RSU No. 5 Durham - Freeport - Pownal Capital / Facility Plan December 2009
revised 10-13-10
revised 10-12-11 Proposed Capital Item Descriptions Current Debt Maturity Schedule Energy efficiencies
fOfE2/2011
RSU No. §- Capital. | l Plan RSU No. 5 - Capital Plan 2013-2017 I 2013-2017 ‘Existing Capital = | f . 7 ‘Proposed —_ Debt Service Existing Total Capital Budget _ New Capital (Excluding State) Bus Payments Debt Service Impact 2012-2013 (FY 13) 2012-2013 a | | | j Item 1 Buses (2) 78 Passenger (Funded through retired bus debt) $0! | | [ tam 2’ Morse Street Resurface Bus Access Road "$25,000, ~ boo. i oT item 3 Mast Landing Carpet Replacement i $88,000) [ : pom Bo Item 4 Pownal Carpet Replacement . $22,000; L . ee dt BC Item 5, Kitchen Equipment (High school & Morse St dishwashers) $29,605 _ | aa ee oo . .. tem 6 Kitchen Equipment (Pownal Freezer) ce | $10,000 0 L ee ee oo .. Item 7,Middle School Boiler Plant ee |. $180,000) | | ee en Item 8 Morse Street Tile Replacement Lobby _ 7 i $11,000, L ‘ee T ees Item 9 Morse Street Clocks — | $10,000 i PP Item 10 Capital Reserve Account rs [ $24,39 | _ ee I i of $400,000) 409,648 | $54,092, $863,741, 840,71 | oo ~~ “Item 1 Bus (1) 78 Passenger ; . | $27,500) woe pe [ an ~ a Item 2 Pick-up Truck : L .. $20,009 | ia a . ee item 3 Middle School Re-pave Access Road a $75,000 to. 7 | tem 4'Morse Street FloorD Wing | $25,000 | [- en Se ___... Item S Athletic Fields Upgrade $100,000) | oo L. —_ oe tem 6 Athletic Fields Lights Oo , . $100,000) i i Too "Item 7/High School Bathrooms 100&300 wings oe | $39,500) | | po a ou . .. Item 8 Capital Reserves — $3,000 i 400,000 $584, 85 108.164, $002,687] $38,928 | i ; ' " ae Item 1 Bus (1) 78 Passenger (funded through retired bus debt) ie ‘$0! _ | _ i : “ | eee a ___ Item 2,High School Roof Replacement 100,200 & 300 wings _ _ _ $250,000 | | rr rn —., Item 3;,Pownal Main Hall Carpet oe fo 2509 i | ne Item 4,Centrai Office Carpet (upstairs) $10, i r a ii Item 6 Kitchen Equipment HS Steam Table | $16,000f | (eee oo Item 7'Mast Landing Resurface ParkingLot == sis; 50000, “| ane ie — _ cee $400,000) $383,220; 381,592) $864,812) -$37,855) revised 10-12-2011
2015-2016 (FY 16) 2015-2016 7 _ Item 1 Bus (1) 78 Passenger (funded through retired bus debt) $0) : . Item 2 High School Security System upgrade ; $15,000; i Item 3. Middie School Roof Repairs (Gym) i $50,000: i | __ item 4 Morse Street Roof Repair (Gym) $50,000) — | Item 5 Middle School Elevator Upgrade _ | $35,000) | | |
- Item 6 High School Elevator Upgrade — | $35,000) | Looe _. Item 7 High School Fire Alarm Upgrade _ _ $15,000 | : | a - ..... ., Item 8Mast Landing Security Upgrade | $15,000 . L | Oo oo ; Item 9 Middle & Mast Landing Outside Lighting Upgrade _ |. $10,000) | i. _ oo __ Item 10'Pownal Paving = | $60,000)” [ | [ _ —.. .. . tem 11/High School Air Handler | $50,000; | Lk en coun... Item 12)High School Carpet Main Hall Classrooms wf. $15,000) oe fee ne wok ne cette eee _ Item 13 Kitchen Equipment Mast Landing Dishwasher ns a $15,000) je | . a ~-. tem 14'Mast Landing Fire Protection = __.. $15,000 a | i re Capital Reserves i $20,000 i | | a es oe co ___|_. $400,000) $371,789, $55,000; 5826,789, $3802 2016-2017 (FY 17) 2018-2017 — _ po —_ a oe ae 7 Item 1 Bus (1) 78 Passenger (funded through retired bus debt) ia oo $0; [ i ; 7 i . : Item 2, Vans (2) Replacement. _ ; | $50,000 | [ i __ Item 3)ParkingLotSandep ee $8,000; I L es es . nom &Fownal Septic System 826,000, _[ i - - — a 7 Item 5 Middle School Fire alarm Upgrades _ ne i ia 2009 ; | | . po —— Item 6 Morse St Carpet C Wing . | $20,000 _— oe oS Item 7'Morse St Security Alarm Upgrade _ | $15,000) | f° Oo tem 8 Middle School Security Alarm Upgrades $15,000] a | es Se _ Item 9'Pownal Well & Tanks $38,000 ot sop ~ _ _.._ Item 10/Central Office Carpet Business Office i $8.00} | rs _— __ Item 14, Middle School Carpet Library & Office |. $12,001" [ | Po! Item 12 Central Office Roof Main Building - |. -$18,00 | | Lo _
