Skip to content

10-25-17 5-Year Capital Plan Presentation

Monthly financial reports · Finance Committee · October 25, 2017 · 39 pages · 1,029 words · all RSU 5 documents · the district's file →

Text copied out by software, not the document itself. Layout, tables and figures may not survive. The district's copy is authoritative; check it before relying on this text.

5 Year Capital Plan Update October 25, 2017

2017-2018

CAPITAL PROJECTS COMPLETED

8 Additional Buses Added To Fleet

8 Additional Buses Added To Fleet

■ State recommends 10 year replacement cycle or 100,000 miles

■ 2 buses were purchased to replace aging buses in fleet bus 23 & 24

■ 6 buses to provide transportation to Durham students formally contracted through BoMar Transportation

Replacement Of Boilers

Mast Landing School

Replacement of Boilers Mast Landing School

■ The replaced boilers were at the end of the life cycle

■ These boilers both leaked and had been repaired many times

Morse Street School Convert Boiler Two to Natural Gas (Duel Fuel)

Morse Street School: Convert Boiler Number Two to Gas (Duel Fuel)

■ Conversion to Natural Gas:

• Allows for redundancy in the event of a failure with boiler one.

■ Duel Fuel:

• We still have the ability to use heating oil if needed.

Morse Street School Replacement

of Two Boiler Sections Boiler One

Morse Street School Replacement

of Two Boiler Sections Boiler One

(September, 2017)

■ This repair was an addition to the boiler changeover to natural gas.

■ Leaks were discovered during testing and firing in early September.

■ Finance Committee approved funding on

9-27-17 for these repairs using “Major Maintenance and School Contracted Transportation Savings.”

Durham Heat Pump Repairs Over eleven repairs being completed

Every heat pump has at least one repair needed

Finance Committee approved funding on 9-27-17 for these repairs using “Major Maintenance and School Contracted Transportation Savings.”

Efficiency Maine Incentives $20,601

■ Mast Landing burner upgrade done at boiler replacement cost $5,638

• Rebate from Efficiency Maine $3,828 for a completed project cost of $1,809

■ Morse Street burner upgrade to include duel fuel cost $21,206

• Rebate from Efficiency Maine $10,086 for a completed cost of $11,119

■ Freeport Middle School burner upgrade cost of project $7,338

• Rebate from Efficiency Maine $6,687 for a total project cost of $650

Middle School Roof Over Locker Rooms and Office

Middle School Roof Over Locker Rooms and Office

■ Old roof past life span at 32 years

■ Old roof leaked often requiring many repairs throughout the year

Mast Landing School Windows

Mast Landing School Windows

■ Solid vinyl double glazed windows for energy efficiency

■ Improvements to the building envelope

■ Old windows were worn out and past the recommended life span

Van Added To Fleet

(September, 2017)

■ Van added to fleet

• Service students with special needs

■ Finance committee approved funding on 9-27-17

• Savings from student contracted services account

Van Added To Fleet

MORSE STREET: DOORS AND LOCKS

■ Replaced due to safety concerns

• Code Red

■ Many doors worn out

• Hardware did not operate properly

MORSE STREET DOORS AND LOCKS

Morse Street School Playground

2018-2019 Anticipated Capital Budget

2018-2019 (FY 19)

Item 1
          Bus (2) 77 Passenger (funded through retired bus debt)        $0
Item 2
          Pownal School Doors and Locks Upgraded                    $40,000
Item 3
          Morse Street School Bathroom Renovation (floors only)      $5,000
Item 4
          Middle School Phone Upgrade                               $15,000
Item 5                                                             $180,000
          Durham Heat Pump Replacement (3)
Item 6
          High School Roof Replacement 300 Wing                     $95,000
Item 7                                                              $50,000
          High School Phone System
Item 8
          Morse Street P/A System Upgrade                           $15,000
Item 9
          Capital Reserves                                              $0

