Capital - Energy Efficiencies Power Point Presentation.pdf
Budgets · FY 2012-2013 · 12 pages · 1,163 words · all RSU 5 documents · the district's file →
Freeport High School 2011 Capital Budget Gym Roof Completed Projects Gym Floor
Gym Roof & Skylights Gym Floor
1
Fields and Grounds Kitchen Equipment Pick up Truck with Dump Body
Pownal Elementary School Reach in Refrigerator
Freeport High School Warming Oven
Freeport Middle School Dish Washer Disposal
Pownal Reach in Refrigerator Middle School Dish Washer
2
Morse Street Office Upgrade RSU No. 5 recycled Materials
Natural Gas for Heating Natural Gas for Heating
Natural Gas is the primary source of energy used to heat Pownal Elementary, Freeport High School and Morse Street School Cost of natural gas per Therm $1.00
Fuel Oil equivalent per Gallon $ 1.39
Beginning in late October or early Propane equivalent per Gallon $.91
November it will also be the Primary source of heating energy for Mast Landing School
3
Natural Gas for Heating
Natural Gas for Heating
Actual costs
Therms of Natural Gas Therms of Natural Gas Therms of Natural Therms of natural gas
anticipated actual usage Gas anticipated used 2010-2011
2010-2011 2010-2011 costs 2010-2011
Pownal 14,039 Pownal 9,756 Pownal $12,055 Pownal $8,380
Morse Street school Morse Street School Morse St $16,393
Morse St $13,536
19,084 15,759
High School $27,067 High School $23,704
Freeport High School Freeport High School
31,510 27,594
Total Therms 55,515 Actual Therms 48,043
Total $55,150 Total $45,620
Natural Gas
Natural Gas for Heating
Mast Landing School
Cost Avoidance
December 2010 to June 2011 2010-2011 Heating 2011-2012 Therms
Oil usage 11,998 of Natural Gas
gallons Anticipated
High School $51,570
Pownal School $18,288 Cost of heating oil 16,677 Therms
Morse St. School $29,543 2011-2012 @ 1.00 per Therm
Total Cost Avoidance
$45,592 $16,677
$99,401
($1.00 per Therm)4
Natural Gas for Heating
Natural Gas Mast Landing School Conversion Costs
Projected Savings Converting to Mast Landing School Natural Gas
Install Dual fuel burners, Gas piping, $28,915 natural gas fired water heater and retrofit kitchen equipment
$50,369.00
Natural Gas For Heating Morse Street Electrical Savings
Payback Gas Fired Water Heater
Electrical usage 2009/2010
Pownal Payback 3.24 years $41,598
Morse St. Payback 1.94 years Electrical usage 2010/2011
High School Payback 2.92 years $29,923
Total savings
Mast Landing Payback 1.74 years $11,6755
Pownal School Radon Remediation Pownal School Radon Remediation
Pownal School Water System Tested At 13,200 pCi/L for Radon
The Maine Maximum Exposure Limit is set at 4000 pCi/L
RSU No. 5 Received a Grant From
The Maine Center for Disease Control in the Amount of $17,300 to Install a Radon Water Treatment System
2012-2013 Anticipated Capital Budget*
2012-2013 Anticipated Two buses 78 passenger $0
Morse Bus Road re-surface $25,000
Capital Budget*
Mast Landing Carpet $88,000
Pownal Carpet $22,000
Kitchen Equipment $39,605
Middle School Boiler $180,000
Morse St Tile (lobby) $11,000
*Taken from RSU No. 5 Capital Plan Morse St Clock System $10,000
Capital Reserves $24,395
adopted January 2010
total $400,000
revised 10-12-20116
2012-2013 Anticipated Capital 2012-2013 Anticipated Capital Budget* Budget Bus Replacement (2) Proposed new capital $400,000 Existing capital debt service $409,649 Existing bus payments $54,092 Total capital debt service $863,741 Proposed budget increase $40,717
2011-2012 Anticipated Capital 2012-2013 Anticipated Capital Budget Bus Replacement Budget Bus Replacement Two 78 Passenger School Buses Current Fleet:
1993 International
1997 International 1998 International
