RSU 5 Capital Budget Presentation

2016-2017 FY 17

                                COMPLETED
2016-2017 (FY 17)            2016-2017

     Item 1   Bus (1) 84 Passenger (funded through retired bus debt)        $0
     Item 2   Vans (2) Replacement                                      $70,000
     Item 3   Pownal Clock System                                       $10,000
     Item 4   Pownal Finish Pavement                                    $80,000
     Item 5   Mast Landing Finish Pavement                              $39,000
     Item 6   Pownal Cubbies                                            $12,000
     Item 7   Pick Up Truck With Plow                                   $38,000
     Item 8   Morse Street Security Alarm Upgrade                       $15,000
     Item 9   Central Office Siding                                     $16,000
Item 10       Central Office Roof Main Building                         $26,000
 Item 11      Morse Street Floor D Wing                                 $25,000
Item 12       Pownal Warning Lights                                     $15,000
Item 13       Capital Reserves                                              $0

$346,000

Pownal Clock System

Van Replacement (2)

Van Replacement

Pownal Finish Pavement

Mast Landing Finish Pavement

Pownal Cubbies

Pick Up Truck With Plow

Morse Street School Security Alarm Upgrade

Central Office Siding, Windows and Roof

Morse Street School Lobby Floor (D Wing)

Pownal Warning Lights

2017-2018 FY 18

2017-2018

Bus (2) 84 Passenger (funded through retired bus debt )        $0

Middle Roof Over Office and Locker Rooms                   $40,000

Mast Landing Windows                                      $130,000

Mast Landing Boilers (2)                                   $60,000

Morse Street Convert Boiler 2 to gas                       $22,000

Morse Street Doors and Locks                              $110,000

Morse Street Playground Repairs                            $10,000

Mast Landing Clocks                                        $10,000

Capital Reserves                                           $18,000

$400,000

School Buses (2)

School Buses n To replace buses 24 and 25 n Both buses hold 84 passengers

n Largest buses in fleet n Bus 24 has 185,000 miles n Bus 25 has 160,000 miles n Both buses have corrosion issues n State recommends 10 year replacement schedule n Originally installed in 1985 n Over 15 service calls for leaks n At the end of life cycle

Freeport Middle School Roof over

Office and Locker Rooms

Freeport Middle School Roof over

Office and Locker Rooms

Mast Landing School Windows

Mast Landing Windows n Installed in 1990 n Windows built with wood/vinyl and aluminum n Many windows no longer open n Many screens are missing n Burnham Cast Iron Sectional Boilers n 26 years old n Sections leak at seals n Sections have been sealed several times n Sections for this boiler no longer made (have been improved) n Burner in excellent condition n Boiler 1 Uses Natural Gas Only n Boiler 2 Uses Heating Oil Only n Change to Boiler 2 will still allow for dual fuel operation n Autoflame burner at 90% efficient n We do not have heating oil in the Morse Street School tank

Mast Landing Boilers

Mast Landing Boilers

Morse Street School

Convert Boiler 2 to Natural Gas

Morse Street School

Convert Boiler 2 to Natural Gas

Morse Street School

Convert Boiler 2 to Natural Gas

Morse Street School Doors and

Locks for Safety

Morse Street School Doors and

Locks for Safety

n Recent Code Red Lockdown identified these door locks as an issue n Large windows limit hiding area for

students n Doors are too old to allow for locks only change

Mast Landing Clocks

2018-2019 FY 19

2018-2019 (FY 19)            2018-2019

Item 1   Bus (2) 77 Passenger (funded through retired bus debt)        $0

Item 2   Durham Parking Lot Repairs                                $20,000

Item 3   High School Convert Boiler 1 to gas                       $65,000

Item 4   Pownal Playground Repairs                                 $10,000

                                                                  $160,000
Item 5   Durham Heat Pump Replacement (3)

Item 6   High School Roof Replacement 300 wing                     $90,000

Item 7   Mast Landing Steam Kettle                                 $30,000

Item 8 Capital Reserves $25,000

$400,000

2019-2020 FY 20

2019-2020 (FY 20 )        2019-2020

Item 1   Bus (1) 84 Passenger (funded through retired bus debt)        $0

Item 2   Durham Heat Pump Replacement (3)                         $160,000

Item 3   Pownal Main Office and Nurses Office Remodel              $25,000

Item 4   High School Auditorium Carpet                             $15,000

Item 5   Mast Landing Phone System                                 $20,000

Item 6   High School Paving Teachers Parking                       $80,000

Item 7   Morse Street Parking Lot Lighting To LED                  $13,000

Item 8   Morse Street Elevator Upgrade                             $40,000

Item 9   High School Elevator Upgrade                              $40,000

Item 10 Capital Reserves $7,000

$400,000

2020-2021 FY 21

2020-2021 (FY 21)            2020-2021

Item 1   Bus (2) 77 Passenger (funded through retired bus debt)        $0

                                                                   $20,000
Item 2   High School Phone System Upgrade

                                                                   $40,000
Item 3   Mast Landing Elevator Upgrade

                                                                  $160,000
Item 4   Durham Heat pump replacement (3)

                                                                   $10,000
Item 5   Pownal Security Upgrade

                                                                   $20,000
Item 6   Pownal Flooring in Room 5 (Asbestos )

Item 7   Pownal Windows                                           $130,000

Item 8 Capital Reserves $20,000

$400,000

2021-2012 FY 22

2021-2022 (FY 22)
                    2021-2022
           Item 1   Bus (2) 77 Passenger (funded through retired debt        $0
           Item 2   Maintenance Truck (or Van)                           $25,000
           Item 3   Pownal Snow Blower                                    $5,000
           Item 4   Morse Street Fire Alarm Upgrade                      $15,000
           Item 5   Durham Heat Pump Replacement                         $60,000
           Item 6   Middle School Field Irrigation                       $30,000
           Item 7   Durham School Field Irrigation                       $30,000
           Item 8   High School Cabinets Science Room                    $20,000
           Item 9   Central Office Carpet Business Office                 $8,000
          Item 10   Morse Street Rest Rooms repairs                      $15,000
          Item 11   Pownal Restroom Repairs                              $20,000
          Item 12   Central Office Carpet (upstairs)                     $10,000
          Item 13   Durham Parking Lot Lighting To LED                   $25,000
          Item 14   Durham Snow Blower                                    $5,000
          Item 15   High School Bathrooms 300 wing                       $50,000
          Item 16   Pownal Boiler                                        $35,000

Item 17 Capital Reserves $47,000

$400,000