Freeport High School 2011 Capital Budget Gym Roof Completed Projects Gym Floor

Gym Roof & Skylights        Gym Floor

1

     Fields and Grounds            Kitchen Equipment
Pick up Truck with Dump Body

Pownal Elementary School Reach in Refrigerator

Freeport High School Warming Oven

Freeport Middle School Dish Washer Disposal

Pownal Reach in Refrigerator   Middle School Dish Washer

2

Morse Street Office Upgrade              RSU No. 5 recycled Materials

Natural Gas for Heating Natural Gas for Heating

 Natural Gas is the primary source of energy used to heat Pownal Elementary, Freeport High School and Morse Street School  Cost of natural gas per Therm $1.00

 Fuel Oil equivalent per Gallon $ 1.39

 Beginning in late October or early  Propane equivalent per Gallon $.91

November it will also be the Primary source of heating energy for Mast Landing School

3

Natural Gas for Heating

Natural Gas for Heating

                                                                       Actual costs
   Therms of Natural Gas      Therms of Natural Gas      Therms of Natural        Therms of natural gas
    anticipated                 actual usage                Gas anticipated           used 2010-2011
      2010-2011                    2010-2011                costs 2010-2011

 Pownal 14,039              Pownal 9,756              Pownal      $12,055        Pownal       $8,380
  Morse Street school         Morse Street School       Morse St    $16,393
                           
                                                                                   Morse St    $13,536
  19,084                      15,759
                                                        High School $27,067        High School $23,704
 Freeport High School       Freeport High School

  31,510                      27,594
 Total Therms 55,515        Actual Therms 48,043
                                                        Total $55,150                    Total $45,620

                                                                Natural Gas
  Natural Gas for Heating
                                                             Mast Landing School
     Cost Avoidance
December 2010 to June 2011                            2010-2011 Heating         2011-2012 Therms
                                                        Oil usage 11,998           of Natural Gas
                                                             gallons                 Anticipated
      High School $51,570
     Pownal School $18,288                           Cost of heating oil        16,677 Therms
    Morse St. School $29,543                             2011-2012             @ 1.00 per Therm
      Total Cost Avoidance
                                                           $45,592                   $16,677
            $99,401
                                                                                ($1.00 per Therm)

4

Natural Gas for Heating

Natural Gas Mast Landing School Conversion Costs

 Projected Savings Converting to Mast Landing School Natural Gas

 Install Dual fuel burners, Gas piping, $28,915 natural gas fired water heater and retrofit kitchen equipment

$50,369.00

Natural Gas For Heating        Morse Street Electrical Savings
          Payback                         Gas Fired Water Heater

                                               Electrical usage 2009/2010
Pownal Payback      3.24 years                            $41,598
Morse St. Payback   1.94 years                 Electrical usage 2010/2011
High School Payback 2.92 years                            $29,923

                                                      Total savings
Mast Landing Payback 1.74 years                         $11,675

5

Pownal School Radon Remediation           Pownal School Radon Remediation

 Pownal School Water System Tested At 13,200 pCi/L for Radon

 The Maine Maximum Exposure Limit is set at 4000 pCi/L

 RSU No. 5 Received a Grant From

The Maine Center for Disease Control in the Amount of $17,300 to Install a Radon Water Treatment System

2012-2013 Anticipated Capital Budget*

2012-2013 Anticipated                    Two buses 78 passenger               $0
                                          Morse Bus Road re-surface       $25,000
   Capital Budget*
                                      
                                         Mast Landing Carpet             $88,000
                                         Pownal Carpet                   $22,000
                                         Kitchen Equipment               $39,605
                                         Middle School Boiler           $180,000
                                         Morse St Tile (lobby)           $11,000
*Taken from RSU No. 5 Capital Plan       Morse St Clock System           $10,000
                                          Capital Reserves                $24,395
      adopted January 2010            
                                                    total                $400,000
         revised 10-12-2011

6

                                                            2012-2013 Anticipated Capital
2012-2013 Anticipated Capital Budget*                        Budget Bus Replacement (2)

 Proposed new capital          $400,000
 Existing capital debt service $409,649
 Existing bus payments          $54,092
 Total capital debt service    $863,741
   Proposed budget increase                  $40,717

2011-2012 Anticipated Capital 2012-2013 Anticipated Capital Budget Bus Replacement Budget Bus Replacement Two 78 Passenger School Buses Current Fleet:

 1993 International

  1997 International 1998 International

 Replace two 1997 International 

 2000 Blue Bird 2000 International 78 passenger buses 2001 International

 Both buses 14 years old 

 2001 International

 2003 Thomas

 Both buses have over 175,000 miles

 2005 Thomas

 2005 Thomas

 2006 Thomas

 2008 Thomas

 2011 International

 2011 International

 2012 International

 2012 International

7

Resurface Morse Street Bus Road   Mast Landing Carpet

Pownal Carpet             Kitchen Equipment

8

Middle School Boiler Plant                                  Middle School Boiler Plant

This project will replace ten Hydrotherm Boilers at the end of their life cycle

Installed will be Two Buderus Boilers a high quality boiler with a 90% efficiency rating

These replacement Boilers will operate with Dual Fuel Capability

          Middle School Boiler Plant
              Fuel Usage Facts                                 Morse Street Tile Re-Placement
   Annual Oil Usage 19,000        Projected Natural Gas In
    Gallons                         Therms
   500 gallons Propane            26,868 Therms of Energy
                                    to Replace Heating Oil
       Projected Energy Cost           Cost per Therm

 2012-2013                  $1.05 (estimated)
  $73,475                       $28,211

Projected Savings $45,264

Payback 3.95 years

9

Morse Street Clock System                   Anticipated Capital 2013-2014

 78 Passenger Bus                  $27,500
 Pick-up Truck                     $30,000
 Middle Pave Access Road           $75,000
 Morse St Carpet D-Wing            $25,000
 Athletic Fields Up-Grade         $200,000
 High School Bathrooms             $39,500
 Capital Reserve Account            $3,000
 Total                            $400,000

Anticipated Capital 2013-2014                 Anticipated Capital 2014-2015

                                               78 passenger bus                         $0
 Proposed new capital            $400,000   

                                              Pownal Main Hall Carpet             $25,000
 Existing capital debt service   $394,483    Field tractor                       $33,000
 Existing bus payments           $108,184    High School roof repairs           $250,000
 Total capital debt service      $902,667    Central Office Carpet Upstairs      $10,000
                                              Kitchen High School steam table     $16,000
                                              Mast Landing Parking Lot resurface  $50,000
   Proposed budget increase       $38,926    Capital reserve account             $16,000
                                              Total                              $400,000

10

    Anticipated Capital 2014-2015                      Anticipated Capital 2015-2016
                                                    One 78 passenger bus                         $0
                                                    High School Security System Upgrade     $15,000
 Proposed new capital            $400,000          Middle School Roof Repairs (gym)        $50,000
                                                    Morse St Roof Repairs (gym)             $50,000
 Existing capital debt service   $383,220
                                                    Middle School Elevator Upgrade          $35,000
 Existing bus payments            $81,592
                                                    High School Elevator Upgrade            $35,000
 Total capital debt service      $864,812          High School Fire Alarm Upgrade          $15,000
                                                    Mast Landing Security alarm Upgrade     $15,000
   Proposed budget Decrease       -$37,855
                                                                                           continued

Anticipated Capital 2015-2016 Anticipated Capital 2015-2016 Continued

  Middle & Mast Landing Lighting Upgrade $10,000
                                                     Proposed new capital            $400,000

                                                   
 Pownal Paving                          $50,000
 High School Air Handler                $50,000
                                                    Existing capital debt service   $371,789
 High School Carpet Classrooms          $15,000    Existing bus payments            $55,000
 Kitchen Equipment mast Dishwasher      $15,000    Total capital debt service      $826,789
 Mast Landing Fire Protection           $15,000
 Capital Reserves                       $20,000
                                                      Proposed budget increase      -$38,023
 Total                                 $400,000

11

                                                         Anticipated Capital 2016-2017
    Anticipated Capital 2016-2017
                                                                   Continued
 One 78 passenger bus                         $0
 Vans (2) Replacement                    $60,000
 Parking Lot Sander                      $ 8,000     Pownal Well & Tanks                      $35,000
 Pownal Septic Tank                      $25,000     Central Office Carpet Business Office     $8,000
 Middle School Fire Alarm Upgrade        $15,000     Morse St. Carpet A & B Wings             $30,000
 Morse St. Carpet C Wing                 $20,000     Capital Reserves                        $142,000
 Middle School Security Alarm Upgrade     $15,000    Total                                   $400,000
 Morse St. Security Alarm Upgrade         $15,000

Continued

Anticipated Capital 2016-2017

 Proposed new capital             $400,000
 Existing capital debt service    $360,133
 Existing bus payments            $55,000
 Total capital debt service       $815,133

   Proposed budget increase       -$11,656

12