Capital-Facility Plan.pdf
Monthly financial reports · Finance Committee · 5 pages · 4,304 words · all RSU 5 documents · the district's file →
RSU No. 5 Durham - Freeport - Pownal
Capital / Facility Plan
Presented to the Board of Directors on January 13, 2010
Pages 1-2 Proposed Capital
Pages 3-5 Item Descriptions
Pages 6-16 20 Year Life Cycle Analysis
Pages 22-27 Current Debt Maturity Schedule
RSU No. 5 - Capital Plan
2011-2015 Proposed Existing Capital Existing Total Capital Proposed
New Capital Debt Service Bus Payments Debt Service Budget
(Excluding State Increase
Participating)
2009-2010
2009-2010 (FY10) $ 530,542 $ 51,735 $ 582,277
2010-2011 (FY11)
Item 1 Bus - 78 Passenger* (1 Bus - Year 1 of 3 payments /
balance funded from retired bus debt) $ 26,000
Item 2 Morse Street - Water Heater $ 30,000
Item 3 Pownal Improvements - Facia Boards - Vestibule - Lighting $ 20,500
Item 4 Pownal Roof $ 38,000
Total $ 114,500 $ 518,313 $ 51,735 $ 684,548 $ 102,271
2011-2012 (FY12)
Item 1 Bus - 78 Passenger *(2 Buses - Year 1 payment / balance
funded from retired bus debt) $ 52,000
Item 2 Pick-Up Truck with Dump $ 30,000
Item 3 High School - Roof Repair - Gym $ 50,000
Item 4 High School - Gym Floor Replacement $ 100,000
Item 5 Kitchen Equipment - Dishwashers/Disposal - Morse St $ 15,800
Item 6 Pownal - Reach in Refrigerator $ 20,000
Total $ 267,800 $ 431,413 $ 78,000 $ 777,213 $ 92,665
2012-2013 (FY13)
Item 1 Bus - 78 Passenger *(2 Buses - Funded from retired bus debt)$ 0
Item 2 Middle School - Resurface Access Road $ 75,000
Item 3 Mast Landing - Resurface Parking Lot $ 50,000
Item 4 Morse Street - Resurface Bus Road $ 25,000
Item 5 Mast Landing - Carpet Replacement $ 100,000
Item 6 Kitchen Equipment - HS / Mast Landing Dishwasher / disposal $ 29,605
Item 7 Kitchen Equipment - Morse St Steamer $ 15,000
Item 8 Pownal - Carpet Replacement $ 22,000
Item 9 Central Office - Carpet Replacement $ 10,000
Item 10 Capital Reserve Account $ 73,395
Total $ 400,000 $ 415,395 $ 130,000 $ 945,395 $ 168,182
2013-2014 (FY14)
Item 1 Bus - 78 Passenger* (1 Bus - Funded from retired bus debt) $ 0
Item 2 Pick-Up Truck $ 30,000
Item 3 Athletic Field Upgrade $ 100,000
Item 4 Athletic Field Lights $ 100,000
Item 5 Morse Street - Roof Repairs - D Wing / Gym $ 50,000
Item 6 Morse Street - Flooring Replacement -D Wing $ 24,000
Item 7 Middle School- Roof Repairs - Gym $ 50,000
Item 8 Capital Reserve Account $ 46,000
Total $ 400,000 $ 400,183 $ 130,000 $ 930,183 $ (15,212)
2014-2015 (FY15)
Item 1 Bus - 78 Passenger* (1 Bus - Funded from retired bus debt) $ 0
Item 2 Van (2) Replacement $ 60,000
Item 3 Field Maintenance Equipment - Tractor $ 33,000
Item 4 High School - Roof Repair / AP / 100 Wing / 200 Wing $ 250,000
Item 5 High School - Security System $ 15,000
Item 6 Kitchen Equipment - High School Steam table/ disposal $ 16,000
Item 7 Capital Reserve Account $ 26,000
Total $ 400,000 $ 388,858 $ 130,000 $ 918,858 $ (11,325)* Subject to change based on Transportation Analysis (lease/purchase cost)
The Target of the 5 Year Debt Service Plan are for planned expenditures of up to $400,000 per year with a portion designated to reserve funds.
