Skip to content

November 20, 2019

Board meetings · Agendas · November 20, 2019 · 71 pages · 18,999 words · all RSU 5 documents · the district's file →

Text copied out by software, not the document itself. This is an image-only scan, read by text-recognition software, so figures, names and tables are unreliable. The district's copy is authoritative; check it before relying on this text.

REGULAR MEETING OF RSU NO. 5 BOARD OF DIRECTORS WEDNESDAY-— NOVEMBER 20, 2019 DURHAM COMMUNITY SCHOOL - CAFETERIA 6:30 P.M. REGULAR SESSION AGENDA 1, Call to Order: The meeting was called to order at p.m. by Chair Michelle Ritcheson

2. Attendance: ___Kathryn Brown ___Maura Pillsbury ___Jeremy Clough ___ Michelle Ritcheson ___ Candace deCsipkes ___Lindsay Sterling ___Lindsey Furtney ___ Valeria Steverlynck ___ Jennifer Galletta ___Madelyn Vertenten ___ Elisabeth Munsen ___Rhea Fitzpatrick — Student Representative ___ Liam Hornschild-Bear — Student Representative

3. Pledge of Allegiance: 4, Consideration of Minutes:

A. Consideration and approval of the Minutes of November 6, 2019 as presented barring any errors or omissions. Motion: 2nd; Vote:

5. Adjustments to the Agenda:

6. Good News & Recognition:

A. Report from Board’s Student Representative (10 Minutes)

B. Good News from Durham Community School — Will Pidden (10 Minutes)

7. Public Comments: (10 Minutes)

8. Reports from Superintendent:

A. Items for Information (10 Minutes) 1, District Happenings

9. Administrator Reports: A, Durham Community School Goal Review — Will Pidden (20 Minutes)

B. Technology Report/Goal Review — Jim Grant (20 Minutes)

C. Athletics Report/Goal Review — Craig Sickels (20 Minutes)

D. Finance — Ann Cromer (3 Minutes)

10. Board Comments and Committee Reports:

A. Board Information Exchange and Agenda Requests (10 Minutes)

B. Finance Committee (5 Minutes)

C. Policy Committee (5 Minutes)

RSU No. 5 Agenda for November 20, 2019

Page 2

11. Policy Review:

A. Consideration and approval of the following Policy (1% Read) (10 Minutes) 1, BBAB — Board of Directors Self-Evaluation Motion: 2nd, Vote:

B. Consideration and approval of the following Policy (2"4 Read) (5 Minutes)

1. IMGA - Service Animals in Schools Motion: 2nd. Vote:

12. Unfinished Business:

A. Cost Sharing — Concepts of Fairness (45 Minutes)

B. Workplace Satisfaction Survey Executive Summary (20 Minutes)

13. New Business:

14. Personnel:

A. Consideration and approval to employ a Special Education Teacher at Freeport Middle School for the 2019-2020 School Year. (5 Minutes) Motion: 2m: Vote: 15, Public Comments: (10 Minutes)

16. Adjournment: Motion: 2nd; Vote: Time:

RSU No. 5 Board of Directors Meeting Phen AN, Wednesday, November 6, 2019 — 6:30 p.m. Freeport Middle School - Cafeteria Meeting Minutes (NOTE: These Minutes are not official until approved by the Board of Directors. Such action, either to approve or amend and approve, is anticipated at the November 20, 2019 meeting).

1. CALLED TO ORDER:

Chair Michelle Ritcheson called the meeting to order at 6:3] p.m.

2. MEMBERS PRESENT: Kathryn Brown, Jeremy Clough, Candace deCsipkes, Lindsey Furtney, Jennifer Galletta, Elisabeth Munsen, Maura Pillsbury, Michelle Ritcheson, Lindsay Sterling, Valeria Steverlynck, Madelyn Vertenten, Liam Hornschild-Bear, Student Representative MEMBERS ABSENT: None

3. PLEDGE OF ALLEGIANCE:

4. CONSIDERATION OF MINUTES:

A. VOTED: To approve the Minutes of October 23, 2019 as presented. The student representative voted with the majority. (Steverlynck - Sterling) (11 — 0)

5. ADJUSTMENTS TO THE AGENDA:

Move Agenda Item #15 prior to Item #12

6. GOOD NEWS AND RECOGNITION:

A. Report from Board’s Student Representative — Liam Hornschild-Bear

B. Good News from Freeport Middle School — Ray Grogan 7, PUBLIC COMMENT: None

8. REPORTS FROM SUPERINTENDENT: None

9. ADMINISTRATOR REPORTS:

A. Freeport High School Goal Review — Jen Gulko

B. Community Programs Report/Goal Review — Peter Wagner

C. Freeport Middle School Goal Review — Ray Grogan

10. BOARD COMMENTS AND COMMITTEE REPORTS: None 11, POLICY REVIEW: None

Item #15 was taken out of order

15, PUBLIC COMMENT:

Joe Migliaccio, Sarah Tracy and Melanie Sachs, Freeport Kevin Nadeau, Durham

RSU No. 5 Board of Directors Meeting Minutes 116-19

Page 2 of 2

12. UNFINISHED BUSINESS:

A. A motion was made by Brown, seconded by deCsipkes to adjust the RSUS Cost Sharing Methodology as presented by the Finance Committee at the October 23, 2019 meeting of the RSU5 Board of Directors. An amendment was made to Steverlynck, seconded by Vertenten that the ALM be 60% valuation and 40% per pupil and minimum Special Education adjustment is left as shared and not applied directly to Freeport. Steverlynck withdrew her amendment and Vertenten withdrew her second. Vote on main motion as presented: (450 — 548 Pillsbury, Furtney, Sterling, Steverlynck, Vertenten, Munsen) Motion Fails

13. NEW BUSINESS: This Item was Tabled

A. Workplace Satisfaction Survey Executive Summary.

14. PERSONNEL:

None

16. ADJOURNMENT:

VOTED: To adjourn at 10:24 p.m. (Galletta - Steverlynck) (11 — 0)

Becky J.Fokty, Superintendent of Schools

Reflection on Goal 2018/19 Then. A.

School: Durham Community School

Team Name: Whole school

Team Members: School staff

District Goal: (Focus on Student Achievement through Improved Student-Centered Teaching and Learning)

We have identified a number of mediators of feedback and achievement including the distinction between focusing on giving or receiving feedback, how the culture of the student can mediate the feedback effects, the importance of disconfirmation as well as confirmation, and the necessity for the climate of the learning to encourage “errors” and entice students to acknowledge misunderstanding and particularly the power of peers in this process. ~ Hattie from 2011

This two year goal is to improve the effectiveness of feedback from both teachers and peers, resulting in an increase in student achievement across content areas.

Review and reflection from year 1

2017/18

As the goal work developed last year, we became increasingly aware of several factors involved with providing impactful feedback that go beyond the procedural steps we had started out pursuing. Identifying success criteria and learning intentions is relatively straightforward, although ensuring it is student friendly while meeting the expectations for rigor takes time and practice. Likewise, giving students feedback as to where they are relative to success, or having them identify for themselves their progress, is a familiar skill and has been more about refinement and consistency than new leaming. However, giving specific feedback as to the next steps a learner should take to get closer to success has been the biggest hurdle for teachers. The common denominator of those who are most successful at this is that they have a high level of content knowledge. We have shown this in a formula:

- clear success criteria and learning intentions + content knowledge = confidence and ability to give “next step” feedback.

Content knowledge leads not only to confidence to give next step feedback, it also results in that feedback being most useful. Another factor that we had not anticipated being so significant is the need to have a strong culture for feedback. Unless the learners know how to receive feedback and are willing to use it, it doesn’t matter how good the feedback is, it won’t have an impact. Therefore when considering the importance of a culture for feedback it results in another formula:

- confidence and ability to give “next step” feedback + culture for feedback = student growth from feedback. Along with the importance of content knowledge and a culture for feedback, the third significant factor we had not accounted for was the importance of teachers recognizing feedback we receive all the time from students. Hattie and colleagues state that student to teacher feedback is more important than teacher to student feedback. This feedback comes in many forms, but as teachers it is critical that we are open to, and create situations where we can receive feedback about our impact. We had wrestled with how to assess growth in this goal when first writing it and had determined to select a range of students to monitor their progress. The additional learning that continues around the practice of effective feedback meant that we decided to defer that measurement to year two. Therefore in year two we are looking at several measures of success: Teacher outcomes:

® Teachers demonstrate increased content knowledge about effective feedback practices.

e Teachers develop and sustain a culture for feedback within their classrooms.

e Teachers receive feedback from their students, colleagues, and through self reflection.

® Teachers apply what has been learned through feedback, to their practices in increasingly effective and diverse ways.

As measured by: Mini observations Teacher reflections

Student growth on classroom based performance assessments. (based on selected sub groups) Reflection of year two -2018/19

© Teachers demonstrate increased content knowledge about effective feedback practices. Teachers continue to develop the skills of effective feedback practices by providing clear learning intentions and communicating success criteria. This work is being supported by math and literacy strategists with a focus on increasing teacher effectiveness when using conferring skills with students.

® Teachers develop and sustain a culture for feedback within their classrooms. A culture for feedback has become more established and is evident at student recognition assemblies. Teachers are frequently making the connection between student success and their ability to respond to feedback. This is reinforced when visiting classrooms and talking with students as they are often able to articulate what they are working on and what their next steps are.

® Teachers receive feedback from their students, colleagues, and through self reflection.

We have experienced an increase in staff recognizing and acting upon student “feedback.” Feedback from students comes in the form of student behaviors, student engagement, and assessments. Staff are reflective of this feedback and seek input from colleagues to address areas for improvement while also sharing successful strategies with one another.

© Teachers apply what has been learned through feedback to their practices in increasingly effective and diverse ways.

What we have become increasingly aware of is the need for feedback to be followed up in a timely manner. Teachers report that the most impactful strategy is to follow up within the same lesson to see that the student understood the feedback and is acting upon it. We conducted a survey of staff to see how transferable our feedback from mini observations was to them and their practices. 95% of the respondents felt that feedback from mini observations is transferable to their practices. What was of real interest though was that a number of suggestions for improvement in the process parallelled the learning we found with students, in terms of the benefit of detailed next steps, providing clear success criteria, and then following up on the feedback. Student growth on classroom based performance assessments. (Staff on School Leadership Team conducted action research) To focus in on specific initiatives we had members of our school leadership team track the progress of a range of students in their classes to gauge their perceptions of feedback and the impact feedback practices had on their growth. The classes included P.E. kindergarten, 4th grade, 5th grade, K-4 literacy intervention, K-3 special education and 7th and 8th grade Spanish. Across the classes the impact ranged from 50% of students showing growth to 100%. When feedback was based within a specific unit the growth was more evident, i.e. pretest to post test. When the feedback was ongoing over multiple units, the impact was less significant. In PE and Spanish, feedback had significant impact on student growth with approximately 85% of students making growth from a pre-test to a post test. Upon reflection we linked this to the specificity of the feedback relative to observable success criteria. For example in his reflection our PE teacher noted precise and frequent feedback led to better student understanding across the board. The more direct and exact the feedback was in relation to the skills desired the more influential the feedback was.

Example: “That was a great shot” versus “You used the right amount of power with the right angle to hit that shot into a spot on the court where your opponent could not get to it.” In classes where the data was gathered over the course of a year versus a unit, there was less significant academic growth. However, around 90% of students improved their effort and response to feedback. For example, when asked the question about getting teacher feedback some comments from struggling readers were: I feel “kind of scared” when making a mistake, or when the teacher corrected, one feels “scared of getting a bad report.” These changed to feels “a little frustrated sometimes” when he makes mistakes, but feels “a little better” when teacher corrects, “like they’re helping.” Another “feels happy” about her reading, sees herself as a “good reader.” Another child had got to the point of saying “it feels kind of good when making mistakes because it’s a learning opportunity.”

In the case of our literacy intervention teacher she also found that clear feedback relative to clear success criteria also led to increased parent support at home, as it was easier for parents to play a role in the learning process.

In all cases, across all levels, we found that those students who are already successful tend to have a growth mindset and are receptive to feedback, thus continuing the cycle of learning. Whereas those students who find school harder and have learning to do, did not have such established growth mindsets, and were often more reluctant to receive and/or act upon feedback, thus continuing to limit the cycle for learning. These observations reinforced the urgency of developing and maintaining a culture for feedback and a growth mindset for all learners. Sample of activities undertaken across the school PreK/ K/1 created student facing rubrics (using Mindset for Learning) Visual Rubrics for kids to reflect on their own Worked on helping kids to use the already created rubrics; narrowing rubrics to focus on specific aspects during a genre or unit; creating success criteria that is clear and explicit; Thinking about for next year - what does it take to be a good leamer, friend, classmate, and receiving feedback.

3-4 Created rubrics for TC work where they felt they needed to give more feedback; HOW’'s rubrics & check-ins; kids giving themselves verbal feedback (esp. Related to social issues); seeking feedback from kids - what helped you learn?, what did you leam?, etc...

