftem_4/Pownal Windows ___ $100,000) i i a . ltem 5 Athletic Fields Lights eee ee 100,000, i i | ocsinnuinnwannianinnanunnnnnndtem 6 Durham Snow Blower _ pene 810,000, i : ee oun couuua.ttem 7 High School Bathrooms 100&300 wings. ___ $39,500. \ i jo onuuiiimunnnaninniiannnnnnnnnnlt 8 CapitalReserves __...$70,500 | | | — ee $400,000, i i «onsen enn

Requested Repairs from School Facilities Tours

Pownal resurface trim outside of building capital fy 14 replace teachers bathroom light operating budget fy 13 (now) paving existing and gravel lot expand playground capital fy 16 connect rear paths capital fy 16 add lighting to playground area operating budget fy 14 mount projectors in K, 2nd grade , & music room done music room tile (asbestos) in good working order put in 20 yr 5 yrs out Playground repairs fy 15

Middie gym vestibule tiles (remove) operating fy 14 rear hallway floor tiles loose operating fy 14

5 Iced projectors need to be installed operating fy 13 (now)

siding in rear operating fy 14 stem bathroom paint and new light operating fy 13 (now) paving Capital fy 15

High room 403 provide water and gas hookups for fume hood get quote (137) 14? guidance replace one window add electrical outlets operating fy 14 entryway- repair floor referendum

FPAC install h-cap entryway add to operating Major maintenenace 508 health room replace tiles (ceiling) operating fy 13 (now) bathroom across sped ed room needs upgrade (floor, door) referendum

102,103,104 walls are not sound proof referendum

JMG windows need replacing in 20 yr cap fy 21

401 add cabinets under counter add to fy 15 cap

507 art room windows need replacing in 20 yr cap fy 21 health office add counter and overhead cabinets add small under counter refrigerator operating fy14

Mast Landing playground equipment needs replacing add slide etc. Capital fy 14 $10,000. wooden structure in front of school need treatment operating fy 14 internal wiring for technology tech plan Audio video Morse electrical work for ceiling mounted projectors operating fy 14 intercom system operating fy 14 carpets A & B wings in capital FY 14 paint A&B wing classrooms in painting plan fy 14 with carpets

Capital Budget Requests

2013-2014

Item 1

Bus (1) 77 passenger Handicapped Equipped

Proposal:

Replacement of one International Bus with handicapped access this bus is a 1997 bus with over 150,000 miles. (Replacement recommendations By the State Department of Education are 10 years 150,000 miles)

Justification:

We propose to replace and sell one 1997 handicapped equipped bus as part of the management of our bus fleet due to the current condition of this bus

Expected Benefit:

Improvement to the fleet by removal of aging equipment increasing dependability

Consequences if not approved:

Continued use of older equipment and Higher maintenance costs

Budget:

Cost associated to purchase $30,000 (1° payment of 3 year lease purchase)

Item 2

Pick up truck

Proposal:

Replacement of 1995 Maintenance truck used to service fields and snow removal Justification:

This 1995 pickup truck is currently used daily in the fields and for maintenance work the body and undercarriage is rusted badly and vehicle will not be road worthy within a year

Expected Benefits:

Improvement to our truck fleet with dependable vehicle available to our work force Consequences if not approved:

Higher maintenance cost to restore vehicle to road worthiness

Budget:

Costs associated with this purchase $30,000

Item 3

Mast Landing Playground equipment

Proposal:

To appropriate $10,000 towards improvements to Mast Landing Playground Justification:

The Playground at Mast Landing School is in need of an upgrade due to loss of several pieces of equipment Expected Benefits:

A safer play space for students at Mast Landing School

Consequences if not approved:

Continued decline of current equipment and lack of play area for students Budget:

Appropriate $10,000 to supplement fund raising efforts

Item 4

Middle School Roof repairs

Proposal:

We propose to replace the Gym roof at Freeport Middle School

Justification:

The roof over the gym is at the end of the life cycle and due to the condition of the shingles it is highly recommended that this roof be replaced

Expected Benefits:

A tight roof eliminating leaks and future problems

Consequences if not approved:

Leaks in roof possible indoor air issues from rain penetrating building envelope Budget:

Cost associated with this project $ 50,000

Item 5

Middle School Elevator Upgrade

Proposal:

We propose to upgrade the controls of the middle school elevator for more reliable service Justification:

We have continued issues with this elevator becoming stuck between floors, control relays are worn and in need of replacement Expected Benefits:

More reliable elevator service less likely to trap riders in elevator

Consequences if not approved:

Unreliable service, continued issues with riders becoming stuck in elevator

Budget:

Cost associated with this project $40,000

Item 6

Audio/video upgrades

Proposal:

We propose to install audio/video upgrades at schools currently without this technology Justification:

Effective teaching tools for enhanced hearing and learning

Expected Benefits:

Better learning environment with enhanced ability for student learning

Consequences if not approved:

Students not receiving current technology in today’s classroom environment

Budget:

Cost associated with this project $55,000 plus ($30,000 technology monies) each year for completion over 3 years Item 7

Morse Street Wings A&B carpet replacement

Proposal:

We propose to replace the carpet in wings A & B at Morse Street School

Justification:

This carpet is separating from the backing in all classrooms and hallway which may cause a tripping hazard Expected Benefits:

Improved appearance, removal of a tripping hazard upgrades at end of life cycle

Consequences if not approved:

Continued breakdown of current carpet which may become a tripping issue

Budget:

Cost associated with this project $30,000

Item 8

Pownal Elementary building trim (paint, stain)

Proposal:

We propose to paint/stain and replace any damage to Pownal School trim Justification:

We propose to paint trim on the outside of Pownal Elementary School Expected Benefits:

Increased life span of current trim improved appearance of building Consequences if not approved:

Increased damage to building and possible water infiltration to building

Budget:

Cost associated with this project $10,000

Item 9

Dish Washer Mast Landing School

Proposal:

We propose to replace the dish washer at Mast Landing School Justification:

Current unit is past its life cycle and often in need of repairs Expected Benefits:

Continued upgrading of equipment with energy efficient models Consequences if not approved:

Increased repair cost with older equipment less energy efficient unit Budget:

Cost associated with this unit $14,000

Item 10

Carpet Pownal Main Hall

Proposal;

We propose to replace the carpet in the main hall, this carpet is at the end of its life cycle Justification:

This carpet is at the end of its life cycle and is in need of replacing Expected Benefits:

Better appearance of the building and life cycle updates Consequences if not approved:

Continued appearance issues due to age of carpet,

Budget:

Cost associated with this project $25,000

Item 11

Parking Lot Sander

Proposal:

We propose to purchase a parking lot sander for our maintenance truck Justification:

We currently sand walkways and parking lots as they become icy when snow removal company in finished or not required to be on property

Expected Benefits:

Increase safety of our students, staff and public who use the buildings Consequences if not approved:

Potentially dangerous icy areas around school grounds

Budget:

Costs associated with this item $8,000

Item 12

Morse Street Roof repair Wing D and Gym Area Proposal:

We propose to replace the shingled roof over the Gym and Wing D at Morse Street School Justification:

This roof is in poor shape and in need of replacement Expected Benefits:

Water tight building leaks removed

Consequences if not approved:

Leaks from weather penetrating building envelope Budget:

Cost associated with this project $50,000

Item 13

Capital Reserves $48,000

2104-2015 | $886,467.00, $482,277.94) $1,368,744 2015-2016 | $886,467.00, $463,883.75. $1,350,350.75 2016-2017 | $886,467.00; $445,489.56 $1,331,956.56 | ee 2017-2018 | $886,467.00, $427,095.37, $1,31356237 spss npn concn es ee ee 2021-2022 | $886,467.00) $307,971.93. $1,194.438.93 [nnn fee = es ce a 2026-2027 | $886,467.00) $149,985.79 $1,036,452 79 2027-2028 | $886,467.00, $116,105.02 I 00S eee $886,467.00, $72,880.89 $95 93978 pion) 2029-2030 | $886,467.00) $24,710.27 Totals | $16,842.879.00 $6,104.446.90 $22.94732590 bo

5:2 SO oe Princi all Interest. Principal : Interest___Principal|__Interest___ Principal, _Interest, sss eee ee a a rn Ee Totals | $133,750.00 | $34,832.82 | $2.625,000.00 $735,137.50 | $390,000.00 $40,425.00 | $8.160.00 | $239.50 © $3,967,544.82 | i i |

stinging on Shared Debt S a) : : | os iOS i 2g i : ‘ 1&5 1 | State Revolving Reno Funds) cope en