Capital Budget Request 2010-2011
Item 1 Bus 77 Passenger
Proposal: Replacement of a 1993 International School Bus. This bus is seventeen years old and well above the ten year 150,000 mile replacement schedule recommended by the State Department of Education.
Justification: We propose to purchase a 77 passenger to replace bus 21 and move this bus to the spare list. As part of the management of our fleet bus 35 will be removed from service and sold due to the year and condition of this bus.
Expected Benefits: Improvements to the fleet for this route bus and removal of an older unit increasing dependability for sports trips, which travel further distances
Consequences if not approved: Continued use of older equipment and higher repair cost
Budget: Cost associated to purchase $26,000.00 (1st payment of 3 year lease purchase)
Current fleet Bus 20- 2000 Blue Bird Bus 21- 2001 International Bus 22- 2001 international Bus 23- 2003 Freightliner Bus 24- 2004 Thomas Bus 25- 2005 Thomas Bus 26- 2006 Thomas Bus 27- 2009 International Bus 28- 2010 International Bus 29- 2010 International (Durham) Bus 5 - 2000 international (Pownal) Bus 35- 1993 International Bus 37- 1996 International Bus 38- 1998 International
Item 2 Morse Street Water Heater
Proposal: Replacement of an electric water heater at Morse Street School that provides hot water to the D-wing and kitchen area with a gas fired boiler. The current unit is in need of extensive repairs including replacement of several heater elements and the contro
Justification: With the unit control bypassed the unit will heat the water continuously without the benefit of a schedule for setback. This increases energy demands raising the cost of electricity at this school. The current unit is 27 years old and we are no longer abl
Expected Benefits: Replacing this unit will decrease electrical energy costs at this school. A new unit will be equipped with an energy management system to allow us to shut down when hot water is not needed.
Consequences if not approved: Continued high energy use throughout the school year
Budget: Cost associated with this project $30,000
Item 3 Pownal building improvements: Vestibule enclosure, Metal coverage on trim / Lighting Upgrade
Proposal: Enclose of the front entrance vestibule. Cover weathered trim at the roofline overhang with aluminum and vinyl.
Justification: The main entry to this building is one door directly to the outside which when opened allows cold air to rush into the building. by enclosing the vestibule the inrush of cold winter air will be reduced allowing for decreased energy costs. The trim around
Expected Benefits: Enclosing the vestibule will save heating energy in the cold winter months. Covering the trim will prevent replacement of this wood trim and improve the appearance of the school. Lighting will be more efficient and save energy.
Consequences if not approved: Vestibule: cold air continuing to rush into the school during the winter months whenever the main entry door is opened. Trim: the current wood trim is weathered badly, in a few years this wood will need to be replaced in most areas on the overhang.
Budget: Metal trim coverage: $13,000 Vestibule enclosure $5,000 Lighting replacement $2,500
Item 4 Pownal Roof: Front section
Proposal: Replace shingles on the front section to the classroom area.
Justification:
The roof on the front section of the classroom area was last replaced in 1985. The back section of this area was replaced in 2005. Over this past winter we have experienced several roof leaks from this front roof section. Upon inspection this roof is in n
Expected Benefits: A new roof should give us 25 years of leak free service.