Replace two 1997 International
2000 Blue Bird 2000 International 78 passenger buses 2001 International
Both buses 14 years old
2001 International
2003 Thomas
Both buses have over 175,000 miles
2005 Thomas
2005 Thomas
2006 Thomas
2008 Thomas
2011 International
2011 International
2012 International
2012 International
7
Resurface Morse Street Bus Road Mast Landing Carpet Pownal Carpet Kitchen Equipment
8
Middle School Boiler Plant Middle School Boiler Plant
This project will replace ten Hydrotherm Boilers at the end of their life cycle
Installed will be Two Buderus Boilers a high quality boiler with a 90% efficiency rating
These replacement Boilers will operate with Dual Fuel Capability
Middle School Boiler Plant
Fuel Usage Facts Morse Street Tile Re-Placement
Annual Oil Usage 19,000 Projected Natural Gas In
Gallons Therms
500 gallons Propane 26,868 Therms of Energy
to Replace Heating Oil
Projected Energy Cost Cost per Therm
2012-2013 $1.05 (estimated)
$73,475 $28,211Projected Savings $45,264
Payback 3.95 years
9
Morse Street Clock System Anticipated Capital 2013-2014
78 Passenger Bus $27,500
Pick-up Truck $30,000
Middle Pave Access Road $75,000
Morse St Carpet D-Wing $25,000
Athletic Fields Up-Grade $200,000
High School Bathrooms $39,500
Capital Reserve Account $3,000
Total $400,000
Anticipated Capital 2013-2014 Anticipated Capital 2014-2015
78 passenger bus $0
Proposed new capital $400,000
Pownal Main Hall Carpet $25,000
Existing capital debt service $394,483 Field tractor $33,000
Existing bus payments $108,184 High School roof repairs $250,000
Total capital debt service $902,667 Central Office Carpet Upstairs $10,000
Kitchen High School steam table $16,000
Mast Landing Parking Lot resurface $50,000
Proposed budget increase $38,926 Capital reserve account $16,000
Total $400,00010
Anticipated Capital 2014-2015 Anticipated Capital 2015-2016
One 78 passenger bus $0
High School Security System Upgrade $15,000
Proposed new capital $400,000 Middle School Roof Repairs (gym) $50,000
Morse St Roof Repairs (gym) $50,000
Existing capital debt service $383,220
Middle School Elevator Upgrade $35,000
Existing bus payments $81,592
High School Elevator Upgrade $35,000
Total capital debt service $864,812 High School Fire Alarm Upgrade $15,000
Mast Landing Security alarm Upgrade $15,000
Proposed budget Decrease -$37,855
continuedAnticipated Capital 2015-2016 Anticipated Capital 2015-2016 Continued
Middle & Mast Landing Lighting Upgrade $10,000
Proposed new capital $400,000
Pownal Paving $50,000
High School Air Handler $50,000
Existing capital debt service $371,789
High School Carpet Classrooms $15,000 Existing bus payments $55,000
Kitchen Equipment mast Dishwasher $15,000 Total capital debt service $826,789
Mast Landing Fire Protection $15,000
Capital Reserves $20,000
Proposed budget increase -$38,023
Total $400,00011
Anticipated Capital 2016-2017
Anticipated Capital 2016-2017
Continued
One 78 passenger bus $0
Vans (2) Replacement $60,000
Parking Lot Sander $ 8,000 Pownal Well & Tanks $35,000
Pownal Septic Tank $25,000 Central Office Carpet Business Office $8,000
Middle School Fire Alarm Upgrade $15,000 Morse St. Carpet A & B Wings $30,000
Morse St. Carpet C Wing $20,000 Capital Reserves $142,000
Middle School Security Alarm Upgrade $15,000 Total $400,000
Morse St. Security Alarm Upgrade $15,000Continued
Anticipated Capital 2016-2017
Proposed new capital $400,000 Existing capital debt service $360,133 Existing bus payments $55,000 Total capital debt service $815,133 Proposed budget increase -$11,656
12
Source: , linked from www.rsu5.org/budget/budget-2012-2013. Text copied out by software (pdftotext); no wording corrected.