- Item 13'Morse Street Carpet A & B Wings | $0.09, i= . ae i ___ }tem 14 Capital Reserves ee te ; _ | $142,000! | | | ; i . an _.,.. $400,000) _ $360,133) 655,000) $815,133; “$11,656 ravised 10-12-2011
Capital Budget Request 2012-2013 Item I Buses Two 78 Passenger Proposal:
Replacement of two International School Buses. These buses are fifteen years old and well above the ten year 150,000 mile replacement schedule recommended by the State Department of Education. Justification: We propose to purchase two 78 passenger buses to replace bus 21 and bus 5 and move these buses to the spare list. As part of the management of our fleet bus 35 and bus 38 will be removed from service and sold due to the year and condition of these buses. Expected Benefits: Improvements to the fleet for these route buses and removal of an older units increasing dependability for sports trips, which travel further distances Consequences if not approved: Continued use of older equipment and higher repair costs Budget: Cost associated to purchase $52,000.00 (1st payment of 3 year lease purchase) funded through retired bus debt
_ Current fleet Bus 20- 2000 Blue Bird Bus 21- 2001 International Bus 22- 2001 international Bus 23- 2003 Freightliner Bus 24- 2004 Thomas Bus 25- 2005 Thomas Bus 26- 2006 Thomas Bus 27- 2009 International Bus 28- 2010 International Bus 29- 2010 International (Durham) Bus 30-2012 International Bus 312012 International Bus § - 2000 international (Pownal) Bus 35- 1993 International Bus 37- 1996 International Bus 38- 1998 International 10/12/2011
Item 2
Morse St Repave Bus Access Road Proposal: To repave bus access road from Morse Street to intersection of Cross St. Justification: Pavement in this area is largely broken up with areas of pavement that have sunken in to form large puddles there are tripping hazards throughout this roadway Expected Benefits: Smoother safer bus road for traffic and students Consequences if not approved: Continued problems with snow removal and deteriorating of pavement in this area continued tripping hazards Budget: Cost associated with this project $25,000
[tem 3 Mast Landing Carpet Replacement Proposal:
To replace the carpet throughout this school on upper and lower levels Justification: The carpet in this school is deteriorating to the point where the backing has come loose from the Carpet causing ripples and tears throughout the building. Many areas have been taped to prevent increased tearing Expected Benefits: With the current amount of rippling in this carpet it is becoming a tripping hazard, replacement now would eliminate these hazards and greatly improve the appearance of this building Consequences if not approved: Continued ripping and tearing of this carpet, increase chance of injury due to trips and falls Budget:
Cost associated with this project $88,000
10/12/2011
Item 4
Pownal Carpet Replacement Proposal: To replace carpet in classroom areas Justification:
The carpet in the classroom areas of this building are failing at the seams and pulls have developed in most rooms tape has been used to increase the life cycle of this carpet but it is now at the end of useful life Expected Benefits: New flooring will greatly improve the appearance of this school Consequences if not approved: Continued tearing and tripping hazards from these seam failures Budget: Cost associated with this project $22,000 Item § Kitchen Equipment High School & Morse St. Dishwashers Proposal: To replace dishwashers at the High School and Morse St. School Justification: Dishwashers at both schools are at the end of their life cycle of 25 years Expected Benefits: Continued updating of kitchen equipment to improve food services, cost savings through more efficient units Consequences if not approved: Increased maintenance costs to this equipment Budget:
Cost associated with this project $29,605
10/12/2011
Item 6