Consequences if not approved: Continued leaking when ice and snow form on roof
Budget: Roof / Shingle Replacement: $38,000
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Transportation
Bus 36 International 78 passenger 1993 16 2009 80,000 80,000
Bus 35 International 78 passenger 1993 16 2009 80,000 80,000
Bus 37 International 78 passenger 1997 15 2012 80,000 85,000
Bus 38 international 78 passenger 1998 12 2011 80,000 90,000
Bus 5 Thomas 1999 12 2012 80,000
Bus 20 bluebird 78 passenger 2000 12 2013 80,000 90,000
Bus 21 International 78 passenger 2001 14 2015 80,000 90,000
Bus 22 international 78 passenger 2001 12 2014 80,000 90,000
Bus 23 Freightliner 78 passenger 2003 12 2016 80,000 95,000
Bus 24 Thomas 84 passenger 2004 12 2017 80,000
Bus 25 Thomas 84 passenger 2005 12 2018 80,000
Bus 26 Thomas 72 passenger 2006 12 2019 80,000
Bus 27 International 77 passenger 2008 12 2020 80,000
Bus 28 International 77 passenger 2009 12 2021
Bus 29 International 77 passenger 2009 12 2021 80,000
Van 1 2004 ford 7 passenger 2004 10 2014 30,000 30,000
Van 2 2004 Ford 7 passenger 2004 10 2014 30,000 30,000
Truck 2009 ford f-150 2009 12 2021 20,000
Truck 1999 ford f 250 W/dump 1999 12 2011 30,000
Truck 2001 Ford f250 2001 12 2013 30,000
Sander 2005 12 2017 8,000
Fields and Grounds maintenance Equipment
Tractor John Deere 4400 1999 15 2014 25,000
Trailer flatbed 2001 20 2021 8,000
Mower # 1 John deere f-725 1994 15 2009 10,000
Mower # 2 john deere f-935 1999 15 2014 8,000
Mower #3 John deere f-935 2001 15 2016 10,000
Gator John Deere 2003 20 2023 10,000
pavement high school main parking note 1
pavement high school bus circle 2006 20 2026 30,000
pavement High school back lot not paved 20 0 note 1
pavement Middle access road 1988 20 2008 note 1 75,000
pavement Middle parkinglot 1987 20 2007 note 1
pavement middle back of school 2002 20 2022 note 1 30,000
pavement Mast parking 1990 22 2012 note 1 50,000
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
pavement Mast side walk upper 2004 20 2024 note 1 40,000
pavement Mast side walk lower 2005 20 2025 note 1 40,000
pavement Morse st bus road 1984 25 2009 note 1 25,000
pavement Morse Parking Lot 2008 25 2033 note 1
tennis courts 2001 15 2016 25,000
High School concept A - $700,000
Middle School concept A - $375,000
Buildings
Roof High School 100&200 wings 1989 25 2014 note 2 100,000
Roof High School AP room 1989 25 2014 note 2 50,000
Roof High School IA section 2004 25 2029
roof gym storage and weight room 2009 25 2034 note 9
Roof high School Science Wing 2003 25 2028 150,000
Roof High School Auditorium 2003 25 2028 200,000
Roof High School Gym 1985 25 2010 50,000
Roof Morse St Wing A 2006 27 2033
Roof Morse St wing C 2006 25 2031
Roof Morse St Wing D at lobby 2006 25 2031
Roof Morse St Wing D pitched 1983 30 2013 25,000
Roof Morse St Gym pitched 1983 30 2013 25,000
Roof Mast landing 1990 25 2024 2009 recon seams add 15 years 150,000
Roof Middle Library metal 2003 50 2053
Roof Middle 7th grade wing 2002 25 2027 200,000
Roof middle 8th grade wing 2002 25 2027 200,000
Roof Middle school Main building and Gym 2008 20 2028 100,000 150,000
Boiler 2 High School Burnham scotch marine 2008 46 2054
Boiler 1 High school Cleaver 1974 50 2024 150,000
Boiler 3 High School HB Smith 2003 30 2033
Furnace High School Science wing 2003 30 2033