$400,000

Pownal Doors and Locks

Upgrade

■ Replaced due to safety concerns

• Code Red

■ Many doors worn out

• Hardware did not operate properly

Pownal Doors and Locks

Upgrade

Morse Street School Bathroom Floors

Middle School Phone Upgrade

■ System is at the end of life cycle

■ Lines are unclear

■ Phone company and phone vendor have made repairs many times

Durham Heat Pumps

Durham Heat Pumps

High School 300 Wing Roof Over

Library

High School 300 Wing Roof Over

Library

■ Many calls to repair leaks throughout the year

■ Roof is a at the end of it’s life cycle 37 years (1980)

High School Phone Upgrade

■ Intercom unable to be heard by students in halls

■ School growth limits phone effectiveness

■ Safety concern: Code Red

High School Phone Upgrade

Morse Street P/A Upgrade

2019-2020 (FY 20)

Item 1   Bus (1) 84 Passenger (funded through retired bus debt)        $0
                                                                  $180,000
Item 2   Durham Heat Pump Replacement (3)
                                                                   $35,000
Item 3   Mast Landing Elevator Upgrade

Item 4   Morse Street Renovation Bathrooms                         $15,000
                                                                   $20,000
Item 5   Pownal Main Office and Nurses Office Remodel

Item 6   High School Convert Boiler 1 to Gas                       $64,000

Item 7   High School Shades                                        $40,000

Item 8   Pownal Cooler, Freezer and Hot Plates (2)                 $26,000
                                                                   $20,000
Item 9   Capital Reserves

$400,000

2020-2021 (FY21) Item 1 Bus (2) 77 Passenger (funded through retired bus debt) $0

Item 2
         Morse Street Elevator Upgrade                             $40,000

Item 3
         Durham Heat Pump Replacement (3)                         $180,000

Item 4
         Pownal Heating Control Upgrade                            $24,000

Item 5
         Pownal Flooring in Room 5 (Asbestos )                     $20,000

Item 6
         Pownal Windows                                           $130,000

Item 7
         Capital Reserves                                           $6,000

$400,000

          2021-2022 (FY22)
Item 1    Bus (2) 77 Passenger (funded through retired debt        $0
Item 2    Maintenance Truck (or Van)                           $25,000
Item 3    High School Elevator Upgrade                         $40,000
Item 4    Central Office Windows Business Office                $8,000
Item 5    Morse St Fire Alarm Upgrade                          $15,000
Item 6    Durham Heat Pump Replacement                         $60,000
Item 7    Durham Parking Lot Lighting to LED                   $25,000
Item 8    Central Office Carpet Business Office                $18,000
Item 9    Pownal Restroom Remodel                              $20,000
Item 10   High School Paving Teachers Parking                  $80,000
Item 11   Pownal Boiler                                        $45,000
Item 12   Capital Reserves                                     $64,000

$400,000

2022-2023 (FY 23)

Item 1    Bus (1) 84 Passenger (funded through retired bus debt)        $0
Item 2    Durham Parking Lot Repairs                                $20,000
Item 3    Pownal Steamer                                             $7,000
Item 4    High School Auditorium Carpet                             $15,000
Item 5    Mast Landing Steam Kettle                                 $30,000
Item 6    Middle School Windows Rear of School                      $45,000
Item 7    Mast Landing Phone System                                 $20,000
Item 8    Middle School Nurses Office Expansion                     $50,000
Item 9    Middle School Replace Siding on Additions                 $50,000
Item 10   Middle School and Mast Landing Key Card Entry            $130,000
Item 11   Pownal Security Upgrade                                   $10,000
Item 12   High School Reside Portable Building                      $10,000
Item 13   Capital Reserves                                          $13,000

$400,000

Thank You for Supporting Our Facilities in RSU5!

Source: , linked from www.rsu5.org/board-of-directors-and-policies/board-committees/standing-committees/finance-committee. Text copied out by software (pdftotext); no wording corrected.