Kitchen Equipment Pownal Freezer Proposal: To replace the reach in freezer at Pownal Elementary School Justification: Reports from the service professionals indicate that the compressor is at the end of its life cycle Expected Benefits: Reliable equipment to store food cost savings through more efficient unit Consequences if not approved: Possible loss of products due to freezer failure Budget: Cost associated with this project $10,000
Item 7 Middle School Boller Replacement Proposal:
To replace 10 Hydrotherm Boilers to two burderus high efficient boilers Justification: These ten boilers are at the end of their life cycle, two of the units have failed and are currently out of service, parts to repair these units are hard to locate and are expensive. With the availability of natural gas it makes sense to replace these units with newer more efficient boilers. Expected Benefits: Reduced energy costs. Better heating environment within the school building (payback through natural gas conversion) Consequences if not approved: Continued failure of remaining units could lead to insufficient heating abilities Budget:
Cost associated with this project $180,000
10/12/2011
Item 8
Morse Street Tlle Replacement Lobby Area Proposal: To replace the floor tile in lobby area extending into wing D hallway Justification: With the improvements to the main office area this older floor really shows it's age against the newer construction Expected Benefits: Cleaner more inviting environment for this K to 2 school Consequences if not approved: Continued worn appearance of our oldest school building Budget: Cost associated with this project $11,000
Item 9 Morse Street Clock Replacement Proposal:
To replace the master clock system with a new wireless clock system Justification: The master clock system in this building is not reliable and often is in need of repairs, many of the clocks in this building have been converted to battery operation. Battery clocks and master clocks do not synchronize causing problems to the schedules at this building Expected Benefits: Entire building on the same schedule allowing all teachers and students to be on time for different classes Consequences if not approved: Continued time keeping problems with daily schedules Budget:
Cost associated with this project $10,000
10/12/2011
. RSU No.5 Durham-Freeport-Pownal Debt to Maturity Shared Debt 2009 2001 2002 2008 2008
Durham Community Central Office Freeport High School FHS - Heating FHS - Lighting _ (State Participating) __ Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest 2011-2012 886,469.00 538,878.96 © 11,250.00 6,254.75 210,000.00 112,385.63 60,000.00 10,725.00 4,080.00 178.50 2012-2013 886,469.00 519,775.55 12,500.00 5,265.75 220,000.00 103,666.88 55,000.00 9,075.00 4,080.00 61.00 2013-2014 886,469.00 500,672.15 12,500.00 4,750.00 220,000.00 94,807.50 55,000.00 7,425.00 2104-2015 886,467.00 482,277.94 12,500.00 4,250.00 220,000.00 85,695.00 55,000.00 5,775.00 2015-2016 886,467.00 463,883.75 12,500.00 3,750.00 220,000.00 76,413.75 55,000.00 4,125.00 2016-2017 886,467.00 445,489.56 12,500.00 3,250.00 220,000.00 66,907.50 55,000.00 2,475.00 2017-2018 886,467.00 427,095.37 12,500.00 2,687.50 220,000.00 57,120.00 55,000.00 825.00 ‘ 2018-2019 886,467.00 405,567.52 12,500.00 2,062.50 220,000.00 47,107.50 2109-2020 886,467.00 384,039.67 12,500.00 1,437.35 220,000.00 36,870.00 2020-2021 886,467.00 353,762.39 11,250.00 843.75 220,000.00 26,407.50 2021-2022 886,467.00 307,971.93 11,250.00 281.25 220,000.00 15,895.00 2022-2023 886,467.00 274,064.57 215,000.00 5,335.00
2023-2024 886,467.00 242,732.40 2024-2025 886,467.00 211,400.22 2025-2026 886,467.00 183,152.95 2026-2027 886,467.00 149,985.79 2027-2028 886,467.00 116,105.02 2028-2029 886,467.00 72,880.89 2029-2030 886,467.00 24,710.27
Totals 16,842,879.00 6,104,446,90 133,750.00 34,832.85 2,625,000.00 728,611.26 390,000.00 40,425.00 8,160.00 239.50
Revised 10/12/2011
RSU No.5 .