Furnace High School IA wing trane rooftop 2005 30 2035
Unit Ventilators High School ( ) 2008 30 2038 note 3
Unit Ventilators Middle School ( ) 2002 30 2032
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Buldings cont'd
Boiler 1-10 Middle School 1989 30 2019 110,000
Boiler (water heater) Middle 1994 25 2019 20,000
Boiler 1 Mast Landing 1990 30 2020 50,000
Boiler 2 Mast Landing 1990 30 2020 50,000
Boiler 1 Morse St. 1997 30 2027 200,000
Boiler 2 Morse St 1997 30 2027 200,000
duct work Mast Landing library ^^ 1990 50 2040
electrical upgrade high school breakers and recticles 2009 50 2058
Water heater Morse kitchen 1982 20 2002 30,000
HV Air Handler unit 1 High School 1985 30 2015 50,000
Hv Air Handler unit 1 Middle 1989 30 2019 50,000
HV Air handler unit 2 Middle 1989 30 2019 50,000
HV Air Handler unit 3 Middle 1989 30 2019 50,000
HV Air Handler unit 4 Middle 2002 30 2032
Hv Air Handler unit 1 wing D morse 1983 30 2013 50,000
Hv Air Handler unit 1 Mast harriseeket 1990 30 2020 50,000
Hv Air handler unit 2 Mast soule 1990 30 2020 50,000
Hv Air handler unit 3 Mast spring hill 1990 30 2020 50,000
Hv air handler unit 4 mast gym 1990 30 2020 50,000
Hv air handler unit 5 mast café' 1990 30 2020 50,000
carpet High School 300 wing 2008 40 2048 to vct
carpet High school Main Hall class rms 2005 10 2015 15,000 20,000
carpet High School 200 wing cls rms 2003 15 2018 15,000
carpet High School Carpet auditorium 2003 15 2018 25,000
carpet Middle Library & Office 2002 15 2017 12,000
carpet Morse Wing A&B 2000 15 2015 30,000
carpet Morse Wing C 2002 15 2017 20,000
carpet Morse St. wing D 1998 15 2013 25,000 30,000
carpet Mast Landing 1999 15 2014 100,000 30,000
clocks high school 2009 15 2024 10,000
fire protection High School (alarms) 2003 12 2015 15,000 20,000
fire protection High School (sprinklers) 2003 50 2053
fire protection Middle ( alarms) 2005 12 2017 15,000
fire protection Middle (sprinklers) 2002 50 2052
fire protection mast (alarms) 2004 12 2016 15,000 30,000
fire protection mast (sprinklers) 1990 50 2040
fire protection Morse st (alarms) 2005 12 2017 15,000
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
fire protection Morse st (sprinklers) 1985 50 2035 note 4
security High school 2002 12 2014 15,000 20,000
security Middle 2005 12 2017 15,000
security Mast 2003 12 2015 15,000 20,000
security Morse 2005 12 2017 15,000
windows High 100 &200 wing 1983 45 2028 200,000
windows High 300 wing 1983 45 2028 100,000
windows high AP room 2008 30 2038
windows High auditorium & music 2003 30 2033
windows high IA section 1964 30 1994 note 5
windows High science wing 2003 30 2033
windows Middle 7th & 8th grade wings 2002 30 2032
windows Middle main building 2005 30 2035
windows Mast landing 1990 30 2020 50,000
windows Morse A&B wings 1983 45 2028 100,000
windows Morse C wing 1979 45 2024 40,000 50,000
windows Morse D wing 1983 45 2028
vct (tile flooring) high school 100 wing * hall 1974 50 2024 note 6
vct (tile flooring) high school 200 wing * hall 1974 50 2024 note 6
vct (tile flooring) high school auditorium lobby 2003 50 2053
vct (tile Flooring) music room high school 2003 50 2053
vct (tile flooring) 100 wing classrooms * 1980 50 2030 note 6
vct (tile flooring) science wing high school 2003 50 2053
vct tile flooring Middle main building * 1989 50 2039 note 6
