5 Year Capital Plan Update October 25, 2017
2017-2018
CAPITAL PROJECTS COMPLETED
8 Additional Buses Added To Fleet
8 Additional Buses Added To Fleet
■ State recommends 10 year replacement cycle or 100,000 miles
■ 2 buses were purchased to replace aging buses in fleet bus 23 & 24
■ 6 buses to provide transportation to Durham students formally contracted through BoMar Transportation
Replacement Of Boilers
Mast Landing School
Replacement of Boilers Mast Landing School
■ The replaced boilers were at the end of the life cycle
■ These boilers both leaked and had been repaired many times
Morse Street School Convert Boiler Two to Natural Gas (Duel Fuel)
Morse Street School: Convert Boiler Number Two to Gas (Duel Fuel)
■ Conversion to Natural Gas:
• Allows for redundancy in the event of a failure with boiler one.
■ Duel Fuel:
• We still have the ability to use heating oil if needed.
Morse Street School Replacement
of Two Boiler Sections Boiler One
Morse Street School Replacement
of Two Boiler Sections Boiler One
(September, 2017)
■ This repair was an addition to the boiler changeover to natural gas.
■ Leaks were discovered during testing and firing in early September.
■ Finance Committee approved funding on
9-27-17 for these repairs using “Major Maintenance and School Contracted Transportation Savings.”
Durham Heat Pump Repairs Over eleven repairs being completed
Every heat pump has at least one repair needed
Finance Committee approved funding on 9-27-17 for these repairs using “Major Maintenance and School Contracted Transportation Savings.”
Efficiency Maine Incentives $20,601
■ Mast Landing burner upgrade done at boiler replacement cost $5,638
• Rebate from Efficiency Maine $3,828 for a completed project cost of $1,809
■ Morse Street burner upgrade to include duel fuel cost $21,206
• Rebate from Efficiency Maine $10,086 for a completed cost of $11,119
■ Freeport Middle School burner upgrade cost of project $7,338
• Rebate from Efficiency Maine $6,687 for a total project cost of $650
Middle School Roof Over Locker Rooms and Office
Middle School Roof Over Locker Rooms and Office
■ Old roof past life span at 32 years
■ Old roof leaked often requiring many repairs throughout the year
Mast Landing School Windows
Mast Landing School Windows
■ Solid vinyl double glazed windows for energy efficiency
■ Improvements to the building envelope
■ Old windows were worn out and past the recommended life span
Van Added To Fleet
(September, 2017)
■ Van added to fleet
• Service students with special needs
■ Finance committee approved funding on 9-27-17
• Savings from student contracted services account
Van Added To Fleet
MORSE STREET: DOORS AND LOCKS
■ Replaced due to safety concerns
• Code Red
■ Many doors worn out
• Hardware did not operate properly
MORSE STREET DOORS AND LOCKS
Morse Street School Playground
2018-2019 Anticipated Capital Budget
2018-2019 (FY 19)
Item 1
Bus (2) 77 Passenger (funded through retired bus debt) $0
Item 2
Pownal School Doors and Locks Upgraded $40,000
Item 3
Morse Street School Bathroom Renovation (floors only) $5,000
Item 4
Middle School Phone Upgrade $15,000
Item 5 $180,000
Durham Heat Pump Replacement (3)
Item 6
High School Roof Replacement 300 Wing $95,000
Item 7 $50,000
High School Phone System
Item 8
Morse Street P/A System Upgrade $15,000
Item 9
Capital Reserves $0$400,000
Pownal Doors and Locks
Upgrade
■ Replaced due to safety concerns
• Code Red
■ Many doors worn out
• Hardware did not operate properly
Pownal Doors and Locks
Upgrade
Morse Street School Bathroom Floors
Middle School Phone Upgrade
■ System is at the end of life cycle
■ Lines are unclear
■ Phone company and phone vendor have made repairs many times
Durham Heat Pumps
Durham Heat Pumps
High School 300 Wing Roof Over
Library
High School 300 Wing Roof Over
Library
■ Many calls to repair leaks throughout the year
■ Roof is a at the end of it’s life cycle 37 years (1980)
High School Phone Upgrade
■ Intercom unable to be heard by students in halls
■ School growth limits phone effectiveness
■ Safety concern: Code Red
High School Phone Upgrade
Morse Street P/A Upgrade
2019-2020 (FY 20)
Item 1 Bus (1) 84 Passenger (funded through retired bus debt) $0
$180,000
Item 2 Durham Heat Pump Replacement (3)
$35,000
Item 3 Mast Landing Elevator Upgrade
Item 4 Morse Street Renovation Bathrooms $15,000
$20,000
Item 5 Pownal Main Office and Nurses Office Remodel
Item 6 High School Convert Boiler 1 to Gas $64,000
Item 7 High School Shades $40,000
Item 8 Pownal Cooler, Freezer and Hot Plates (2) $26,000
$20,000
Item 9 Capital Reserves$400,000
2020-2021 (FY21) Item 1 Bus (2) 77 Passenger (funded through retired bus debt) $0
Item 2
Morse Street Elevator Upgrade $40,000
Item 3
Durham Heat Pump Replacement (3) $180,000
Item 4
Pownal Heating Control Upgrade $24,000
Item 5
Pownal Flooring in Room 5 (Asbestos ) $20,000
Item 6
Pownal Windows $130,000
Item 7
Capital Reserves $6,000$400,000
2021-2022 (FY22) Item 1 Bus (2) 77 Passenger (funded through retired debt $0 Item 2 Maintenance Truck (or Van) $25,000 Item 3 High School Elevator Upgrade $40,000 Item 4 Central Office Windows Business Office $8,000 Item 5 Morse St Fire Alarm Upgrade $15,000 Item 6 Durham Heat Pump Replacement $60,000 Item 7 Durham Parking Lot Lighting to LED $25,000 Item 8 Central Office Carpet Business Office $18,000 Item 9 Pownal Restroom Remodel $20,000 Item 10 High School Paving Teachers Parking $80,000 Item 11 Pownal Boiler $45,000 Item 12 Capital Reserves $64,000
$400,000
2022-2023 (FY 23)
Item 1 Bus (1) 84 Passenger (funded through retired bus debt) $0 Item 2 Durham Parking Lot Repairs $20,000 Item 3 Pownal Steamer $7,000 Item 4 High School Auditorium Carpet $15,000 Item 5 Mast Landing Steam Kettle $30,000 Item 6 Middle School Windows Rear of School $45,000 Item 7 Mast Landing Phone System $20,000 Item 8 Middle School Nurses Office Expansion $50,000 Item 9 Middle School Replace Siding on Additions $50,000 Item 10 Middle School and Mast Landing Key Card Entry $130,000 Item 11 Pownal Security Upgrade $10,000 Item 12 High School Reside Portable Building $10,000 Item 13 Capital Reserves $13,000
$400,000
Thank You for Supporting Our Facilities in RSU5!