Durham-Freeport-Pownal Debt to Maturity Shared Debt
Total Total (Excluding State Participating) Difference from Existing Bus Leases Previous Year Principal Interest Total P & I Principal Interest Total P & I Principal Interest Total P & I
2011-2012 1,171,799.00 668,422.84 1,840,221.84 285,330.00 129,543.88 414,873.88 (103,439.50) 104,319.38 1,507.62 105,827.00 2012-2013 1,178,049.00 637,844.18 1,815,893.18 291,580.00 118,068.63 409,648.63 (5,225.25) 51,265.84 2,826.16 54,092.00 2013-2014 1,173,969.00 607,654.65 1,781,623.65 287,500.00 106,982.50 394,482.50 (15,166.13) 52,642.16 1,449.84 54,092.00 2104-2015 1,173,967.00 577,997.94 1,751,964.94 287,500.00 95,720.00 383,220.00 (11,262.50)
2015-2016 1,173,967.00 548,172.50 = 1,722,139.50 287,500.00 84,288.75 371,788.75 (11,431.25)
2016-2017 1,173,967.00 518,122.06 1,692,089.06 287,500.00 72,632.50 360,132.50 (11,656.25)
2017-2018 1,173,967.00 487,727.87 1,661,694.87 287,500.00 60,632.50 348,132.50 (12,000.00)
2018-2019 1,118,967.00 454,737.52 1,573,704.52 232,500.00 49,170.00 281,670.00 (66,462.50)
2109-2020 1,118,967.00 422,347.02 1,541,314.02 232,500.00 38,307.35 270,807.35 (10,862.65)
2020-2021 1,117,717.00 381,013.64 1,498,730.64 231,250.00 27,251.25 258,501.25 (12,306.10)
2021-2022 1,117,717.00 324,148.18 1,441,865.18 231,250.00 16,176.25 247,426.25 = (11,075.00)
2022-2023 1,101,467.00 279,399.57 = 1,380,866.57 215,000.00 5,335.00 220,335.00 (27,091.25)
2023-2024 886,467.00 242,732.40 = 1,129,199.40 (220,335.00)
2024-2025 886,467.00 211,400.22 1,097,867.22
2025-2026 886,467.00 183,152.95 1,069,619.95
2026-2027 886,467.00 149,985.79 — 1,036,452.79 2027-2028 886,467.00 116,105.02 1,002,572.02 2028-2029 886,467.00 72,880.89 959,347.89 2029-2030 886,467.00 24,710.27 911,177.27
Totals 19,999,789.00 6,908,555.51 _26,908,344.51 _3,156,910.00 804,108.61 3,961,018.61 208,227.38 5,783.62 214,011.00
Revised 10/12/2011
, RSU No. 5 Durham - Freeport - Pownal Debt to Maturity
Non- Shared Debt 1998-2008 2001 2003 2008 2008 Freeport CIP Freeport Middle School Reno Durham Roof Freeport Lighting Freeport Middle School Siding (State Revolving Reno Funds) Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest 2011-2012 32,804.73 1,886.46 144,431.82 66,968.51 40,000.00 11,659.00 10,920.00 477.75 52,432.94 2012-2013 15,459.29 266.67 147,954.55 55,562.22 40,000.00 10,252.80 10,920.00 164.00 52,432.94 2013-2014 147,954.55 49,459.09 40,000.00 8,801.60 2104-2015 147,954.55 43,540.91 40,000.00 7,310.40 2015-2016 147,954.55 37,622.73 40,000.00 5,764.20 2016-2017 144,431.82 31,775.00 40,000.00 4,158.00 2017-2018 144,431.82 25,275.57 40,000.00 2,516.80 2018-2019 144,431.82 18,053.98 40,000.00 845.60
2109-2020 144,431.82 10,832.39 2020-2021 144,431.82 3,610.80 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030
Totals 48,264.02 2,153.13 1,458,409.12 342,701.20 320,000.00 51,308.40 21,840.00 641.75 104,865.88 -
Revised 10/12/2011
RSU No. § Durham - Freeport - Pownal Debt to Maturity Non- Shared Deb 2009 Freeport Durham
Durham Community Total Difference from Total Difference from Previous Year Previous Year Principal Interest Principal Interest Total P& I Principal Interest Total P & I 2011-2012 108,834.00 66,160.20 240,589.49 69,332.72 309,922.21 (25,968.93) 148,834.00 77,819.20 226,653.20 (4,275.36) 2012-2013 108,834.00 63,814.82 226,766.78 55,992.89 282,759.67 (27,162.54) 148,834.00 74,067.62 222,901.62 (3,751.58) 2013-2014 108,834.00 61,469.45 147,954.55 49,459.09 197,413.64 (85,346.03) 148,834.00 70,271.05 219,105.05 (3,796.57) 2104-2015 108,835.00 59,211.14 147,954.55 43,540.91 191,495.46 (5,918.18) 148,835.00 66,521.54 215,356.54 (3,748.51) 2015-2016 108,835.00 56,952.81 147,954.55 