Skip to content

Facilities

Board meetings · Board of Directors · 2 pages · 175 words · all RSU 5 documents · the district's file →

Text copied out by software, not the document itself. Layout, tables and figures may not survive. The district's copy is authoritative; check it before relying on this text.

Facilities Department Goals 2023-2024 Review

Goal Worksheet

School/Department: Facilities

Department Goal                      Strategies and Action Steps                    Timeline          Evidence of
                                           (Responsibility)                                          Effectiveness

Ensure all facilities are       1. Replace Pownal Septic/Leach field.                  2023/2024   Engineering firm
operating efficiently and                                                                          completed the septic
effectively.                                                                                       design.

2. Conduct a full district energy audit including      2023/2024   Energy audit completed
   water usage to identify needed                                  and shared with Board
   improvements in RSU5 facilities.                                Facilities and Operations
                                                                   Committee.

3. Conduct a comprehensive building                    2023/2024   Initial assessment
   assessment.                                                     completed. Updated
                                                                   regularly as needs arise.

4. Complete the following 22/23 carry-over             2023/2024   Additional PES building
   items:                                                          security items identified.
       ● PES Security                                              Plan being developed for
       ● PES Pave rear walkway                                     completion.

Facilities Department Goals 2024-2025

Goal Worksheet

School/Department: Facilities

Department Goal                     Strategies and Action Steps                      Timeline          Evidence of
                                           Responsibility                                             Effectiveness

Ensure all facilities are       1. Develop an articulated capital improvement            2024/2025   Capital Improvement
operating efficiently and          plan that includes items identified through                       Plan
effectively.                       the energy audit and comprehensive building
                                   assessment.

2. Develop an articulated plan for vehicle and           2024/2025   Vehicle Replacement
   equipment replacement.                                            Plan

Source: , linked from www.rsu5.org/board-of-directors-and-policies/board-of-directors. Text copied out by software (pdftotext); no wording corrected.