Steps for Receiving and Using feedback: Name it, understand it, decide to use it Feedback from being in groups Giving feedback to yourself - “Hmm, ____. / noficed you haven't been...” Receiving social and emotional feedback, challenging feedback Expect error as part of leaming; Student discourse increased opportunities to look at errors as potential leaming Praise Risk-taking; Stress the “Power of Yet”; HoW Every two weeks, write a summary of data (used in grading) Rubric was retumed to students with teacher feedback and students became more aware of their HoWs over time

738 Review rubrics - are they written in a way that students can receive feedback to determine areas of success and areas that need improvement? Watched motivation videos - to help kids want to use feedback being given to them Leadership groups developed with all students - giving them a voice in their everyday education. Provide us feedback.

Reviewed lessons taught and how we're giving and receiving feedback during the lesson

Specials Identified success criteria and helped students independently monitor themselves and peers against the success criteria; Feedback Gallery - posting work and commenting related to success criteria; student's named what they wanted feedback on and teacher provided that; peer feedback allowed for reflection on own work; focus on acceptance of feedback and seeking out feedback Built common language for feedback across the different specials classes.

Special Ed Focussed on culture and understanding that making mistakes is important and expected in leaming. Model led mistakes and how to handle them What to Do when mistakes make you Quake? Book Introducing & defining Growth Mindset - bulletin boards; negative self-talk

Overall reflection:

Feedback is a powerful tool when done in an effective way. Key learnings over the two years have been:

e Feedback from the learner to the teacher is more powerful than from the teacher to the learner.

® The most impactful feedback is ongoing. (This is the hardest to implement due to time demands).

® Itis important to recognize whether feedback or re-teach is the correct response to a learner.

® Like any cultural norm, a culture for feedback must be created and sustained by recognizing it, modeling it, and reinforcing it.

* Successful students see feedback as a part of the learning process and have confidence in themselves as learners. Less successful students have less confidence in themselves as learners and can find feedback difficult. Developing a growth mindset is essential in a culture of feedback.

® The time required to provide ongoing feedback at an individual and small group level is significant. Therefore there is work to be done in finding the balance between covering our curriculum demands while providing time for students to reflect and act upon feedback they receive.

DCS School Goals 2019-2020 | School: Durham Community School Team Members: DCS staff

District Goal: Focus on Student Achievement through Improved Student-Centered Teaching and Learmming Goals Strategies and Action Steps Evidence of Effectiveness Strategic Goal 1: All RSU 5 students experience a joyful Reduction in chronic absenteeism by students learning climate that is safe, nurturing, and fosters curiosity. # Implement and refine Responsive 100% of classroom teachers and specialists Classroom practices will be trained in Responsive Classroom practices.

e Team of teachers to attend 4 day training DCS Goal 1: PK -5. (Year 1 of 2) To implement a school wide model that ° Have representatives attend 6-8 training. Moming meeting and Responsive Advisory will nurtures a positive culture and be used in all PK-8 classrooms daily. enhances academic and social-emotional skills across e Dedicate one staff meeting a month to our PK-8 community. Responsive Classroom implementation and professional leaming. e | teR ive Cl Impact on staff morale as interpreted on ncorporate Responsive Classroom Satisfaction Survey. practices into all staff meetings.

e Incorporate Responsive Classroom K-2 children wilt transfer skills from guidance practices and align with guidance lessons on a more regular basis. curriculum at weekly K and 1-2 assemblies.

1

e Reinforce Core Values at each grade span | Students will demonstrate stronger self through assemblies. reflection skills and understanding of Core Values

# Implement use of Risk Screener to identify | Documentation and use of data at Student student external and internal needs, and Assistance Team meetings. Reduction of “at target supports. risk flags.”

*® Increase opportunities for student to student mentoring and cross grade level interactions.

e Continue to build positive bus culture Reduction in number of bus slips using Peaceful Bus strategies.

e Increase range of field work and Additional and relevant field work and enrichment offerings that enhance enrichment opportunities curriculum.

2

Strategic Goal #2 All RSU 5 students regularly engage in meaningful student centered * Narrow teacher goals to allow more focus | Shared planning documentation learning. and reduce overload. In response to teacher feedback, the goal is to focus professional leaming and make more Outcome: concrete connections to specific Impact on staff morale as interpreted on Increased student practices. Satisfaction Survey. achievement in reading/math from data points identified on | Academic goals (regardless of content) were DCS Scorecard. defined as the following: > Deepen teacher understanding of key Increased student achievement in _ concepts in content areas. reading/math from data points identified on no ; . DCS Scorecard. > Refine responsive instructional practices.

= Engage in ongoing individual and collaborative reflection on student data (student work, student observation, pre- and post-assessments, interim

assessments) and purposeful planning. -> Embed responsive instructional practices

(strategy groups, conferring, student academic choice, meaningful student/student discourse)

e Establish DCS/PES common staff meeting time and PD time to create collegial support for responsive planning

e Implement intervention cycle structure Intervention cycle document; monitoring of with regular collaboration / student student growth and progress. progress review meetings between interventionists and classroom teachers

3

e Monthly meetings with School Leadership Team to plan PD time.

e Regular meetings with strategists to monitor focus and progress, relative to targeted professional growth goals.

4

To: RSU5 Board of Directors From: Jim Grant, Technology Director Re: Technology Report Date: November 20, 2019

I am pleased to report that after our first year, the RSU5 Technology Department has been working to support the teaching and learning in our schools and we’re looking toward the future. Goal Completion One of the major projects this past year was the installation of new networks at all the elementary schools. That goal has been established and the networks are now faster and more reliable with limited interruption. Customer Service We continue on the goal of creating a department focused on customer service by continuing to work on the following:

e Establishing student help desks with students assisting with support tasks. At FHS, we have moved to the library to create a learning support area. e® Continue to partner with Community Ed to offer tech support times for community members and volunteers will help staff our “Community Cafe”.

e We have further adjusted the tech support schedule in the elementary schools so that a tech can be present at both the beginning and end of the school day three times a week. The change allows for the technician to be present for peak MLTI support times and then be present when teachers are available at the other schools, giving more opportunities to have direct tech support. @ Worked with STEM teachers to collaborate on supporting their program and accompanied them ACTEM where we were able to meet as a group this year. Professional Advocacy We have been active in advocating with our professional associations and state sponsored committees to be on the forefront of decision regarding technology. Data Specialist Paula Roberts has been working with State Data Team as a District representative to insure that the district have a voice in data decisions. She also instructs at Powerschool User Conferences. She and I have worked on student data privacy and protection. Lisa Hogan presented on Habits of Work, a Reflective Practice at ACTEM. ] was fortunate enough to be one of three invited to talk about the future of MLTI with the DOE and supported a “Bridge Year”. Infrastructure / Equipment Progress We've been able to add more chromebooks and iPads in the elementary schools and continue upgrading classroom technology. In terms of infrastructure, we have stabilize and updated server services, assisted with other communication, support and security systems. All application servers are now hosted. We are also working to increase the production quality of Board meetings. MLT12 and Bridge Year The current program will run for another year while DOE decides what the next iteration of MLTI will look like. Most services will be available and we will be able to buyout the devices for $48 per unit. This will give us time to sure up non-MLTI resources and prepare for the next phase of MLTI. I would propose such items as updating elementary staff laptops and front office equipment, With the use of E-rate funds, we should install redundancy systems into our communications systems. We should also explore becoming a self-repair center. Not only could we repair in house, saving time and money, but we could offer the service to surrounding districts. Thank you for the opportunity to address you this evening. I am happy to answer any questions. Sincerely, Jim Grant, Technology Director

RSU 5 Strategic Goal 4: RSU 5 has well developed and refined finance, human resources, facilities, transportation and food service systems to support the learning of all students. OBJ 1: Provide all staff and students with the technology needed to support teaching, learning and support systems. Tech : Provide equipment for staff and student use that meets the current A. Replace obsolete main office desktops and demands of teaching and learning. have a 5 yr replacement plan that anticipates | Aug. 2021 A. Replacement schedule. emerging needs, All schools main offices will : It is important to maintain a level of have up to date terminals. B. Al grade 6-12 students will have technology that allows for speed and Summer 2021 BCCESS TO a VICE. reliability to foster a productive B. Laptops ~ Replace aging MUTI laptops for summer 2022 C. Obsolete devices will be replaced environment. Additionally, if a device is too ana and onooi and more devices added for student antiquated, it acts as a security risk to our C. Chromebook COWs (computers on liane use. systems. More importantly, we must ensure wheels/carts) will be updated as needed. Summer 2023 D. Obsolete iPads will be replaced access fo technology to provide equity in and ongoing and more devices added for student resources to staff and students. D. [-Pad COWs will be updated as needed. wise, . Summer

E. L - Replace aging laptops for faculty. aptops - Rep | 992082024 E. Start replacement of elem. devices.

F. Laptops - Replace aging Chromebooks with Macs for eee Fall 2020 F. Ed techs will have Macs for use. Tech Goal 2: Ensure a secure and robust A. Logical and physical network map. network throughout the District. A. Review existing network and identify any 2019-2020 areas for improvement. B. Create document of the network Winter 2019 traffic rules and scopes. The network provides the backbone of B. Review firewall rules and policies. and ongoing i. technology infrastructure. It provides access ; C. Documentation of components to information sources, applications and the C. Replace aging or obsolete components. Summer 2020 replaced. internet. Not only is high speed broadband D. Ensure redundancy and backuns where and ongoing D. Documentation of steps taken to essential, but we must also ensure that data ‘bl ensure redundancy is secure and threats are reduced. possi. Winter 2019 and ongoing

1

RSU 5 Technology Department Goals 2019-24 OBJ 2: Ensure students are prepared for usage of digital media in a safe, secure and useful manner. Strategic Goal: Develop Digital Citizenship among students and staff by A. Work with K-12 Library Media Specialists in . ; supporting effective and responsible use of promoting digital literacy and citizenship. Ongoing A. Documentation of curriculum — information systems. developed and implemented, using

B. Promote student to student support for ISTE and AASL standards. Ht is important for students and staff to learn appropriate digital citizenship. to be good citizens, practice safety and be B. Development of student tech able to find, assess, and use digital teams that could advise about resources. digital citizenship issues. OBJ 3: Communicate with the community about occurrences and events and promote involvement. Strategic Goal: Increase communication with community stakeholders. Establish a A. Survey users. 2020 district wide Social Media presence A. Survey users including sites such as Facebook and B. Work with stakeholders on how the website 2021 . ; Twitter. and social media can help communicate with . B. Redesigned RSU5 website and the community. Ongoing other social media sites, Information is important and social media . ws info be a powerful communication tool if it C. Creation of Facebook/social media accounts. | Winter 2021 C. Expand on aoe for is used responsibly as a means to deliver the we . 2022 and . mary mem ‘0 Tecelve . D. Increased opportunities for the public to tech support and establish a message of RSU 5 in a consistent and tilize RSU 5 ongoing “Computer Cafe” concept uniform manner to the greater community. uae TESOUTCES. P ° The community should see the schools as a welcoming resource.

2

Then 4.0.

1

FREEPORT HIGH SCHOOL - FALL SEASON RECAP

For the 2™ consecutive fall season, every varsity team qualified for post season play!

Field Hockey Finished season 9-3-2 Defeated Leavitt in Quarter Finals Lost to Fryeburg (2OT’s) in Semi Finals Girls Soccer Finished season 10-3-1

Defeated Lincoln Academy in Quarter Finals

Lost to Cape in Semi Finals Boys Soccer Finished season 8-3-3 Defeated Cape in Quarter Finals (20T’s) Lost to Yarmouth in Semi Finals Football Currently with record of 6-1

Defeated Cape in Quarter Finals (First playoff win in Class C in program history) Lost to Leavitt in Semi Finals WMC Championships 10/18

- Girls finished 2™ — Jane Dawson finished 10°

- Boys finished 4" — Martin Horne finished 4" MPA South Regional Championship — This Saturday 10/29 @ Twin Brook, Cumberland

- Girls finished 4" — Jane Dawson 10", Jillian Wight 11°

- Boys finished 3 Martin Horne 8", Henry Horne 26° MPA State Championship

- Girls finished 5" — Jane Dawson 22", Jillian Wight 23”

- Boys finished 8* — Martin Horne 6", Henry Horne 37" Golf WMC Championship - team finished 3" — qualifying for the Class B State Championship Class B Team State Championship - finished 2% as Class B State Champion Runners Up!

- TJ Whelan 2% & Tom Robinson 8" Class B Individual State Championship

- TJ Whelan 5" Girls Individual State Championship

- Molly Whelan 10" 235 fall participants — current enrollment 582 — 40% participation rate in fall season alone

March 20, 2019

To: RSU 5 Board of Directors

From: Becky Foley, Superintendent

Re: Plan for Repiacing Tennis Courts

The following steps are recommended for maintaining the current tennis courts and ultimately replacing them.

1. Cralg will get three quotes for replacing the current courts with post tension concrete tennis courts.

2. Craig presents to the Board In early fall the pros/cons of post tension versus asphalt courts.

3. Dennis will review the 5 year facilities plan with the Facilities Committee in the fall to determine when next resurfacing should occur. Craig will be Invited to Join the group. Potentially, the resurfacing could be budgeted as early as the FY 21 budget.

4, Once the resurfacing year Is determined, we would add five years to determine the year that we would budget for the replacement of the current courts.