vct tile flooring middle 7th &8th wings 2002 50 2052
vct tile flooring Morse st lobby & hall D wing * 1983 30 2013 10,000
vct tile flooring morse st Gym * 1983 50 2033
vct tile flooring Mast all classrms 1990 50 2040
vct tile 300 wing high school ** 1983 45 2007
hardwood floor high gym ^^^ 1983 30 2013 100,000 50,000
elevator High school 1985 30 2015 35,000
elevator Middle School 1989 30 2019 35,000
elevator Mast Landing 1991 30 2021 35,000
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Buidlings cont'd
elevator Morse Street 1985 30 2015 35,000
lighting parking lot high 2005 20 2025 15,000
lighting parking lot mast 2008 20 2028
lighting parking lot Middle 2008 20 2028
lighting parking lot morse 2008 25 2033
lighting outside building High school 2005 25 2030
lighting outside high school gym 2003 25 2028 25,000
lighting outside building high auditorium 2003 25 2028 25,000
lighting outside building Middle 1989 25 2014 5,000
lighting outside building Mast 1990 25 2015 5,000
lighting outside building Morse 1983 25 2008
siding Middle Main building vinyl 2006 30 2036
siding Gym and library middle 2003 30 2033
siding Middle 7th &8th wings 2002 30 2032
siding Morse Vinyl 2000 30 2030
siding High science Metal 2003 30 2033
siding High auditorium Metal 2003 30 2033
siding high soffett&facia main building high 2004 30 2034
furniture High School 1985 20 2005 note 7 5,000 5,000 5,000 5,000 5,000
furniture Middle School 1985 20 2005 note 7 5,000 5,000 5,000 5,000 5,000
furiture Mast Landing 1991 20 2011 note 7 5,000 5,000 5,000 5,000
furniture Morse Street 1985 20 2005 note 7 5,000 5,000 5,000 5,000
Kitchen equipment
steamer High school w/kettle 2005 30 2035
steamer Mast Landing w/kettle 1990 30 2020 15,000
Kettle tilting Middle 2001 30 2031
steamer Morse w/kettle cleveland 1982 30 2012 15,000
oven High two vulcan stacked 1995 40 2035 18,000
oven high combination 1995 40 2035 28,000
oven Middle three vulcan two stacked 2001 40 2041
oven Mast three Market forge 1991 40 2031
oven Morse two vulcan stacked 2003 40 2043
oven morse two blogett stacked 1982 40 2022 18,000
dishwasher High Hobart 1999 13 2012 14,000
dishwasher Middle champion 1986 25 2009 14,000
dishwasher Mast Hobart 1991 21 2012 14,000
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
dishwasher Morse Hobart 1982 29 2011 14,000
booster hot water Mast 2005 25 2030
booster hot water Middle Hatco 2006 20 2026 10,000
freezer High walk-in 1995 45 2040
freezer Mast walk-in 1991 45 2036
freezer Middle walk-in 2001 45 2046
freezer Morse walk-in 1982 45 2027 100,000
cooler high walk-in 1995 45 2040
cooler middle walk-in 2001 45 2046
cooler middle display federal 2001 30 2031
cooler mast walk-in Thermal-kool 1991 45 2036
cooler Morse walk-in 1982 45 2027 100,000
cooler high milk chest three units 1995 45 2040
cooler Mast Milk chest one unit 1991 45 2036
cooler Morse milk chest one unit 1982 45 2027 10,000
steam table High 1962 52 2014 15,000
steam table Middle 2001 50 2051
steam table Morse 1982 50 2032
steam table Mast 1991 50 2041
range (gas) with oven high school 1995 50 2045
range (gas) four burner Mast 1991 50 2041
range (gas) four burner Middle select 2001 50 2051
Ice Machine Mast Scotman 2002 30 2032
refrigerator two door High comercial 1995 35 2030
refrigerator one door High comercial 1995 35 2030