ae Principal | Interest | Principal Interest: Principal | Interest! Principal) _ Interest Principal: Principal | Interest; a 2011-2012 | $32,804.73) $1,886.46 $144,431.82, _ $66,968.51, $40,000.00, $11,659.00, $10,920.00, $477.75 $52,432.94. $108,834.00) o. ce 2012-2013 | $15,459.29, $266.67 $147,954.55 $55,562.22, $40,000.00 $7,147.01, $10,920.00, $164.00 $52,432.94 $108,834.00, $63,814.82) $502,555.50, 2013-2014 a $147,954.55 $49,459.09 $40,000.00 $5,281.56 “oc suesie 5 108,834.00; $61,469.45) $412,998.65) F104 0TS tn BLAT,954.55 $43,540.91 $40,000.00 $4,12066 $108,835.00, $59,211.14) $403,662.26 2015-2016 | $147,954.55 $37,622.73. $40,000.00. $4,666.40 en $108,835.00, $56,952.81, $396,031.49 ceutnnsnnnne 206 ns L44,431,82. $31,775.00, $40,000.00, $3,018.27, von 108,835.00) $54,694.48) $382,754.57, PONT 20 1B $144,431.82 $25,275.57, $40,000.00, $1,511.06 tis wintannine armen. $108,835,00) $52,436.16) $372,489.61) 2018-2019 | $144, 43 1.82 $18,053.98 $40,000.00 $273.33, $108,835.00 _. 949,793.10) $361,387.23)

2109-2020) SAAB 82 $10,832.39 $108,835.00) $47,150.04) $311,249.25

2020-2021 | $144 431.82 $3,610.80 $108,835.00, $43,432.78) $300,310.40) es ee ce bets annie vine! 08,835.00) $37,810.91) $146,645.91) — 2022-2023 fede the ne coontefnnnnnnnnin seins ound L08,835,00) $33,647.97) $142,482.97 2023-2024, — ee $108,835.00) $29,801.19) | $138,636.19 snusunsnvenre an ee ee ce ee ae co eet initia 108,835,00) $25,954.42) $134,789.42 20252026 es nines sain iit $108,835.00) $22,486.40) $131,321 AO). 2026-2027 i, $108,835.00 818,414.34) $127,249.34 2027-2028 nn es Ss re ne See ee ee $108,835.00) $14,254.66} $123,089.66) un .

2028-2029 | $108,835.00) $8,947.87) SUNT, 782.87)

2029-20380 nn eee Sn ___ $108,835.00 oo BME TSL SU 868.78 Totals $48,264.02 | $2,153.13 $1,458.409.12 $342,701.30 $320,000.00 $37,677.29 $21,840.00 $641.75 $104.85 88 $2.067.862.00 $740,406.52) | $5,183. 880.91 |

Goal 5. Explore and implement s range of strategies to support Energy Efficiencies and cost savings. This initiative is as important to the district financially as it is educationally. This effort will enable us to research ways to reduce our budgets in all areas while we demonstrate effective use of sustainable resources for our students. Energy Efficiencies- Completed

High School

Energy Management System — 2008

Boiler upgrade with efficient burner controls “AutoFlame”-2008 Frequency drives on all circulator pumps —2008

Merv 14 filtration -2008

New unit-ventilators -2008

Bypass valves all unit-ventilators -2008

Occupancy sensors in classrooms -2008

Co2 sensors in classrooms -2008

Lighting upgrade-school wide -2008

Re-roofing with added insulation -2009

Exhaust air controls -2008

Re-roof art area with added insulation -2005

Re-roof gym with added insulation -2011

Natural Gas conversion -2010

Middle School

Earned Energy Star Rating -2007

Energy management system -2007

Bypass valves at air intake coils to 24 volt controls -2007

Removal of old pneumatics -2007

Added insulation older section of building-2008

Added insulation on pitched roof to R-40 -2008

Lighting upgrades school wide -2007

Natural Gas conversion -2012

Mast Landing School

Energy management system -2008

Lighting up-grades school wide -2007

Occupancy sensors -2007

Natural Gas -2011

Morse Street School

Re-roof with added insulation -2006

Limited energy management but existing controls calibrated-2005 Lighting up-grade school wide -2007

Replaced Electric water heater-2010

Natural Gas-2010

Pownal Elementary School

Added insulation in attic -2005

Enclosed front entry -2010

Upgrade Gym Lighting -2010

Natural Gas -2010

District Wide

Continued use of recycled equipment — ongoing (Lighting, ceiling tiles, furniture, etc)

Source: , linked from www.rsu5.org/board-of-directors-and-policies/board-committees/standing-committees/finance-committee. Text copied out by software (pdftotext, then OCR); no wording corrected.