Facilities
Board meetings · Board of Directors · 2 pages · 175 words · all RSU 5 documents · the district's file →
Text copied out by software, not the document itself. Layout, tables and figures may not survive. The district's copy is authoritative; check it before relying on this text.
Facilities Department Goals 2023-2024 Review
Goal Worksheet
School/Department: Facilities
Department Goal Strategies and Action Steps Timeline Evidence of
(Responsibility) Effectiveness
Ensure all facilities are 1. Replace Pownal Septic/Leach field. 2023/2024 Engineering firm
operating efficiently and completed the septic
effectively. design.
2. Conduct a full district energy audit including 2023/2024 Energy audit completed
water usage to identify needed and shared with Board
improvements in RSU5 facilities. Facilities and Operations
Committee.
3. Conduct a comprehensive building 2023/2024 Initial assessment
assessment. completed. Updated
regularly as needs arise.
4. Complete the following 22/23 carry-over 2023/2024 Additional PES building
items: security items identified.
● PES Security Plan being developed for
● PES Pave rear walkway completion.Facilities Department Goals 2024-2025
Goal Worksheet
School/Department: Facilities
Department Goal Strategies and Action Steps Timeline Evidence of
Responsibility Effectiveness
Ensure all facilities are 1. Develop an articulated capital improvement 2024/2025 Capital Improvement
operating efficiently and plan that includes items identified through Plan
effectively. the energy audit and comprehensive building
assessment.
2. Develop an articulated plan for vehicle and 2024/2025 Vehicle Replacement
equipment replacement. PlanSource: , linked from www.rsu5.org/board-of-directors-and-policies/board-of-directors. Text copied out by software (pdftotext); no wording corrected.