refrigerator Middle comercial raetone 2001 30 2031
disposal in sink High 1990 22 2012 1,800
disposal in sink Middle 2001 12 2013 1,800
disposal in sink Mast 1991 20 2011 1,800 1,800
disposal in sink Morse 1989 26 2015 1,800
Pownal oven 16,000
Pownal reach in refridgerator 20,000average life replacment original year
span year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Pownal building and Grounds
Boiler 1998 20 2018 25,000
Well & tanks 1967 50 2017 35,000
security system 2003 15 2018 19,000
sprinkler system 2003 50 2053
interior lighting 2006 25 2031 2,500
roof main building front 1985 25 2010 38,000
roof main building rear 2005 25 2030
roof gym area 1993 25 2018 28,000
vct flooring 2000 50 2050
carpet main hall 2005 10 2015 25,000
carpet library 2002 10 2012 12,000
carpet classrooms 2002 10 2012 10,000 12,000
fuel tanks 1989 30 2019 40,000
septic system 1967 50 2017 25,000
mower 2006 10 2016 10,000
snow blower 2006 10 2016 10,000
outside basketball court (crack sealer) 2001 15 2016
phone system 2006 10 2016 7,000
playground equipment 2000 13 2013 10,000
paving main parking 2000 15 2015 60,000
paving side plot na na na
Gym floor 2004 20 2024 37,000
Soffett and facia / front vesitbule / lighting 1967 45 2012 18,000
dishwasher 2005 25 2030 15,000
Superintendent Building 17 West Street
Boiler 2007 25 2032
Roof Main building 1993 30 2023 20,000
Roof rear section 2009 30 2039
Roof Garage 1985 30 2015 10,000
Pavement main lot 1999 25 2024 30,000
Pavement rear drive 2005 25 2030 10,000
carpet upper 2000 12 2012 10,000
carpet lower com ed 2000 17 2017 8,000
windows main building 2006 30 2036
windows spec ed lower 1990 30 2020 8,000
Average
Original Life Replacement
Year Span Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
windows business upper 1990 30 2020 8,000
siding 1999 50 2049Telephone Systems High School Middle School Mast Landing Morse St Pownal Elementary Durham Community Central Office
Fields High School Baseball Field High School Softball Field High School Performance Field High School Field Hockey Field Middle School Performance Field Middle School Baseball Field Middle School Softball Field Pownal School Playing Field Pownal School Basketball Court - outside Durham Fields
Notes:
1. Paving is subject to inspection, Life span to be determined
2. Repairs done in 2006 add 5 to 6 years to life span
3. Currently there is an air quality study being done that may determine equipment needs
4. Life span of sprinkler systems to be determined
5. Pending inspection
6. To date vct tile is good condition there is Vat in some areas that will need to be adressed
7. These numbers are only markers for a need to replace actual prices will be determined
8. Field seams done 2009 add 15 years to life of roof
9. Roof over gym storage and weight room reroofed 2009
Shared Debt 1990 2009 2001 2002 2008 2008 2010 2010
Mast Landing Durham Community Central Office Freeport High School Freeport High School - Heating Freeport High School - Lighting Capital Improvement Plans Total Total (Excluding State Participating) Difference from Buses
(State Participating) (State Participating) Previous Year
Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Total P & I Principal Interest Total P & I Principal Interest Total P & I