5. Tennis Court Reserve Account will be created.

6. Yearly contribution amount will be recommended to the Board through Finance Committee, !.e. approximately $35,000 for 7 years.

7. Craig will connect with the Tennis Boosters around potential fundralsing opportunities to help defer the tax impact.

| Bip | + G roe 7 AU ia aS | > ~ Fa ‘ Pa ~

"ik ; ~ Rn What is Why Post-Tension? ; Post-Tensl oning? r fice ee oa slabs can be Installed ‘ : right over existing asphalt or clay courts, : ; Post-Tensioning is a method of reinforcing ellminating the need for costly demolition. \juuaneeunnal ne (strengthening) concrete or other materials @ Post-Tensioned slabs are Ideal for New = with high-strength steel strands of bars, Construction on active New England soils. li tana} | typlcally referred to as tendons. Post- ® Post-Tensloned slabs are kept in Tensioning applications Include office and constant compression with steel cables. This tension makes them much apartment bulldings, parking structures, more resistant to soll movements below. slabs-or-ground, bridges, sports stadiums, ® Posi-fensioned slabs resist cracking, heaving, settling. rock and eoli anchors and water tanks. ® Post-Tensioned slabs can be bullt to tighter tolerances for better planarity In many cases, Post-Tensioning allows and pitch. construction that would ' ® Post-Tensioned slabs can be bullt without otherwise be Impossible due | expansion or cut Jolnts. No Joints = Better to elther site constralnts or i= 8 = Play, More Durabllity. architectural requirements. aes Fa ® Post-Tensioned courts “play” the same as ——— ————— : er _* traditional asphalt courts. Although a Post-Tensioned 7" re system requires specialized _ LS = = Benefits of Post-Tensioning knowledge and expertise to fabricate, * ASBA states that “Post-Tensloned concrete slabs are the preferred assemble and Install, the concept ls easy method of concrete court construction.” to explaln. Imagine a serles of wooden * Provides advantages of reducing or eliminating control joints and resisting blocks with holes drilled through them, and controlling cracking as a result of the compression induced into the Into which a rubber band Is threaded. If concrete by the steel pre-stressing tendons. one holds the ends of the rubber band, @ Provides a sturdy, durable playing surface that withstands abuse and is the blocks will sag. Post-Tensloning can less susceptible to the effect of climate (heat, cold, and rain) than asphalt. be demonstrated by placing wing nuts @ When properly designed and constructed, very little care and maintenance on elther end of the rubber band and are needed and has an extended useful life. winding the rubber band so that the ® Provides a non-discoloring surface, has controllable bal! skid length, and blocks are pushed tightly together. If one can recelve many types of playing-surface topping systems. holds the wing nuts after winding, the © In areas where there are expansive clays or soils with low bearing capacity, blocks will remaln stralght. The tightened Post-Tensioned slabs-on-ground and mat foundations reduce problems rubber band Is comparable to a Post- with cracking and differential settlement. Tensloning tendon that has been @ Courts are typically playable soon after a rain storm because of their stretched by hydraullc Jacks and Is held In superlor drainage characteristics. place by wedge-type anchoring devices. ® To ensuré quality construction, the Post-Tensioning Institute has 1 f implemented both a Plant Certificate Program y ; i ' and a Field Personnel Certification Training i i Course. By specifying that the plant and 4 \ ~~ installers be PTI certified, this ensures the al ye level of quality in every project. | mee nene Sas — >. | aie a @ Doesn't require heavy machinery or vi 8 tat seat fe NS byte aS = equipment for existing courts, therefore ae = SS ee ioe your yard Is protected. es i eee es Engineered to last a lifetime.

| | r f t

Post-Te nN S [ O ‘a e fe | Ore) U rts Q: Does the bail play or react different on a concrete COUIT? Answer: Post-Tensioned Concrete hag been around for Frequently Asked Questions almost two decades, although fairly new to the Northeast. The speed of play and consistancy of the hail bounce are constantly tested by the ITF (International Tennis | Federation) and although the speed and bounce will play differently depending on where you live, if you choose the Q: Why should | consider Post-Tensioned concrete? proper contractor, the consistency can be customized to Answer: Back in the early 1950s when J first started your particular needs, buflding courts, asphalt (bituminous concrete as referred to) ; was the surface or choice. For many years, we builtsome Q: How often da | have to recoat my court? of the finest asphalt courts money could buy. However, Answer: Good Question, There are several variables, This over the years, the industry has changed and so has the depends an how much use the court sets and how severe design of asphalt. There is more RAP (Recycled Asphalt out winters get. If you play/use your ae 5-10 times per Products) going into asphalt nowadays and the quality of month and we get fairly mild winters, we senerally see\a the mix design is just not what it was years ago. The main 5.7 year turnaround, We have seen pone, especially clubs reason is the cost of of has tisen so much over the past ‘ecoat after just 2 years. Some poopiegust like that “new 20 years, that the asphalt plants are trying to find ways to look" thus recoat it every few years, We are more than stay competitive and thus they are taking away from its ‘“appy to take a look for you each year, give you aur | quality, It is very difficult to not only find quality asphalt | Su&gestions along with options. , anymore, but it’s just as hard to find consistency like you ‘ ’ could in the &ds ue 90s. Therefore we were forked to look Q: Do you offer Har Tru Courts Of afy other types of . at New Technology and today we believe Post-Tensioned courts other than Pest-Tensioned? ; - Concrate Courts will last a lifetime. When you look at the Answer: Yes, we do just about every type of Tennis Court science, the concept and the design, there is no reason why surface on the market today. From Posts ensioned, Har Tru, a Post-Tensioned Court will not last for many decades. Clay, Grass and our Specialty “All Weather Cushioned”, One thing to consider is that we live in the northeast, we are Q: Will my body hurt or be sore after playingon sucha syeraptiine to wire, rain, cold and snow, gthigae the courts hard court? : that we belleve can withstand these siements the best e ; are Hard Courts like PostJensioned concrete, With other Answer. It is true that concrete is a hard surface, yet extremely SPH URE, Pa OF Nite “1 ; types of courts or surfaces, you have daily, woekly, manthly durable. Over half of our clients choose some sort of a ; ; Tits 5 “4 Fs s and yearly maintenance, so again when considering your Cushioned Surface’ on top of the concrete slab. This offers | : ae : ‘ surface, ask yourself if you want to| deal with all the not onfy ene of the finest court surfaces in the world, butii’s : ; aS ; maintenance of @ surface like Har Tru of Clay, of do you just what many of the top athletes around the world play on. The want to go out and play onan “All Weather Court” surface of the US Open (DecoTurf) is very popular among our ; / I ; clients. jf you desire even more cushion for added benefits, Q: Can 1 Use a Post-Tensioned Court for more than just | we offer Cushion Extreme, which can be customized to 1/8" tennis? of cushion to 52". Belleve me If you go play on one of our —Anewer- Almost every court we build today is Multi-Sport. | cushioned courts, you would never even know that it was Yes, you can enjoy Tennis, Basketball) Pichelball, Voliey- put on concrete. ball, Roller Biading and even freeze your court in the winter. | Ask us about Nice Rink! Q: What makes a Post-Tensioned slab resist cracking? . Answer: Post-Tensianed concrete courts are bullt by creating Q: Why should choase Hinding Tennis aver someone else? | | an engineered grid of polyethylene sheathed steel cables within Answer: This is your choice. At Hinding we feel as though we the concrete slab, After the concrete has reached sufficient are the best in the business. Asa sa of the American Strength, the cables are tightened and held permanently Sports Bullifers Association and the Tennk=iIndustry Magazine's under stress putting the concrete into compression, Bocause first recipient of the “Contractor of the ¥ lar for 10 and Undér theconcreteisconstantlyincompression, thesiabisextremely Tennis” (2011) for the entire industry, m} reputation speaks rigid, and cracking is therefore kept toa minimum. This type for itseif. With clients like the Intemational Tennis ‘Hall of | of reinforcement is considered “Active Reinforcement.” Fame, Chelsea Piers- Stamford, CT, The Cdast Guard Academy, Conventional methods of placing concrete utilizing rebar The Davis Cup, NY City Parks and Recreation and many, many and wire mesh are considered “inactive reinforcement.” The others. Our reputation means more than just a name tow concrete would actually have to crack before the rebar particular project, it's also the iheting of enjoyment we of mesh started reinforcing the concrete. Any hairline are building for you. We stand proud af every project, aur cracks that may develop before the concrete is put into successes in the fieid, and our entire Hinding team whose compression will close due to the extreme stressing forces efforts and workmanship are unmatched. When consideriig) | put on each cable. With Post-Tensioned concrete we are your new project, we expect you to have many contractors actively reinforcing the concrete from day one resulting in and options to choose from. However, we know Hinding the most crack free court there is. Tennis is the right choice. | j

Asphalt vp. Post-Tensioned Concrete Tennis Courts - Gale Associates https://www.galeassociates.org/site/comparing-tennis-court-materials/

‘GALE s Asphalt vs. Post-Tensioned Concrete Tennis Courts

Asphalt tennis courts may be the most commonly constructed hard-surfaced courts in the industry today. However, due to inconsistencies with the quality of asphalt in f recent years, there is an increased interest in post-tensioned concrete courts. When v considering the construction of a tennis facility, it is important to understand the basic differences between asphalt and post-tensioned concrete courts. Asphalt Tennis Courts:

® Installation typically includes two courses of asphalt (wearing and binder) over a crushed stone base. The depth of the pavement system is based on recommendations resulting from a geotechnical investigation/report.

® Bituminous (asphalt) pavement is flexible and tends to be more affected by freeze/thaw cycles. Over time and under exposure to the elements, this often leads to surface and/or structural cracks.

® The design mix has an impact on the pavements lifespan. It may be beneficial to avoid incorporating recycled asphalt shingles and recycled asphalt pavement into the asphalt mix. The performance grade of the asphalt binder used in the design mix should be specifically tailored to the climate / environmental conditions of the proposed project's geographic location. # Asphalt paving may be more economical to install; however, there are higher maintenance costs throughout the life of the court due to repairing cracks and related re-application of the tennis surfacing system.

. : "ie - rs A . 5 ! Eat nn ty oy +B Ee ha lof4 3/21/19, 9:42 AM

Asphalt vs. Post-Tensioned Concrete Tennis Courts - Gale Associates https://www.galeassociates .org/site/comparing-tennis-court-materials/ Asphalt Paving Operations

Post-Tensioned Concrete Tennis Courts:

# Post-tensioned (PT) concrete construction involves installation of a structural concrete slab over a prepared base. The concrete Is reinforced with cables tensioned after the concrete is installed. The design of the pavement system is f based on recommendations from a geotechnical Investigation/report, as well as w design recommendations from a registered structural engineer.

® PT construction is a rigid pavement system, and when properly installed, has a greater resistance to cracking. Cracks that may occur are typically hairline rather than the more significant cracks commonly seen in asphalt courts.

* During design, it is important to take into consideration a clear space around the perimeter of the courts to allow for the tensioning of the cables.

® PT construct is more expensive to install than asphalt; however, lower maintenance costs over the life of the court are typically experienced. Post- tensioned courts do not require the extent of crack repairing (and related tennis system resurfacing) typically associated with asphalt courts.

© PT systems have longer service life than asphalt courts.

er ae ——= ——ais ——- pr = 2 ‘ ~~ 5 = ae satel ear

CableLayoutPriortoCancrete Installation -»-sSSCs(Complatad Post:Tensloned Courts

Budgetary constraints are often a primary factor in selecting either asphalt or post- 2of4 3/21/19, 9:42 AM

Asphalt vs. Post-Tensioned Concrete Tennis Courts - Gale Associates https://www.galeassociates.org/site/comparing-tennis-court-materials/ tensioned concrete. While asphalt systems have a lower initial cost, higher “] maintenance costs and an overall shorter lifespan is expected. Post-tensioned courts are significantly more expensive to install; however, they require less maintenance over the life of the court, and have a longer overall life expectancy.

Projects Academics Airports f p Athletic and Recreational

x9!

College/University Commercial Department of Defense Heaith Care Historic Buildings Residential/Mixed Use Municipal/Government Subscribe to Gale Blog

Subscribe to get updates!

Name E-Mail Subscribe Massachusetts New Hampshire iof4 3/21/19, 9:42 AM

re ee

28 Commerce ParkRd POBox1100 Pocasset, MA 02559 (508) 759-5636 FAX (508) 563-7915 Craig,

Thank you for the opportunity to provide a proposal for the reconstruction of the courts at Freeport High School. As J mentioned during our conversation Cape and Island Tennis & Track decided a few of years ago to move away from asphalt construction due to the widespread early failure that has been occurring across the northeast and the rest of the country in the form of small stripping cracks that are showing up in the top course within the first couple of years. I have attached a photo to illustrate the effect we are seeing. The cause of this is that the asphaltic cement that holds together the stone in asphalt paving is weaker than it used to be due to changes in the refining process and it is drying out more quickly, resulting in cracking where it used to flex. These cracks will open over time and cause a degradation of the courts surface that is almost impossible to rectify.

With that said, I did run the costs out in asphalt to give perspective between the two construction methods. When reviewing the cost/value comparison of the asphalt versus post tensioned concrete options for the courts on the following page, you will see that the approach is to show the associated repair and maintenance costs of the tennis facility over the next 30 years.