37,622.73 185,577.28 (5,918.18) 148,835.00 62,717.01 211,552.01 (3,804.53) 2016-2017 108,835.00 54,694.48 144,431.82 31,775.00 176,206.82 (9,370.46) 148,835.00 $8,852.48 207,687.48 (3,864.53) 2017-2018 108,835.00 52,436.16 144,431.82 25,275.57 169,707.39 (6,499.43) 148,835.00 54,952.96 203,787.96 (3,899.52) 2018-2019 108,835.00 49,793.10 144,431.82 18,053.98 162,485.80 (7,221.59) 148,835.00 50,638.70 199,473.70 (4,314.26) 2109-2020 108,835.00 47,150.04 144,431.82 10,832.39 155,264.21 (7,221.59) 108,835.00 47,150.04 155,985.04 (43,488.66) 2020-2021 108,835.00 43,432.78 144,431.82 3,610.80 148,042.62 (7,221.59) 108,835.00 43,432.78 152,267.78 (3,717.26) 2021-2022 108,835.00 37,810.91 108,835.00 37,810.91 146,645.91 (5,621.87) 2022-2023 108,835.00 33,647.97 108,835.00 33,647.97 142,482.97 (4,162.94) 2023-2024 108,835.00 29,801.19 108,835.00 29,801.19 138,636.19 (3,846.78) 2024-2025 108,835.00 25,954.42 108,835.00 25,954.42 134,789.42 (3,846.77) 2025-2026 108,835.00 22,486.40 108,835.00 22,486.40 131,321.40 (3,468.02) 2026-2027 108,835.00 18,414.34 108,835.00 18,414.34 127,249.34 (4,072.06) 2027-2028 108,835.00 14,254.66 108,835.00 14,254.66 123,089.66 (4,159.68) 2028-2029 108,835.00 8,947.87 108,835.00 8,947.87 117,782.87 (5,306.79) 2029-2030 108,835.00 3,033.78 108,835.00 3,033.78 111,868.78 (5,914.09)
Revised 10/12/2011
Goal 5. Explore and implement s range of strategies to support Energy Efficiencies and cost savings. This initiative is as important to the district financially as it is educationally. This effort will enable us to research ways to reduce our budgets in all areas while we demonstrate effective use of sustainable resources for our students.
Energy Efficiencies- Completed High School Energy Management System — 2008
Boiler upgrade with efficient burner controls “AutoFlame”-2008 Frequency drives on all circulator pumps —2008
Merv 14 filtration -2008 New unit-ventilators -2008 Bypass valves all unit-ventilators -2008 Occupancy sensors in classrooms -2008 Co2 sensors in classrooms -2008 Lighting upgrade-school wide -2008 Re-roofing with added insulation -2009 Exhaust air controls -2008
Re-roof art area with added insulation -2005
Re-roof gym with added insulation -201 1 Natural Gas conversion -2010 Middle School Earned Energy Star Rating -2007 Energy management system -2007
Bypass valves at air intake coils to 24 volt controls -2007 Removal of old pneumatics -2007 Added insulation older section of building-2008 Added insulation on pitched roof to R-40 -2008 Lighting upgrades school wide -2007
Mast Landing School Energy management system -2008 _ Lighting up-grades school wide -2007 Occupancy sensors -2007 Natural Gas -2011 Morse Street School Re-roof with added insulation -2006
Limited energy management but existing controls calibrated-2005
Lighting up-grade school wide -2007 Replaced Electric water heater-2010 Natural Gas-201 1 Pownal Elementary School Added insulation in attic -2005 Enclosed front entry -2010 Upgrade Gym Lighting -2010 Natural Gas -2011 District Wide
Continued use of recycled equipment — ongoing (Lighting, ceiling tiles, furniture, etc) Efficiencies Planned for 2012-13 Middle School Conversion to natural gas, this conversion will include a complete boiler plant upgrade and save over 45,000 per year by switching to natural gas. Payback for this project is 3.94 years. Kitchen equipment: Replacement of aging equipment at the High School, Pownal Elementary School and Morse Street School will reduce energy cost by replacing this equipment with new energy efficient units.
Source: , linked from www.rsu5.org/budget/budget-2012-2013. Text copied out by software (pdftotext, then OCR); no wording corrected.