2009-2010 275,000.00 29,906.25 391,511.43 12,500.00 7,606.26 225,000.00 129,823.13 60,000.00 13,800.00 5,440.00 405.00 75,968.00 653,908.00 573,052.07 1,226,960.07 378,908.00 151,634.39 530,542.39 51,735.00 51,735.00
2010-2011 275,000.00 9,968.75 886,469.00 562,857.95 12,500.00 7,075.00 225,000.00 121,104.38 60,000.00 12,300.00 4,080.00 286.00 74,032.00 1,936.00 1,537,081.00 715,528.08 2,252,609.08 375,612.00 142,701.38 518,313.38 (12,229.01) 48,907.62 2,827.38 51,735.00
2011-2012 886,469.00 538,878.96 12,500.00 6,543.76 225,000.00 112,385.63 60,000.00 10,725.00 4,080.00 178.50 1,188,049.00 668,711.85 1,856,760.85 301,580.00 129,832.89 431,412.89 (86,900.49) 50,227.38 1,507.62 51,735.00
2012-2013 886,469.00 519,775.55 12,500.00 6,012.50 225,000.00 103,666.88 55,000.00 9,075.00 4,080.00 61.00 1,183,049.00 638,590.93 1,821,639.93 296,580.00 118,815.38 415,395.38 (16,017.51)
2013-2014 886,469.00 500,672.15 12,500.00 5,450.00 225,000.00 94,807.50 55,000.00 7,425.00 1,178,969.00 608,354.65 1,787,323.65 292,500.00 107,682.50 400,182.50 (15,212.88)
2104-2015 886,467.00 482,277.94 12,500.00 4,887.50 225,000.00 85,695.00 55,000.00 5,775.00 1,178,967.00 578,635.44 1,757,602.44 292,500.00 96,357.50 388,857.50 (11,325.00)
2015-2016 886,467.00 463,883.75 12,500.00 4,312.50 225,000.00 76,413.75 55,000.00 4,125.00 1,178,967.00 548,735.00 1,727,702.00 292,500.00 84,851.25 377,351.25 (11,506.25)
2016-2017 886,467.00 445,489.56 12,500.00 3,725.00 225,000.00 66,907.50 55,000.00 2,475.00 1,178,967.00 518,597.06 1,697,564.06 292,500.00 73,107.50 365,607.50 (11,743.75)
2017-2018 886,467.00 427,095.37 12,500.00 3,125.00 225,000.00 57,120.00 55,000.00 825.00 1,178,967.00 488,165.37 1,667,132.37 292,500.00 61,070.00 353,570.00 (12,037.50)
2018-2019 886,467.00 405,567.52 12,500.00 2,500.00 225,000.00 47,107.50 1,123,967.00 455,175.02 1,579,142.02 237,500.00 49,607.50 287,107.50 (66,462.50)
2109-2020 886,467.00 384,039.67 12,500.00 1,875.00 225,000.00 36,870.00 1,123,967.00 422,784.67 1,546,751.67 237,500.00 38,745.00 276,245.00 (10,862.50)
2020-2021 886,467.00 353,762.39 12,500.00 1,250.00 225,000.00 26,407.50 1,123,967.00 381,419.89 1,505,386.89 237,500.00 27,657.50 265,157.50 (11,087.50)
2021-2022 886,467.00 307,971.93 12,500.00 625.00 220,000.00 15,895.00 1,118,967.00 324,491.93 1,443,458.93 232,500.00 16,520.00 249,020.00 (16,137.50)
2022-2023 886,467.00 274,064.57 220,000.00 5,335.00 1,106,467.00 279,399.57 1,385,866.57 220,000.00 5,335.00 225,335.00 (23,685.00)
2023-2024 886,467.00 242,732.40 886,467.00 242,732.40 1,129,199.40
2024-2025 886,467.00 211,400.22 886,467.00 211,400.22 1,097,867.22
2025-2026 886,467.00 183,152.95 886,467.00 183,152.95 1,069,619.95
2026-2027 886,467.00 149,985.79 886,467.00 149,985.79 1,036,452.79
2027-2028 886,467.00 116,105.02 886,467.00 116,105.02 1,002,572.02
2028-2029 886,467.00 72,880.89 886,467.00 72,880.89 959,347.89
2029-2030 886,467.00 24,710.27 886,467.00 24,710.27 911,177.27
Totals 550,000.00 39,875.00 17,729,348.00 7,058,816.28 162,500.00 54,987.52 3,140,000.00 979,538.77 510,000.00 66,525.00 17,680.00 930.50 - 150,000.00 1,936.00 22,259,528.00 8,202,609.07 30,462,137.07 3,980,180.00 1,103,917.79 5,084,097.79 150,870.00 4,335.00 155,205.00
Non- Shared Debt 1998-2008 2001 2003 2008 2008 2009 Freeport Durham