Although the model cannot be an exact prediction, it does illustrate the long-term results of each option. There have been a few assumptions that have been made for the sake of discussion and all future pricing is based on today’s dollars with an annual 3% Cost per Living Index increase. All pricing is based on today’s reconstruction costs in the existing footprint. Please note that this estimate is based on ideal asphalt, not the material that is readily available today.

Asphalt Construction - To rebuild the 3 courts in asphalt today including the site work the fencing, the price would be roughly $156,000.00. The model assumes repainting the courts every 7 years, performing crack repair over the 4 courts and painting in year 12 and replacement in year 20. Again, this very optimistic. Post-Tensioned Concrete Construction -- The initial cost of concrete courts is higher at $226,720.00 but the benefit is that you do not have the crack repair and reconstruction costs down the road. The schedule shows repainting the courts every 7 years. The first concrete courts that we built were in 1989 at Rogers High School in Newport RI and they look almost new after being repainted 25 years later. This is the best way to build a tennis court and the money you spend in initial cost is well worth the money you save in the long run. Our model shows the town saving over $197,000,00 building them right the first time. Again, this can’t be an exact prediction of the future, but I hope this helps.

You will see that I have quoted the job through the NCPA cooperative purchasing contract which in many places in Maine allow a municipality to purchase construction through pre-bid prices and without the risk of having a unvetted contractor win a job that they may not be qualified for. Our firm bids this work every 5 years in unit prices so that you always know that you are getting a top- quality firm at a competitive price. I am attaching a brochure about the program but feel free to give me a call with any questions.

Best Regards,

Eric Loftus

Vice President

Cape and Island Tennis & Track

28 Commerce Park Rd

Pocasset MA 02559

508 759 5635

Cost Comparison of Post Tensioned Concrete Vs. Asphalt Freeport High School Number of Courts | 3 Cost of Crack Repalr per liner foot Total Facility Cracks Year 14 450 Number of Yards L 2080 Cost of Resurfacing per square yard Asphalt Maintenance Resurfeca Yaar? Pest Tensioned Maintenance Regurface Year 7, 14, 21, 28 Crack Repalr end Resurfece Yeer 14 (+/- 150" of crack repalr per court) Rabulld Year 20 Resurface New Courts Year 27 Future am Based on Today's Actual Costs with an annum 3% Cost of wate Index Increase PostTansianed Asphalt - -—_80Year Tennis Faclity Costs intial Cost $400,000 Your i i $500,000 |

2

5

6

7 $20,465 $20,465 i] 3 $00,000

10

11

Lu 3 i 4 $25,168 $40,825 feos

15

16

7

18 $20,000

18

20 $281,758 21 $80,955

22

23 100,000

24

3

26

27 $56,962 2 $38,071 Fe ul a Post Tensloned Asphalt

Total $938,177 $536,005 Life Cycle Savines Of Post Tensioned Concrete $197,828.49 Maintenance Costs $114,661 $380,005

28Commerce ParkRd POBox1100 Pocasset, MA 02559 (508) 759-5636 FAX (508) 563-7915 July 23, 2018 Project: Freeport High School Tennis Courts, Freeport ME Cape and Island Tennis & Track is offering the following quote: Tennis Facility Reconstruction (2080 SY)

1. Pulverization of existing courts, disposal of fence, tennis equipment, bring in additional stone to augment base

2. 4%” Post Tensioned Slab with 4 Coat Plexipave System including Ti Coat concrete bonding agent, tennis net posts, nets, and center straps

3. Surface courts with 4 part Plexipave System including concrete preparer NCPA Co-Op Price: $90.21 per square yard or $187,636.00 Additional work not covered under above price: 1, Tennis Fencing — 1 %” black vinyl 9 gauge at 10’ with gates — $35,880.00

2. Drainage outside the court — TBD depending on scope a Tennis Project Total: $223,516.00 Authorized Signature: eS \ ——— Date: 7/23/18 Eric Loftus, Tennis Division “—__—~ re Fosesees : 28Commerce ParkRd POBox1100 Pocasset, MA 02559 (508) 759-5636 FAX (508) 563-7915 Post Tensioned Concrete Construction Warranty Date: xx/xx/xx We, the undersigned warrant the post tensioned tennis courts installed by Cape & Island & Tennis & Track at ____ located in ; against structural cracking for a period not to exceed twenty five years from the date of completion. It is hereby stated that all work shall be completed exactly as specified in a workman like manner according to standard practices. This warranty specifically disclaims damage from hair line cracking, vandalism, non-athletic uses, acts of God, sub base, and base failure and normal wear and tear. Structural cracks will be determined as at least 4’ long and 14’ wide through the slab. This warranty is for the post tensioned concrete slab and does not extend to the tennis fencing, net posts, nets, or surfacing. Cape & Island Tennis & Track reserves the right to choose the method of repair. Please note that resurfacing is recommended every 5-7. This type of resurfacing is classified as “normal wear and tear”. Company: Cape & Island Corp.

Address: 28 Commerce Park Road P.O. Box 1100 Pocasset, MA 02559 Phone: (508) 759-5636 | Seal By: Gordon Pierce Title: President

State of: Massachusetts County of: Barnstable Subscribed and sworn to before me this day of 20 Notary Public: My Comission Expires:

Regional School Unit No.5 Mail - New Tennis Courts https://mail.google.com/mail/w/07ik=a807b52530&view=pt&sear...

(5) Cralg Sickels <elckelec@rsu5.org> New Tennis Courts (, Tom Hinding <tom@hindingtennis.com> Wed, Oct 9, 2019 at 1:29 PM

Te: Craig Sickels <sickelsc@rseu5.org>

Ce: info@hindingtennis.com Budget $75,000 per court with new fence For post tension courts Thomas Hinding Hinding Tennis

24 Spring St.

West Haven, CT. 06516 — 203-410-6090-Cell —. —_ 203-285-3055-Offica | 7) O60 X 4 203-285-3033-Fax ‘ www. hindingtennis.com ~

877-5-Riteway- Riteway Tennis Products HK aA 5 DoD www.ritewaytennis.com , Member American Sports Builders Association RiteWay Crack Repair Licensed Installers

0 \Asac tes TP Coca PANY d dag ace b "YD, , | Oh Oct 9, 2019, at 1:27 PM, Craig Sickels <sickelsc@rsu5.org> wrote: | [Quoted text hidden] lof 1 10/9/19, 1:31 PM

| fa Maine Tenni | ee — OPOSAL

AAW WI

(ene! HANA RINARINA “VA! ARAMA AYILIAAAN IAAI AF AW WA WAY WA AAA A?

TO PHONE DATE

Freeport High School : 865-4706 x228 | 12/17/2018

30 Holbrook St. SORES ECATION Freeport, ME 04032 Freeport High School C/O Craig Sickels CAA sickelsc@rsu5.org

JOB NUMBER | JO8 PHONE

We hereby submit specifications and estimates for: Budget/Scope Tennis Court Reconstruction Approx. 120'x156' Maine Tennis and Track would perform or manage a subcontractor to perform the following: -Prune trees and remove shrubs, as needed, along east edge of courts for access.

- Remove and dispose of the existing chain link fence, net posts/sleeves, and center tie down anchors.

- Backfill the open fence/sleeve holes with gravel and compact.

- Reclaim/Pulverize the asphalt.

- Compact the gravel base.

- Fine grade the gravel base to achieve a 1% slope. Add additional leveling materials as needed.

- Pave 2.5” of asphalt.

- Furnish and install a black vinyl chain link fence on a black vinyl frame with three 4° pedestrian gates.

- Furnish and install the Nova Sports USA Novacrylic Combination Surface (www.novasports.com), per the manufacturers specifications (color/s to be determined).

- Install three sets of 2” tennis playing lines.

- Furnish and install three sets of black Douglas Premier net posts and three Douglas TN36T tennis nets with center straps (douglas-sports.com).

BUDGET ESTIMATE: $135,000.00

BUDGET dollars (8 135,000.00 All ee Mf DAMEN i Se ae FORCE. AK More fe) De COTES mB wore anihE PTE z. -ADAMANCANT ene yee gps SP ee | EEEELED EECA 266466 Ire adore pncen, opsaticntons 2 orci con@iers are ametectoy and are hereby wecegmed. You arn aulterizvec = Lee | to Gn the work a8 spected, Peyrtrent will be mace as ovilined atova ieietensen | ~\ Daid'ét Accepted = - {r sarecuann. Leven Ua at wWwisreemry

5

AMERICAN , SPORTS BUILDERS ASSOCIATION

.

Asphalt Impurities Tn some parts of the country, the crushed stone or sand ageregate used in asphalt may contain clay balls, wood bits, or other forms of contamination. It is impossible to obtain a guarantee from an asphalt producer or supplier against the presence of this material, particulerly if their source has ¢ history of such inclusions. Also, since a producer’s source of aggregate may vary from time to time, it ia impossible to predict whether a particular batch of asphalt from # producer wil! contain deleterious materials or to rely on the fact that the asphalt from a given producer or supplier has not contained these materials in the past. Therefore, this condition is beyond the control of the contractor and the contractor cannot assume responsibility. In areas where this occurs, it will affect all contractors equally. If contaminated materials are present, over time, they may degrade, forming carbon dioxide and/or methane gas, creating bubbles in the surface coating or pitting in the surface. In most cases, these problems are minor and can be Occasionally, in severe cases, an asphalt overlay, using aggregates from a different source, or a change of surface to a textile, moduler or roll goods surface, will be requited to permanently correct this problem. Differencas in site, weather and soil conditions require variations in construction and repair methods and materials. Readers are advised to consult a qualified contractor or design professional before undertaking construction or repair of a court. Rev. 03/04 f/ SPORTS BUILDERS meabenasyl -ASSOCEATION

e Pad Asphalt Acceptance — Recreational Courts In the event that the surfacing contractor is not the asphalt contractor or the general contractor, it is the responsibility of the asphalt contractor and/or the general contractor to supply a base that meets the specifications of the designer and the rules of the sport. It is far more difficult and costly to wait until the surface has been installed to identify issues with slope, planarity, elevation or drainage. Additionally, unless the surfacing contractor is also responsible for the paving, it is inappropriate to hold that contractor responsible for such issues if the pavement has not been tested and corrected prior to surfacing. Therefore, it is highly recommended that projects include testing to demonstrate and/or corrective work to achieve compliance at the cost of the asphalt contractor or general contractor. Testing should be completed prior to the installation of court surfacing. An independent testing firm should check the dimensions, slopes and tolerances of the asphalt pavement. Results confirming compliance should be submitted to the surfacing contractor prior to mobilization. If the initial assessment shows non-compliance, the necessary corrective work should be executed and the pavement retested prior to the commencement of surfacing.

« The asphalt mix design should be approved by the design professional and by the asphalt contractor. Tests that verify that the mix as installed meets the approved design should be provided. s The installed pavement must be at the correct elevation at all edges. Incorrect areas should be repaired or re-installed to correct elevations. s All bond breakers such as oil, hydraulic fluid, and gasoline must be removed. s = The asphalt should be flooded to check for low areas, high areas and surface drainage. Out of tolerance areas should be repaired or re-installed. Corrective work should be sccomplished using appropriate methods, such as:

® For high spots oO grinding o heating and rolling

® For low spots o hiring the surfacing contractor to apply an appropriate leveling compound (only where depth of low spot is less than 14”, or as specified) o milling and asphalt patching o removing and replacing o asphalt overlay, possibly in conjunction with one or more of the repairs above. Because of the relatively rigid specifications and tolerances for asphalt pavements intended for temmis court installations, it is recommended that only asphalt paving contractors with prior court building experience be considered. Wherever possible they should heve installed a minimum of ten tennis courts that meet the approved tolerances within the past three years. Differences tn site, weather and soil conditions require variations in construction and repair methods and materials. Readars are advised to consult a qualified contractor or design professional before undertaking construction or repair of a track. Rev. LI/10

, AMERICAN SPORTS BUILDERS ASSOCIATION

Birdbaths

“Birdbath” is a term commonly used in the tennis industry to describe a low area on a tennis court that holds water. More precisely, the American Sports Builders Association (ASBA) defines a birdbath as any area where standing water more than 1/16” (2mm) (commonly measured using 2 nickel) remains after drainage of the area has ceased or after one hour of drying at 70 degrees Fahrenheit in sunlight. Birdbaths delay play on the court after rain and may cause staining and/or peeling of the surface. Among the causes of birdbaths are:

1. Unsuitable material in the subsoil;

2. Inadequate drainage around the tennis court;

3. Improper slope or grade;

4. Inadequate compaction of the subgrade; or

3. Paving ettor. Paving and surfacing, even with laser-guided equipment, involves both skill and judgment. The number of variables impacting the paving and surfacing processes makes it unreasonable to expect perfection. Minor depressions in the surface, those less than 1/16” deep or those that drain or dry in under an hour, are considered within tolerance and are acceptable. In a new or recently resurfaced court, however, the contractor should correct birdbaths, Because site selection, design and construction can involve compromise, over time, even properly designed and constructed courts may develop birdbaths over time. During design and construction, a proper balance must be struck between the risk of some problems over the long term versus the cost of extensive remediation prior to construction. Tennis courts sometimes ere built on sites which are reclaimed or which heve been deemed unsuitable for other purposes. In such cases, less than ideal subsoil, grade or drainage conditions may exist. Additionally, over time, new circumstances may arise which lead to settling or drainage problems, The owner's expectations regarding repair of birdbaths should be based on the nature of the birdbaths that exist to be repaired and the amount of money budgeted for the repair. For example, the owner should understand that birdbaths created by improper compaction or unsuitable materials may reappear later due to further settlement, while repairs to birdbaths caused by improper slope or grade may only move the water to a different area on the coutt. Owners also should understand that available repair methods and materials are imperfect. Asphalt resurfecers and acrylic patch binders are water-based materials. After they are installed flush with the surface, they may shrink due to dehydration, allowing the area to once again hold water. Asphalt patches and acrylic repairs require time and proper weather conditions to cure. Further, patching materials can be installed only to an effective depth of approximately 4”. For these reasons, even a skilled contractor may make several site trips to “fine tune” a repair. Complete removal of standing water may be impossible. Generally, the owner should accept that repair of birdbeths is only a means of reducing the inconvenience they cause and extending the useful life of the court. The number, size and depth of birdbaths is another consideration. The existence of multiple birdbeths or major depressions of 4” or more may indicate more serious problems. Repairing multiple or deeper birdbaths is labor intensive and often results in cosmetic imperfections, which may require resurfacing to correct. The larger the birdbath, the more difficult it can be to repair. Prior to repairing numerous birdbaths or major depressions, the owner should discuss the cost and alternatives, such as installing an overlay. In some cases, only reconstruction will provide a long-term solution. Differences in site, weather and soil conditions require variations in construction and repair methods and materials, Readers are advised to consult a qualified contractor or design prafessional before undertaking construcHon or repair of a court. Rev. 11/10 yaa

/ SPORTS BUILDERS

“/ ASSOCIATION

3

& Birdbaths on Older Courts “Birdbath” is a term commonly used in the tennis industry to desctibe a low atea on a tennis court that holds water. More precisely, the American Sports Builders Association (ASBA) defines a birdbath as any area whete standing water more than 1/16” (2mm) (commonly measured using a nickel) remains after drainage of the atea has ceased or after one hour of drying at 70 degrees Fahrenheit in sunlight, Birdbaths delay play on the court after rain and may cause staining and/or peeling of the surface. Minor depressions in the surface, those less than 1/16” deep or those that drain or dry in under an hour, are considered within tolerance and are acceptable. Over time, even properly designed and constructed courts may develop birdbaths. The owner’s expectations regerding repair of birdbaths should be based on the nature of the birdbaths that exist to be repaired and the amount of money budgeted for the repair. For example, the owner should understand that birdbaths may reappear later due 10 further settlement or the water may be moved to a different atea of the court. Owners also should understand that available repair methods and materials are imperfect. Aspheilt resurfacers and acrylic patch binders are water-based materials. After they are installed flush with the surface, they may shrink due to dehydration, allowing the area to once again hold water. Asphalt patches and acrylic repairs require time and proper weather conditions to cure. Purther, patching materials can be installed only to an effective depth of approximately 44”. For these reasons, even a skilled contractor may make several site trips to “fine tune” a repair. Complete removal of standing water may be impossible. The number, size and depth of birdbaths is another consideration. The existence of multiple birdbaths or major depressions of 4" or more may indicate more serious problems, Repairing multiple or deeper birdbaths is labor intensive and often results in cosmetic imperfections, which may require resurfacing to correct. The larger the birdbath, the more difficult it can be to repair. Prior to repairing numerous birdbaths or major depressions, the owner should discuss the cost and alternatives, such as installing an overlay. In some cases, only reconstruction will provide a long-term solution. Differences in site, weather and soil conditions require variations in construction and rapair methods and materials. Readers are advised to consult a qualified contractor or design professional before undertaking construction or repair of a court. Rev. 11/10 |

AMERICAN

a ASSOCIATION ° ad Cracking of Asphalt Tennis Courts

The most common problem with asphalt tennis courts is pavement cracking. Cracking in asphalt is caused, at least in part, by the natural tendency of asphalt to shrink as it weathers, oxidizes and ages. In addition, asphalt loses its flexibility as it ages, making it more brittle. Since shrinking and becoming more brittle with age are properties of the material, cracking in asphalt tennis courts is inevitable. Quality design and construction can minimize or delay cracking but cannot eliminate it. Once cracking begins, no matter which method is used for the potential exists for cracks to reappear. There are many types of asphalt cracks. Surface cracks include hairline cracks (small irregular cracks present over large areas of the court), alligator cracks (a pattern of interlocking cracks over the surface resembling an alligator hide) and shrinkage cracks (a randorn pattern of interconnected cracks with irregular angles and sharp comers). In most cases, surface cracks do not affect the play of the game; however, if untreated, they will develop into more serious cracks and will require more extensive repair. Pavement cracks include heat checking (a hairline crack pattern which follows the direction of rolling), structural cracks (large cracks which penetrate the asphalt pavement), reflection cracks (which occur in asphalt surface overlays and mirror a crack pattern in the pavement underneath), radial cracks (which appear at the point where the concrete net post, light pole or fence post footings meet the asphalt court surface) and settlement cracks (which result from paving over a poorly compacted or poorly drained subbase). There are at least four methods of crack repair — crack filler, infrared patching, proprietary fabric repair system and full depth repair with either crack filler or hot mix asphalt, Repairing many cracks may leave the court with an unattractive, freckled appearance; however, resurfacing will correct this unsightly condition. Because there are various causes of cracking, differences in sizes and numbers of cracks, and various options for crack repair, an owner would be wise to consult an experienced contractor or design professional to determine the best options for repair. It is important to note, however, that eventually cracks will reappeer or new cracks will form. All methods of repair will provide some additional life for the court and some methods will extend the useful life of the court by many years, but if the owner is seeking a long term solution, the court should bs reconstructed. Differences in site, weather and soli conditions require variations in construction and repair mathods and materials, Readers are advised to consuls a qualified coniracior or design professional before undartaking construction or repair of a court. Rev.tifl0

| RSUS Athletics — High School and Middle School Goal1: Provide guidance and supervision regarding the organization, design and implementation of a sys- tematic and sequential progression and program of philosophy, terminology, drills, skills teaching and appli- cations within each athletic program.

RESOURCES PERSON COMPLETION PROGRESS ACTION STRATEGIES NEEDED RESPONSIBLE DATE INDICATORS

What specific actions will be taken to achieve the What financial & hu- Who will oversee the Estimated date for What is the evidence we goal? Renee erin a completion of this completion of this would accept that this o this work? | piece of the work? | action step. action has successfully been completed? | a) Meet with sub-varsity and middle school coaches Time Athletic Yearly and Part of varsity (pre, during & posit). Administrator Seasonal review | coach’s evaluation rocess

b) Develop a working relationship with coaches condu- Varsity Coaches |No completion P cive to the development and maintenance of date - ongoin specific programs. BONS

c) Work with coaches to organize, design and imple- ment a systematic and sequential progression and pro- . gram of philosophy, terminology, drilis, skills teaching Assisted by: and applications. Director of

d) Develop and maintain an open and clearly defined Community | communications system with coaches and athletes. Programs

e) Develop a working relationship with RSU5 Recreation * & Community Education staff and other local youth or- Community | ganizations in regard to the implementation, organiza- Reena tion and maintenance of related youthfeeder programs. Coordinator f} Maintain general supervision of the above areas with the intent being to insure the success, development and maintenance of athletic programs. | oO

RSUS5 Athletics — High School and Middle School : Goal 2: Explore extra-curricular choices that respond to students’ interests and needs. J :

RESOURCES | PERSON COMPLETION PROGRESS ACTION STRATEGIES NEEDED | RESPONSIBLE DATE INDICATORS

What specific actions will be taken to achieve the What financial & | Who will oversee the | Estimated date for What is the evidence we goal? human resources are | completion ofthis | completion of this would accept that this ac- needed to do this piece of the work? | action step. tion has successfully been work? completed? | Review all current RSU5 extra-curricular | Staff time Athletic Began 2004-2005 | Observations of new offerings. Administrator programs Financial Yearly review Explore and evaluate possible new options for | resources to Middle School Sufficient student additional program components. support new Asst AD’s Budget Phasein _| participation and programs (staff, Plan began 2010- _| interest to maintain Develop and recommend a plan to the Super- | equipment, 2011 & yearly re- | programs intendent to add extracurricular choices. space.) view Sufficient RSU5 Implement recommendations per details in the No completion funding to maintain plan. date - ongoing programs Evaluate and adjust as necessary. New programs added

since 2004 HS | - football

- indoor track

- outdoor track

- girls ice hockey

- boys 8 ice hockey

- fall cheering

- winter cheering FMS & DCS FMS

football volleyball intramurals cheering indoor track outdoor track ””

RSUS Athletics — High School and Middle School F oyons : Goal3: Ensure that all student athletes have quality facilities to meet their needs. | | | RESOURCES | PERSON | COMPLETION | PROGRESS ACTION STRATEGIES NEEDED RESPONSIBLE DATE INDICATORS : ° . : What financial & hu- | Who will oversee the | Estimated date for What is the evidence we wae pot SCE Ae man resources are need- | completion of this | completion of this would accept that this Be ed to do this work? piece of the work? | action step. action has successfully | been completed? | | | A Review the existing Capital Improvement _| Staff time Superintendent | A December 2019 | A Written documen- Plan (CIP). tation of existing Costs associated Director of Capital Improve- B Explore options for athletic facilities with recommenda-_| Transportation B May 2021 ments Plan along | expansions } renovations. tions and Facilities with the review and prioritization of ad- C Make recommendations to Board. Athletic C December 2021 | justments and addi- Administrator tional facility needs D Implement recommended improvements. D May 2022

B Written documentation of options

tennis courts (post-tension vs asphalt) recommendations

baseball scoreboard softball scoreboard D Reports to School softball outfield fence _ Board about

track & turf storage building — siding improvements MS reconfigure FMS fields - eliminate use overlap FMS baseball infield FMS outdoor basketball courts - resurface a “a ye : j freemen : . - — - i As <§ : / oS . ij. . ee -_ ot

< ae F f J ' = oe . ~ <2 [ fe as , ‘ 9 Sm 4 7 / lz AN > 5 Se i. se Ta a f } \ re Y wf s : y Avs f y, es 4 7 SEA ZA Lat he 7 NA a oh my —> “oo — =, wa " eA TN ee —— —- = + ie

f 5 ; c “~ ; . : : y 2 > § \\ \ \. ' . j , x FREEPORT MIDDLE SCHOOL - CONCEPT B M., a L¥ it 19 KENDALL LANE tai. UU ' FREEPORT, MAINE MARCH 10, 2009 i a Ten 7.D.

SUS [General Budget Report |_—0/3afzoio|_ | SC sfzoagzoz | ss ee Ee ee eee eee [Artide# |" Description | 2019-2020 | | Revised | Expenses_| Encumb | Balances | %_— Artie 1 |SupportStaff_ | $_3,567,564.00|$ _—- «(| $_3,567,564.00|$ 880,364.86 |$ 57,684.18 |$ 2,629,514.96| __73.71%| a Se a ee ee eee [Article 2__|School Administration _—|$_1,617,920.00|$ __—-_‘|$_1,617,920.00|$__529,622.14|$ __ 2,604.09 |$ _1,085,693.77 |_ 67.10% a QO HO CO (EC (I article 3 [Operation of Plant__— | $_4,819,999.00|$ _—-_—(| $_4,819,999.00| § _2,046,160.70 | $ 623,135.57 |$ _2,150,702.73 | __44.62%6| a GC (OO CO Artie 4 |Voc.E.Assessment_ | $_—99,49.00|$ ss - (| $ 99,419.00 |$ _33,139.60|$ _66,279.25|$ 0.15 | _—0.00% a _ _____w__t___d fArticle5 [School Nutrition/Crossing | $ _269,645.00|$ ___—-_—*(|$ __269,645.00|$ _89,415.00|$ _178,830.00|$ 1,400.00| _—0.52% (2 (OG a (YS (OO ( JArtide6 |instructionk-12 | $ 14,218,224.00|$ -_| $ 14,218,224.00|$ 2,914,658.95 |$ 46,796.63 | $ 11,256,768.42| _79.17%| a ry es er a ee, ee ee eee jartide7 |Co-Curr.& Athletics | $_—829,237.00/$ _—s-_'| $__829,237.00|$ 181,080.79|$ 3,743.19 |5 644,413.02 | _77.71% a (OO (

Article 8 [District Adminitstration _|$_950,098.00/$ _—-_(|$__950,098.00|$ 283,843.78 |$ __(8,263.53)|$ 674,517.75 | __ 70.99% a re ee es ee. ee ee eee jArticle9 [Transportation Services | $_1,533,555.00|$ (| $_1,533,555.00|$ 593,508.05 |$ 316,676.58 |$ 623,370.37 | _40.65% dt

Article 10 [Debt Services | $_1,582,756.00|$ -_—‘| $_1,581,756.00|$ _132,97460|$ __—s-_—*(|'$1,448,781.40| 91.59% a (S(O C(O CO ‘Article 11 |Special Education Services| $ _4,592,878.00|$ __—-_—*(|'$ _4,592,878.00|$ 864,771.19 |$ __(3,144.63)|$ _3,731,25144| 81.24% a NS SOS | SASS | eee | peteeeeees eee, eee See | frotais «| $ 34,080,295.00/$ _—-_| $ 34,080,295.00 | $ 8,549,539.66 | $ 1,284,341.33 | $ 2424641401 | 71.14%

11/20/2019

0. ‘oy

rSsu Durham » Freeport » Pownal Finance Subcommittee Report Date: November 14, 2019 Committee: Finance Committee Chair: Kate Brown

In attendance: Kate Brown, Michelle Ritcheson, Jeremy Clough, Michelle Lickteig, Becky Foley

Meeting Date: November 13, 2019 Agenda Items and Discussion: Audit Update:

1. Committee spent time discussing the most recent draft audit and an assessment adjustment that is needed.

2. Committee agreed to have the auditor come to the November 20 finance meeting to present draft audit. Work on information requested by the School board in reference to the Cost Sharing Recommendation: The Committee spent remainder of the time discussing how to move forward with the cost sharing discussion. Decided to focus the discussion at the next Board meeting on the concepts of fairness.

a. What is fair? What are the indicators.

b. What is a reasonable margin, i.e. level of difference that we can tolerate.

c. Once fairness is defined by the Board, the committee will create alternative solutions to present to the Board at a future date. Submitted by: Becky Foley, Superintendent Regional School Unit No. & 1? West St., Freeport, ME 04032 Telephone: 865-0828x5 H-mail: memanusgé@rsuBb.org

PterAi0,C,

TSU Durham ° Freeport » Pownal Policy Subcommittee Report Committee: Policy Meeting date: November 1, 2019 Chair: Candy deCsipkes

Committee Members in attendance: Candy deCsipkes, Maddy Vertenten, Kate Brown, Cynthia

Alexander Guests: Becky Foley, Peter Wagner Review/Revise Poilcies:

The following policies were reviewed with no changes recommended. KF - Community Use of School Facilities BBAA - Board of Directors Member Authority and Responsibilities BBBDA - Board of Directors Declared Vacancy Caused by Absenteeism BBBE - Unexpired Term Fulfillment/Vacancies The following policy was revised and will be brought to the Board for 1st read on November 20, 2019. BBAB - RSU No. 5 Board of Directors Self Evaluation The following policy was revised and will be brought back to the Policy Committee at a later date. BBA Board of Directors Powers and Responsibilities BB School Board Legal Status The next meeting will be held on December 6, 2019 at 8:30 a.m. Submitted by: Cynthia Alexander

Memorandum To: RSU5 Board of Directors and Superintendent Dr. Becky Foley From: Policy Committee and Cynthia Alexander, Asst. Superintendent Date: November 20, 2019 Re: KF Community Use of School Facilities On November 1, 2019, the Policy Committee reviewed policy KF Community Use of School Eacilitias at the request of the Superintendent. This policy was last revised on January 10, 2018. The Committee specifically focused on section I(f} which states: Community adults and children are free to use outdoor grounds and facilities outside the school day for recreational purposes whenever the spaces are not otherwise scheduled. However, formal approval of buildings and grounds use will only be granted to recognized organizations and groups. The Commitiee’s decision was to make no revisions to this section and considered the foilowing:

® Safety - When any of our buildings are open for community use, there is open access to the entire building and not just the utilized space, creating challenges on how to keep the buildings secure. # Community Groups- The focus of the policy on community use is for organized groups and not individuals.

® Unwieldy - If the policy changed, this precedent would likely become overwhelming and unmanageable due to the volume of individuals that would request RSU facilities and be in competition with the community groups.

« Resources - Community Programs and custodial teams have finite staffing and administrative resources. Cynthia Alexander, Assistant Superintendent

NEPN/NSBA Code: KF

COMMUNITY USE OF SCHOOL FACILITIES

DEFINITION: “Schooi Facilities” are buildings and grounds, parking lots, playing fields and fixed or movable equipment. It is the Board of Director’s desire that the local taxpayers should be able to obtain maximum use of the facilities, to the extent consistent with the primary educational function of the school. It is intended that community uses for educational, recreational, social, civic, philanthropic and like purposes be approved by the administration, in accordance with this policy, the regulations, and the fee schedule. The Superintendent is responsible for developing administrative procedures which provide for the following: timely applications, uses which do not interfere with educational or extracurricular programs of the public school students, preference to local, not-for-profit organizations, and the acceptance of appropriate responsibility and liability. The policies, procedures and any fees referred to herein apply to all RSU No. 5 facilities with the exception of the Freeport Performing Arts Center and the Joan Benoit Samuelson Track and Field. For policies, procedures and fees related to the FPAC, please see KF-R1: Guidelines for the Freeport Performing Arts Center, and KF-R2: Guidelines for School Use of the Freeport Performing Arts Center. For policies and procedures related to the Track and Field, please see “Guidelines for the Use of the Joan Benoit-Samuelson Track and Field.” These factors are to further guide community use:

I. Groups that may use School Facilities include the following:

a. RSU No. 5 school curricular-related groups;

b. RSU No. 5 Board of Director’s sanctioned co-curricular and extra-curricular groups;

c. RSU No. 5 Board of Director’s sanctioned Community Programs groups;

d. School-related organizations, such as booster groups or parent-teacher associations;

e. Municipal-sponsored groups and organizations from within Durham, Freeport or Pownal;

f. RSU No. 5 based non-profit organizations. Such groups are considered district- based if greater than 75% of members are RSU No. 5 residents.

i. Community youth groups

ii. Community adult groups

g. Non-RSU No. 5 based non-profit groups

i. Youth groups

ii. Adult groups

h. Commercial, profit-making groups IT. Availability of Facilities and Scheduling:

a. Use of RSU No. 5 School Facilities beyond the end of the school day shall be at the sole discretion of RSU No. 5 Community Programs in conjunction with the Superintendent. Use may be denied when groups cannot meet the requirements

RSU No. 5 School Department set forth in the policy or when it is not in the interests of RSU No. 5 to offer these spaces or facilities for public or private use.

Page 1 of 5

NEPN/NSBA Code: KF

b. Application for use of School Facilities is to be made through RSU No. 5 Community Programs.

c. In order to attain the highest and best use of the facilities, consideration may be given to the following factors:

i. Intended use; length of use; number of participants served; length of time since reservation of space has been approved; building-based programs; RSU No. 5-based programs; curricular versus extra- or co-curricular use; history/longevity of user within the space; other factors as deemed necessary for consideration.

d. Application for building use will ideally be submitted a minimum of twenty working days in advance.

e. A master schedule of all events scheduled in all of the School Facilities will be maintained by RSU No. 5 Community Programs and made available to district administrators.

f. Community adults and children are free to use outdoor grounds and facilities outside the school day for recreational purposes whenever the spaces are not otherwise scheduled. However, formal approval of buildings and grounds use will only be granted to recognized organizations and groups.

g. Repeat use may be denied to any group that has not demonstrated appropriate conduct and care.

III. Use of Facilities for School-Sponsored Activities

a. The use of any facility by a school activity or directly related co-curricular activity is dependent upon faculty advisorship. Each activity shall have a faculty advisor present and in attendance during all building/facility uses. The advisor is responsible for preserving order and compliance with the provisions for facility use as outlined within this policy or related form KF-R. The advisor shall be responsible for controlling and restricting entry and exit to one entrance during rehearsals and other activities. The advisor shall provide for unlocking and locking of doors as necessary. The participants shall be required by the advisor to remain in the immediate area for which he/she has received prior permission to use.

b. Athletic events and extracurricular activities shall be planned, executed and controlled by the appropriate principal, athletic director, coaches or appropriate approved school personnel.

IV. Use of Facilities for All Groups

a. Insurance: Any non-RSU No. 5 group requesting to use a facility must provide proof of insurance naming Regional School Unit No. 5 as an additional insured in an amount deemed appropriate to the particular use. The superintendent or his/her designee has the sole right to determine the amount of insurance for each event;

b. No Alcohol: No alcoholic beverages may be brought onto school property at any time;

c. No Tobacco: Tobacco use shall not be allowed on school property;

d. Iegal Uses: School facilities may not be used for any illegal purposes;

RSU No. 5 School Department

Page 2 of 5

NEPN/NSBA Code: KF

e. No Marijuana: No marijuana mav be brought onto school property at any time:

f. Billing: RSU No. 5 Community Programs will bill Applicants at the appropriate rate. Payment of charges will be forwarded promptly after receipt of billings, in any case no later than 30 days;

g. Use of Special Equipment: A minimum of one-week advance notice shall be given for any special equipment required. Additional charges may apply;

h. Use of Electrical Equipment: Approved schoo personnel shall supervise or control all electrical arrangements and use of equipment as deemed necessary;

i. Use of Technology: A member of the technology staff shall be consulted to determine the availability of technology;

j. Preserving Order: Applicant is responsible for preserving order and shall detail in advance supervisory plans for school authorities, which retain final authority. Police security will be provided and arranged for by Applicant at Applicant’s expense when required by the school administration and/or by state/local regulations;

k. Staff Member Present: A staff member must be present during the entire time the facilities are in use. The building administrator and RSU No. 5 Community Programs must approve any exception to this rule in advance. No keys will be provided; instead, building must be secured and opened by a staff member. If the facility is being used during a time when no such staff is present, the applicant will assume all expenses related to the costs of having staff present;

1. Kitchen Facilities may not be used for non-school purposes unless approved by the Director of Nutrition. A member of the kitchen staff will be on duty for supervisory purposes and any expense involved must be paid by the user in addition to any other charges;

m. Gambling: Gambling on school property is prohibited unless allowed as an approved, legal, fundraiser (i.e. casino nights, fifty-fifty raffles and bingo) for school or community booster groups. Such activities must be approved by the superintendent (or his/her designee);

n. Weapons/Flames: The use of weapons, open flames or other incendiary special effects is prohibited at all facilities unless approved in advance by the superintendent (or his/her designee).

o. Animals on Premises: Individuals seeking to bring animals into school facilities shall follow RSU No. 5 Board policy IMGA: Service Animals in Schools;

p. Loss or Damage: Any non-RSU No. 5 group shall assume liability for the loss or damage of articles brought to the facility and any damage to the building, grounds or equipment that may occur during use;

q. School Furnishings or Fixtures may be moved only with prior approval. It is the responsibility of the user to restore the facility to its original condition or to pay custodial staff for this service;

t. Responsible Party: The individual whose signature appears on the facility use form application will be considered the person responsible for supervision of the facility requested. He/she will also be responsible for the safety and well-being of all people at the facility. In the case of non-RSU No. 5 users, he/she will also be the contact to resolve disputes related to costs incurred due to damages to the facility or equipment during the permitted time period;

RSU No. 5 School Department

Page 3 of 5

NEPN/NSBA Code: KF

s. Cancellations: The superintendent, or his/her designee, has sole authority to determine whether the facilities should be closed for reasons of public safety. Notification will be made as soon as possible. Contracts in force for periods during which the school is closed for reasons of public safety are cancelled automatically without penalty to either party. However, every effort will be made to reschedule any cancelled event to a mutually acceptable date. If the user finds it necessary to cancel an event, RSU No. 5 Community Programs must be notified at least 24 hours prior to the event. If no notice is received, the person or group renting the space will pay the costs of any expenses incurred.

t. Hold Harmless: Any individual or group utilizing RSU No. 5 School Facilities for any purpose (including non-permitted walk-on use) agrees to save, indemnify and hold harmless RSU No. 5 and all its employees, RSU No. 5 Board of Directors and all of its members, and RSU No. 5 Community Programs and all of its employees or designees, from and against, any and all liabilities, actions, courses of action and damages arising out of any negligent or tortuous acts on the part of the facilities’ applicant, applicants’ employees or agents, and from any and all fines, suits, claims, demands and actions of any kind or nature of any and all persons by virtue of or arising from the use of said facilities, equipment, or activity participation. It is also important to note that participation in recreational and athletic activities can cause bodily injury, sickness, disease, or death or injury to or destruction of tangible property, including the loss or use thereof. Therefore, all of the aforementioned groups and individuals shall also be held harmless from and against all claims, damages, losses, and expenses, just or unjust, including but not limited to costs of defense, including attorney’s fees arising out of or resulting from the performance of any facility use agreement.

V. Rental and Other Fees

a. Rental Fees. Users shall pay rent on a multi-increment scale that reflects highest amounts for groups engaging in a profit-making enterprise on school grounds, as shown on Procedure KF-R: School Facilities Rate Chart.

b. User Fees.

i. Custodial fees and other staff costs will be charged when necessary to the use of the facility for users as shown on Procedure KF-R and/or KF-R1.

ii. Equipment use fees will be charged as deemed appropriate. Requests for the use of equipment must be made to RSU No. 5 Community Programs at least 10 working days prior to the requested date. Not all equipment is available for public use.

iii. To the extent feasible, the hours during which school facilities are used shall coincide with the hours during which custodians are on regularly scheduled duty. To the extent after-hour use results in overtime pay for custodians or other staff, additional costs will be the permitted user’s expense. Custodial services may include set-up, breakdown, locking/unlocking doors, and general maintenance.

iv. A regular RSU No. 5 food services worker shall be required when renting any school kitchen facility. Associated costs shall be charged at the existing contract rate, and overtime may be assessed as appropriate.