Freeport CIP Freeport Middle School Reno Durham Roof Freeport Lighting Freeport Middle School Siding Durham Community Total Difference from Total Difference from
(State Revolving Reno Funds) Previous Year Previous Year
Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Total P & I Principal Interest Total P & I
2009-2010 47,804.00 3,994.00 157,000.00 86,233.76 40,000.00 14,196.40 14,560.00 1,082.50 52,432.94 48,067.30 271,796.94 91,310.26 363,107.20 40,000.00 62,263.70 102,263.70
2010-2011 32,804.73 2,408.21 157,000.00 79,561.26 40,000.00 12,990.20 10,920.00 764.00 52,432.94 108,834.00 69,104.16 253,157.67 82,733.47 335,891.14 (27,216.06) 148,834.00 82,094.36 230,928.36 128,664.66
2011-2012 32,804.73 1,886.46 155,000.00 72,888.76 40,000.00 11,659.00 10,920.00 477.75 52,432.94 108,834.00 66,160.20 251,157.67 75,252.97 326,410.64 (9,480.50) 148,834.00 77,819.20 226,653.20 (4,275.16)
2012-2013 15,459.29 266.67 155,000.00 66,301.26 40,000.00 10,252.80 10,920.00 164.00 52,432.94 108,834.00 63,814.82 233,812.23 66,731.93 300,544.16 (25,866.48) 148,834.00 74,067.62 222,901.62 (3,751.58)
2013-2014 155,000.00 59,520.00 40,000.00 8,801.60 108,834.00 61,469.45 155,000.00 59,520.00 214,520.00 (86,024.16) 148,834.00 70,271.05 219,105.05 (3,796.57)
2104-2015 155,000.00 52,545.00 40,000.00 7,310.40 108,835.00 59,211.14 155,000.00 52,545.00 207,545.00 (6,975.00) 148,835.00 66,521.54 215,356.54 (3,748.51)
2015-2016 155,000.00 45,415.00 40,000.00 5,764.20 108,835.00 56,952.81 155,000.00 45,415.00 200,415.00 (7,130.00) 148,835.00 62,717.01 211,552.01 (3,804.53)
2016-2017 155,000.00 38,130.00 40,000.00 4,158.00 108,835.00 54,694.48 155,000.00 38,130.00 193,130.00 (7,285.00) 148,835.00 58,852.48 207,687.48 (3,864.53)
2017-2018 155,000.00 30,690.00 40,000.00 2,516.80 108,835.00 52,436.16 155,000.00 30,690.00 185,690.00 (7,440.00) 148,835.00 54,952.96 203,787.96 (3,899.52)
2018-2019 155,000.00 23,250.00 40,000.00 845.60 108,835.00 49,793.10 155,000.00 23,250.00 178,250.00 (7,440.00) 148,835.00 50,638.70 199,473.70 (4,314.26)
2109-2020 155,000.00 15,500.00 108,835.00 47,150.04 155,000.00 15,500.00 170,500.00 (7,750.00) 108,835.00 47,150.04 155,985.04 (43,488.66)
2020-2021 155,000.00 7,750.00 108,835.00 43,432.78 155,000.00 7,750.00 162,750.00 (7,750.00) 108,835.00 43,432.78 152,267.78 (3,717.26)
2021-2022 108,835.00 37,810.91 108,835.00 37,810.91 146,645.91 (5,621.87)
2022-2023 108,835.00 33,647.97 108,835.00 33,647.97 142,482.97 (4,162.94)
2023-2024 108,835.00 29,801.19 108,835.00 29,801.19 138,636.19 (3,846.78)
2024-2025 108,835.00 25,954.42 108,835.00 25,954.42 134,789.42 (3,846.77)
2025-2026 108,835.00 22,486.40 108,835.00 22,486.40 131,321.40 (3,468.02)
2026-2027 108,835.00 18,414.34 108,835.00 18,414.34 127,249.34 (4,072.06)
2027-2028 108,835.00 14,254.66 108,835.00 14,254.66 123,089.66 (4,159.68)
2028-2029 108,835.00 8,947.87 108,835.00 8,947.87 117,782.87 (5,306.79)
2029-2030 108,835.00 3,033.78 108,835.00 3,033.78 111,868.78 (5,914.09)
Totals 128,872.75 8,555.34 1,864,000.00 577,785.04 400,000.00 78,495.00 47,320.00 2,488.25 209,731.76 - 2,176,696.00 866,637.98 2,249,924.51 588,828.63 2,838,753.14 2,576,696.00 945,132.98 3,521,828.98Source: , linked from www.rsu5.org/board-of-directors-and-policies/board-committees/standing-committees/finance-committee. Text copied out by software (pdftotext); no wording corrected.