RSU No. 5 School Department

Page 4 of 5

NEPN/NSBA Code: KF

c. Regional educational organizations that are led by RSU No. 5 staff members may be granted waivers from room use fees provided that no expenses are incurred by RSU No. 5 as a result of the use of the facilities and no fee is collected from participants to attend the meeting or event. Such waivers must be requested in writing to RSU No. 5 Community Programs prior to the event.

Adopted: August 25, 2010 Reviewed: April 24. 2013 Revised: January 10, 2018 RSU No. 5 School Department

Page 5 of 5

Cems ILA, rsu Durham « Freeport * Pownal TO: Kathryn Brown, Jeremy Clough, Candace deCsipkes, Lindsey Furtney, Jennifer Galletta, Elisabeth Munsen, Maura Pillsbury, Michelle Ritcheson, Lindsay Sterling, Valeria Steverlynck, Madelyn Vertenten, Rhea Fitzpatrick, Liam Hornschild-Bear CC: Julie Nickerson, Lisa Demick, Kelli Rogers, Ray Grogan, Erin Dow, Dennis Ouellette, Will Pidden, Craig Sickels, Jim Grant, Peter Wagner, Jen Gulko, Bonnie Violette, Emily Grimm, Conor Walsh, Charlie Mellon, Michelle Lickteig, Anne-Marie Spizzuoco, Beth Daniels, Deanna Coro, Pauline Gillis, Shawn McBean, Dorothy Curtis, Eugenia O’Brien, Hank Ogilby, Lisa Blier, Linda Pritchard, Jennifer Winkler, Nancy Drolet, Nancy Dyer, Jessica Sturges, Nancy Decker, Alicia DeRoche FROM: Cynthia Alexander, Assistant Superintendent of Curriculum, Instruction, and Assessment DATE: November 12, 2019 RE: Review/Update of Policies At the November 20, 2019 Board of Directors Meeting, the following policies will be on the agenda for 15 Read, 2™ Read, and Review. The policies are attached. 1% Read Policies

1. BBAB —RSU No. 5 Board of Directors Self-Evaluation 2"4 Read Policies

1. IMGA - Service Animals in Schools The following policies were reviewed with no recommended revisions and require no Board action.

1. KF ~- Community Use of School Facilities

2. BBAA — Board of Directors Member Authority and Responsibilities

3. BBBDA - Board of Directors — Declared Vacancy Caused by Absenteeism

4. BBBE — Unexpired Term Fulfillment/Vacancies Regional School Unit No. & 17 West St., Freeport, MH 04032 Telephone: 865-0928x5 E-mail: memanusgé@rsuB.org

NEPN/NSBA Code: BBAB

ESU-Ns- SOA D-OF DIRE SLPORSs LEE SEO

| BIRGENSIOR-G-CONTERTUM, ee | _Fhiseetioncceurss | Frequently Oeensionally Rarely Never _

oF — 16s 42 4 : : Sai haal 1-9-8 —765 422 6 events-end-rendsariketerees StensEaenis

4 Board recognizesthe i953 UH GS 43-2 1—9

. bie€ . 5TLhave-been-present-at-beard 5-5 7-6-5 43-2 +6

- . . values o¢ the ae were ley factors

“EHO, to-9-§ — 765 43 Io paoacdetod-by-niete-ond—federallaw, . . epartment-of ‘ cir on ie sours: = } &—Beard establishes-and-maintainsa 10-0-8 — 76-5 i +49 systematic-ples-feeteadsacicen 9_Beeed-keepe-afomec-aboutwahat 19-9-$ — 76-5 4-3-2 6 eecuctoweractstties: = = = = RSU No. 5 School Denartment

NEPN/NSBA Code: BBAB

10,-Beard-stays-aware-of its debt 40-98 -—765 432 @&2«240 | eeseeyes : _ Se __ | DIBGENSIOBLLE CORE

——_109 a

— 4 — = i

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

DIMENSIONH: EDUCATIONAL

1 -Bosed_- saci Severn BORs-B of 65 43-2 +0

. Fi : OS te th 5 ag 1-59-38 —7-6-3 43-2 +9 ee ee wee regee =a “if _ needed. a

4. At least once overy-avo-yarss;the 40-959-8 —76—-5 4-3-2 1-9

ge 8 or aes ere ae 5 - | ears ; . y | SSRSESSSSe- fi . hat the beard motkrmedeiiaeiee | 49-8 +765 432 +o | 5 Snir 2 = Prke * frretrierer Dy 4-9-8 —F65 43-2 +6 policies, procedures, and-employee contacts: ee Ho HS 4-3-2 ig _——e a ral)

GCOMAUISEEES-OEHCORSCER ES:

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

ee _ a _Fhisaction-ceeurss --s_—s| «Frequently Geeasionally Rarely Never 4—Eeunte:theineome-and Oe ee eS 43-2 oe)

. . expenditures of the school s} stom 8 roar : : the ere of : anne ee ihe community to supper sues-a efseheo! finance including state,

blied Jusine the bud preeess: blishine bud serities 4 ities £

_ineludes teachers-and- administrators.

' 6--Monitors- the financial statusofthe | 0-9-8 —7-6-5 4-3-2 +9 7—Assuresthe-development-oflenc- ij —/6—3 i +9 Hs a *O8F ae ; : SPORSEV the, needs of all students. _

“0. Board identifies abilis 109-8 7 65 , 33 ra 410—Beard-assesses-financial iGo -3 = 7-§-5 4-3-2 +4 rs es So

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

a a a _ a eS i ————————— —— a heis-minds-witl g £ bei

esteeteed, #98 —7£65 43-2 +6 == Ae Pip sn .

199-38 —76-5 43-2 5 the superintendent's area of eoraplaints-nadrequesisie-the Beard het itd 10-9380 CH HS 43-2 +0

1g for-itaelé-distinet-f Liste: 9Bourd-handles-contictopenttond 109-8 —+63 43-2 90 10-Besrdiscomforableoncoweging 1f2-02-$ —76—5 44-2 +9 (OTC ESO Ue oes el See

—__%, COMMENTS OR CONCERNS:

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

(7a a9 07 VST : _ _ make; — a 0-5-8 —76-3 A423 Sd

PRT EETENE, SAR SUDO SOE Satelsee ta teath et

renehescenciusions: | —_ S| : Lio infl how-it-handl | isgue,the board-i Factabl . istof : appreaches-orselutiens-te-the 5-3 —765 43-2 +o > = es oe ipmeabi _ ss rere : Sere ce _

| $--Beard-dees-notpresentnewissues | 10-98 —7 6-3 432 +9 ; Sexe f

De 7 Se | te me a : se airy eels te-be _10—Beard-hendles-issuesthatare 1-9-8 —765 432 14 DEMENSION- V SCORE:

— 4199 a COMMENTS-OR-CONGCERNS:

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

a a a SPaie-netvien-oeeMres Frequentiy Geeastoneally Rarely Nous 1.-Board-shews-en-awereness-ofthe es 42) +9

; tes decisi 114 oe as OO - - ecowelles-beoancecubexs g Lin id ve

: Pe tatt Heel: SS; 1-9-8 —76-5 a el +9 7-H the-board-thinks-a-group-ef Ho be. (3 +9 . sg Hike! i ‘i SF 3—EBeard-has-adepted-s-ssliesos, 1-5-3 —+¢635 432 +4

pareatend-publie lati ig | : high | references andteviews. RC wy Sf —- 3 435 +o state-and federal education

DEVMENSION-¥VIESCORE:

ee |. es ee

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

DIMENSION MIN-STRATEGIG

| This-netion-ceeurst Frequent — Qeensionally Rarely Never

Petite teenies | ———" bth ES 43, +6 CO attainingtonwierm-geals; : |

5Thave-been-at board - meetings op 8 7 6 5 433 +9 4 ‘on-f identify . hee! 7—Beasd-comparceropertt-on if bP $ 48S 43-2 iG hools? ith the district! | long-term-geats, | $-—Beard-has-e-preeedureinplacefor | 10-9-8 -—76—-5 43-2 i$

Jaoti ;

evaluations a ‘lability of outside funds,-suel | state-andfederal grants, spesial “the superintendent wll be measutesh a

DIME SOS VEL SCORE

_——w esa] l ee 5 COMMENTS OR CONCERNS:

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

OQVERALE- GRADE: |

ee eee eee COM ABNF

——— eT ——— ——————— —————— | a | Se ———— —— eee | —

Sanne eee ee eee —————— $n Adopted: February 24-2010

Revised:—J. 26-261)

RSU No. 5 School Department

NEPN/NSBA Code: BBAB

Annually in August, Board members will complete a self-evaluation and submit to the Board hair for compilation, The Board will review the compiled results at a meeting in August o els eil=silel= he res oS Wu pe used bv the Board as part o it’s et Oe) Sh ting otal slanning in open session. The Board encourages all of its members to attend, The nerintendent is emphasize areas of strength as well as those identified for improvement. Board members are encouraged to use the evaluation process as an opportunity to reflect on their own persona yerformance indicators by which to appraise the Board’s functioning and effectiveness. The Board subcommittee structure, responsibilities, and processes: oe - DE . . ‘a2 a b 5 LOSS KeLeren 5 BAB-E Board of Directors =e VEaIEON LSU RSU No. 5 School Department Page 1 of i

NEPN/NSBA Code: BBAB-E

BOARD OF DIRECTORS SELF-EVALUATION INSTRUMENT

Introduction The Board of Directors Evaluation System is based upon the National School Boards Association Standards of Practice. There are five key standards of Board leadership incorporated into this model:

® Vision, Leadership & Accountability

® Board Governance & Policy

® Communication & Community Relations

@ Fiscal Resources, Staff Recruitment & Environment

@ Ethical Leadership Timeline

End of July Distribution of evaluation (electronically) July/August Individual board members complete the self-evaluation electronically for compilation by the Board Chair or designee. August/September Board reviews compiled results. Results will be used by the Board as part of its annual goal setting and planning for the year.

PART I: Standards of Leadership

These standards are rated using the following scale: 4 - Exemplary ratings are reserved for performance that significantly exceeds proficiency and could serve as a model for leaders district-wide or even statewide. Few Boards are expected to demonstrate Exemplary performance on more than a smal] number of targets. 3 - Proficient ratings represent fully satisfactory performance. It is the rigorous standard expected for most experienced Boards and the goal for new Boards performing at the basic level. Proficient Boards demonstrate acceptable leadership practice and meet or make progress on all outcome targets. 2 - Basic ratings mean that performance is meeting proficiency in some components but not others. Improvement is necessary and expected. 1 - Does Not Meet ratings indicate performance that is unacceptably low on one or more standards and makes little or no progress. Ratings of ineffective are always cause for concern. RSU No. 5 School Department

Page 1 of 6

NEPN/NSBA Code: BBAB-E

Standard 1: Vision, Leadership & Accountability Descriptor: The Board of Directors commits to a vision of high student achievement and effective instruction, specifies clear goals to realize that vision, demands accountability for results, and supports continuous improvement of the district. Possible Data Sources:

® Alignment with District vision and mission statement

® Adherence to Standards of Ethics

® Established goals

® Board agendas

® Board presentations

® Board retreats @ Board communications @ Annual evaluation of the Superintendent

® Board self evaluation Rating for Standard 1: Vision, Leadership & Accountability

| 4 3 2 i cen Proficlent Basic Does Not me J Meet

A. The Board develops a shared mission and vision that reflects student achievement and community priorities, and communicates it _to the community.

B. The Board develops annual District goals in alignment with the District vision and mission and adopts a strategic plan developed by the Superintendent to meet those goals. Goals are communicated to the community.

C. The Board regularly monitors progress on District goals, effective _instruction, and student achievement with data-based information.

D. The Board keeps informed about what children are learning || through reports on scholastic achievement, vocational programs, and the impact of extra-curricular activities, |

E. The Board annually evaluates the job performance of the Superintendent and monitors the progress made on the Superintendent's voals. | |

F. The Board conducts a self-evaluation to monitor its own | performance and participates in professional development, including _Board training and seminars. Comments: RSU No. 5 School Department

Page 2 of 6

NEPN/NSBA Code: BBAB-E

Standard 2: Board Governance & Policy Descriptor: The Board of Directors works effectively as a team and collaborates with the Superintendent, exhibits a shared understanding of Board and Superintendent roles, maintains a set of Board operating procedures, and leads/governs the District through policy. Possible Data Sources:

® Date and agenda of annual orientation @ Policy review and updates

e Board policy manual

e Board orientation materials

e Attendance and state-mandated trainings Rating for Standard 2: Board Governance & Policy

ian nell a a = 3 2 1 | Exemplary | Proficient Basic Does Not L | Meet

A. The Board and Superintendent participate in an annual retreat to . | build team relationships, review roles, responsibilities, and Board |_ operations, and orient new Board members.

B. The Board has a procedure in place for regularly reviewing . _existing policies and developine new ones. | |

C. The Board closely adheres to its own procedures, protocols, and »olicies for effective Board operations, =

D. The Board clearly understands its governance role and responsibilities, adheres to open meeting laws, and delegates district operation responsibilities to the Superintendent. 1s uy

E. Board members publicly support the decision of the majority and speak with a unified voice. | —

F. Board leadership acts as a mentor to new members to help them learn the ropes and provides new members with a detailed

_ explanation of the Board's mission. tL Comments: RSU No. 5 School Department

Page 3 of 6

NEPN/NSBA Code: BBAB-E

Standard 3: Communication & Community Relations Descriptor: The Board of Directors effectively communicates with the Superintendent and the local community, represents community interests and values, and ensures District information and decisions are communicated to the community. Possible Data Sources:

e Communication policies or procedures @ Schedules or invitations to community forums @ Reports or presentations on programs that demonstrate community partnerships

e Legislative meetings. Letters or advocacy efforts

® Newsletters and website @ Survey results Rating for Standard 3: Communication & Community Relations Exemplary Proficient Basic Does Not

* Meet ——4

A. The Board develops a collaborative relationship with the Superintendent, keeping cooperation and respectful discussions at the center of its deliberations. —— |

B. The Board establishes effective communication with parents, students, staff, and community members while _respecting the chain of command and lines of responsibility _

C. The Board works with the Superintendent to gain input from the community using forums, surveys, or other vehicles, following agreed-upon procedures. DD. The Board actively promotes support for the District through its vision and promoting educational opportunities for \_all students. | __ =|

E. The Board is an advocate for the District’s interests with | legislators and other elected officials. Comments: Standard 4: Fiscal Resources, Staff Recruitment & Environment Descriptor: The Board of Directors oversees the fiscal conditions of the District, aligns resources to meet District goals, ensures appropriate policies for staff recruitment and retention, supports district wide learning and promotes conditions for health and safety. Possible Data Sources:

® Process for budget development and adoption @ Communication materials, website, newsletters

e Facilities plan and schedule for updates

e Audit report @ Policy on recruitment and hiring

e Professional development plans RSU No. 5 School Department

Page 4 of 6

NEPN/NSBA Code: BBAB-E

Rating for Standard 4: Fiscal Resources, Staff Recruitment & Environment

4 3 2 i Exemplary | Proficient Basic Does Not | Meet

A. The Board adopts an annual budget that adheres to the a | provisions of the law and allocates resources based upon the District’s vision. voals. and priorities for student achievement. | —_ |

B. The Board keeps the community informed about the financial | | | needs of the District, seeks cost savings and operational efficiencies, and invites communi!» input.

C. The board monitors a facilities plan that meets student and | staff health and safety reculations and euidelines. _ | — a | | DD. The Board ensures that the finance committee functions in accordance with regulatory requirements, reviews internal audit | | findines, and responds appropriately.

E. The Board supports the recruitment of highly effective teachers, administration, and staff and provides professional

_development and support. L i: — J Comments: Standard §: Ethical Leadership

Descriptor: The Board of Directors promotes the success of all students and staff, and conducts District business in a fair, respectful and responsible manner, Possible Data Sources:

® Articulation or publication of plans and programs for student success

® Code of Ethics Policy

® Standards of Ethics Rating for Standard 5: Ethical Leadership d 3 2 1 | Meet

A. Board members are able to speak their minds without fear of being ostracized. | — |

B. Board handles conflict openly and constructively.

C. Board members actively promote the belief in the | success of all students in the district. J _ | = ]

D. Board members act as conscientious role models and exhibit professionalism. __ — |

E. Board members exercise authority only as a board as a whole and recognize that no individual board member has | authority to take individual action on behalf of the Board. | F, Board members avoid conflicts of interest and __ appropriately disclose if one arises. | G. Board has adopted and annually reaffirms its code of

_ ethics, ! UI Comments: RSU No. 5 School Department

Page 5 of 6

NEPN/NSBA Code: BBAB-E

Board of Directors Self-Evaluation Annual Evaluation Rating Form

| Standards = —st—“‘<‘iéC!O#O#O#O#(#O(#(#(#«SUMMATIVE SCORE "Standard 1: Vision, Leadership and Accountability | 4 3 #2 1 | Standard 2: Board Governance and Policy 4 3 2 1 Standard 3: Communications and Community Relations 4 3 2 1 ‘Standard 4: Fiscal Resources, Staff Recruitment & | 4 3 2 1

Environment

Standard 5: Ethical Leadership _ | 4 3 2 1 | | ANNUAL EVALUATION SCORE iosasce icoom 16% Approved:

RSU No. 5 School Department ry . . . s .

Page 6 of 6

NEPN/NSBA Code: IMGA

ihe POO TeCOPDIZES Liat ST } ~~ OS De als Sel TO) DDO VICIG. BSNS lek Lt} SOEIG yersons with disabilities, This policv governs the presence of service animals in the schools, on school property, including school buses, and at school activities As applied to schools, federal and Maine laws define a “service animal” as a dog that is disability, Other species of animals, whether wild or domestic, trained or untrained. are i he VOT OD) AS LI OGG CF} A Servi ~ Clie DSL Oe OlCoL Oath Lt) te srovidines nonviolent protection or rescue work. pulling a wheelchair assisting ar individual during a seizure. alertine an individual to the presence of allergens, retrieving balance and stability to an individual with a mobility disability and helning a person with a psvchiatric or neurological disability by preventing or interrupting impulsive o i he crime deterren elie me OT al cl mal’s OIOSCUCe ANd GG DIOVISION OF CiOvOTA “Wiel vt -being MOTOIOTL © ompanionshin id) Tit) onstiti ~ WOK OF [TASKS [0 tls se of 2 service animal by a qualified student with a disability will be allowed in schoo access to the instructional program. school services and/or school activities

Se ©) A service anima * “me alified emplo se with a disability Wi Oe GOW WET SUC TL U e is DecesSalv [LO Cnapic Loe timmplovee LO perrory Toe essential LUNCHOOS O his/he} iob or to eniov benefits of employment comparable to those of similarlv situated

RSU No. 5 School Department

NEPN/NSBA Code: IMGA

. . ’ . . ihe paren hea Chie 0) LL WIIG) DG PVCS LUG SLUG NCCOS LO DIT o SET SS ee ‘O school. or an emplovee who wishes to bring 2 service animal to school. must submit 2 LJ a * a J os o os J J iJ iJ VOULLG TCOLES OO Le DUO rit orl ihe building prin et t] OTISUILALIOE Will Loe ection 504 Coordinator or Director of Instructional Support. as annronriate. and the perintendent will determine whether or not to permit the service animal in schoo Parents or animal handlers who will be present in school for the purpose of assisting a student with his/her service animal will be required to submit to a sex offender registr: and criminal backeround check, In addition. parents and handlers must comply with a standards of conduct that applv to school emplovees ana volunteers he sCUOG ni abt: Impose at) ditiona onditions ony ie DTC Se I YS a servi ' anima The building principal may remove or exclude a service animal from the school or schoo . . * elatjel=qh 1G DOICSGUCE 0 GC ADA DOSES @ OCC! ante 4 UG tite 1 tl) Salley © others or the student. emplovee or handler is unable to fu ontrol the animal: or the animal fails to consistently perform the function(s)/service(s) for which it has been A parent or employee whose service animal has been removed or excluded mav anneg he decision to the Sunerintenden dissatisfied with the Superintendent’s decision. the ndi id oa ai 4 disabilities er: Ot af ompanied oh hej servi . ANNE s LO CYCLES ©] : ivities open 4 l=e bi ars are held in s NOON OF OF) &SOCUOO OT ODT LY ihe se 4 service animal mav not be conditioned on the pavment of a fee or security deposit. b he individual is liable for anv damage done to the premises or facilities by such an ihe bu Late? OT Ve) enn alice (CYVORE OF GA 106 LUG SGT } S Mead (0) le tal DOSCs a direct threat to the health and safety of others. the use of the animal would result in substantial physical damage to the property of others, or would substantially interfere with the reasonable eniovment of the event or activity by others

RSU No. 5 School Department

NEPN/NSBA Code: IMGA

Cross References Adopted: December 14,2011 Reviewed: December J2, 2012 Revised: RSU No, 5 School Department

Executive Summary of Workpiace Satisfaction Survey 2 (Completed by Staff spring of 2019) Plow at la is) eee ——— RSU 5 Satisfaction Survey 2018-2019 (Percent that are somewhat, quite, or extremely positive} = Al Overall, | A2How | A3 Would | BiHow | B2How CiHow |C2How | C3Docesiaff | D1 How ElHowe Bai. Te How often how positive | positive are | you supported do | useful are the | positiveis | effective are the | itedback. effective is effective are the | effictive are do you feel you is the the rectmmend | you feelin ~ | professional | the — communication | impact your school’s: | structures in the structures | have adequate working sititedes of | ‘your school | your development | influence of | structures in decision evaluation your school that | in your school | material quviranment | your aa professional | opportunities | the school | your school?- making at system in supportthe | that support resources to st your colleagues? | workplace for | growth in offered to leaders on. Your school? | helping you socinlLemotional | theacademic | support your seeking of your students? ofall students? | learning? Lasse | me ver ___| employment? school? m Fir | | w 4% PES Teacher 100 100 | 92 85 69 100 | 100 100 85 100 100 100 {13 Resp.- 59%} | = = = PES Ed Techs 100 100 100 100 100 100 100 100 100 100 100 100 | {2 Resp.-40%) | | L : | _ ee | DCS Teacher 74 77 62 71 80 71 71 68 88 65 77 100 _ (34 Resp.- 68%) | | | —S—— DCS Ed Techs 87 | 87 75 75 75 100 100 50 75 100 100 100 | 18 Resp. - 73%) | ee es | a | MSS Teacher 95 8&9 84 95 100 89 | &9 &9 &9 100 100 95 | (19 Resp. - 51%) | — | MISS Ed Techs 100 100 86 100 100 100 100 86 86 100 100 86 (7 Resp.-54%} | | _| es MLS Teacher 92 96 92 92 79 91 | 79 87 79 71 37 100 {24 Resp.-71%) | 1 1 } — — } MLS Ed Techs 67 67 67 | 67 100 100 67 67 100 67 100 100 {3Resp.- 75%) | | } = | i | | FMS Teacher 92 92 88 84 68 92 &0 88 64 84 92 100 (25 Resp.-6G0%) en 2 | _ — | ————t | FMS Ed Techs 100 100 100 91 | 73 | 100 100 100 91 91 91 82 (12 Resp. - 9296) | ————"| ——— i || | FHS Teacher 84 88 76 75 47 72 72 72 49 | 84 98 79 (43 Resp. - 73%) | | 1 —=} FHS Ed Techs 100 100 100 83 83 100 83 100 | 83 100 100 100 | (6 Resp. — 50%) = = L_]

1

Executive Summary of Workplace Satisfaction Survey (Completed by Staff spring of 2019) On the question (F2), “which of the following factors most influence your satisfaction in the workplace,” all schools and subgroups rated colleagues, leadership, and culture as most important, but sometimes in varying order. The only exception to this were the ed techs at the high school who chose salary, culture, and colleagues as their top three factors influencing their satisfaction . Summary of Individual Schools:

PES:

Overall Strengths:

e Overall, responses were positive in all categories. Opportunities for Growth

e Creating professional development opportunities that are useful (31% report not at all useful or slightly useful).

DCS:

Overall Strengths:

e Resources, professional development, and the evaluation system were strengths. r tunities for Growth:

e Creating a workplace that others would recommend for employment (38% reported that they would sometimes recommend)

e Creating more opportunities for staff feedback to impact decision making at the school (32% report that staff feedback almost never or once in a while impacts decision making).

MSS:

Overall Strengths:

e Staff were very satisfied with their Professional Development opportunities.

e Staff were very satisfied with their social emotional and academic supports provided to the students. Q tunities for Growth:

e Creating a workplace that others would recommend for employment (16% reported that they would sometimes recommend).

MLS:

Overall Strengths:

e Staff reported that the attitudes of colleagues is very positive, and that there is a positive working environment. 0 tunities for Growth:

e Staff reported that there are not enough structures that support the social-emotional needs of all students (29% reported as inadequate or needs to improve).

FMS:

Overall Strengths:

e Staffreported that the attitudes of colleagues is very positive, and that there is a positive working environment.

e Staff reported on the positive influence of school leaders.

2

Executive Summary of Workplace Satisfaction Survey (Completed by Staff spring of 2019)

e Staff reported their evaluation system not being effective in helping them to improve (36% reported that it is not at all effective or slightly effective).

e Creating professional development opportunities that are useful (32% reported that it is not at all useful or slightly useful).

FHS:

Overall Strengths:

e Staff reported that the attitudes of colleagues are very positive. 0 tunities for Growth:

e Staff reported their evaluation system not being effective in helping them to improve (51% reported that it is not at all effective or slightly effective).

e Creating professional development opportunities that are useful (53% reported that it is not at all useful or slightly useful). Districtwide:

e Overall there was a positive response to there being effective structures in the schools to support the academic learning of al] students.

e Overall all schools feel they have adequate material resources to support learning for students. The data will be used by principals and their leadership teams to reflect on the survey responses and determine action steps needed to strengthen their schools.

3

Source: , linked from www.rsu5.org/board-of-directors-and-policies/board-agendas-and-minutes/agendas. Text copied out by software (pdftotext, then OCR); no wording corrected.