Text copied out by software, not the document itself. This is an image-only scan, read by text-recognition software, so figures, names and tables are unreliable. The district's copy is authoritative; check it before relying on this text.

2010 Capital Budget Completed Projects Pownal School Entry Enclosure

Pownal Gym Lighting Upgrade Pownal Front Roof Section Morse Street Water Heater

Pownal Entry Enclosure Pownal Entry Enclosure ———s = This design will decrease the in tush a er of cold air into the front hall when ~~ the front door is opened during the a ia | cold weather months Bobs rr —- = Payback or energy savings is difficult — i aia to quantify but should be evident . a ao throughout the cold weather Pownal Gym Lighting Upgrade _ Pownal Gym Lighting Upgrade ~~ . - 2 Removes 36 T12 lighting Fixtures

= and replaces these with 12 T SHigh oe . efficiency fixtures ee xf a 2 Added three occupancy sensors

See ~ - =» Earned incentives from Efficiency ee Maine | 1 sg Pownal Roof Replacement Front Pownal Gym Lightin rad ; ym Lighting Upgrade Section

» Hours of Operation 2000 hours to 1600 a hours per year 20% less due to occupancy ee pes sensors os — = Electrical: usage per year old fixtures a. “ee en SS

« Electrical usage per year new fixtures Mk a ree £0 a

» Total Savings per year $1,397.00 ee ee :

» Rebate from Efficiency Maine $900.00 ee ee

« Payback for this project 2.04 years rt—“‘i<“‘“‘COCOCS

Pownal Roof Replacement Front P Morse Street Water Heater Section

= Front section completed over the 4 - 4 i aed = 35 year architectural shingles Ss i ie Morse Street Water Heater Morse Street Water Heater a Old Heater cost $44.13 a day to = Project replaces a 27 year old operate or $16,107 per year electric water heater servicing the «s New Heater cost $12.84 a day to kitchen and Wing D operate or $4,686 per year

» Heater converted from electric to = Savings per day to operate new natural gas heater $31.29 or $11,421 per year

» Payback for this project 2.49 years

2

Durham Geothermal Construction Durham Geothermal Construction = Uses a closed loop system to extract Eee ee ae heat from the ground water in winter —— (ow Ge oT eg and expels heat into the ground in : ee a ~ sa warmer months mae a 2 Environmentally friendly “ a.

« Energy management system in place See a =

« First year of operation will allow us to es | oe | build a baseline for future savings oe . —

; ; Freeport Middle Dishwasher Freeport Middle Dishwasher P Relocated from Durham relocated from Durham Elementary Elementary replaces the high temperature — a machine that had reached the end of , oe it’s life cycle of 20 years . = “ae

= The low temperature machine uses os = ee 6.88 KWH less energy per hour of ov, aie.

use a Pownal Soffett and Fascia | Pownal Soffett and Fascia ne ~ — = This project preserves the wood a a ee understructure and improves the

ft “fh s oo i appearance of this building

3

Durham Elementary Recycled Durham Elementary recycled . . Materials Materials # Pendant Lighting — ee = Ceiling tiles a =. 2 White boards lc (‘i Yr! a. a Projectors = SB. =e

» Bookcases oe Oe s Desks and classroom furniture POS : . Durham Elementary recycled Durham Elementary Recycled Materials Materials pe eee SU eee ot eee | aad fi SO ne eis Uae cys SS ee A OU eta pea e. Ss es es Shc. Ee Re emer Durham Elementary Recycled Durham Elementary Recycled . . Materials Materials Se ee RE ON in Durham Elementary Recycled .

raly EC’ Natural Gas for Heating - Materials SS ee

oo ough | (Ee « Natura! Gas will be the primary eeu ae Pownal Elementary, Freeport High CS School and Morse Street School = ce || beginning in late October and early Natural Gas for Heating Natural Gas for Heating

Fuel Oil a» Therms of Natural 2009-2010 gallons Gas anticipated used s Cost of natural gas per Therm $.859

« Fuel Oil equivalent per Gallon $1.12

« Propane equivalent per Gallon $.079 = Pownal 10,100 = Pownal 14,039

. » Morse Street s Morse Street School 13,730 school 19,084 = Freeport High a Freeport High School 22,669 School 31,510

Natural Gas for Heating Natural Gas for Heating Fuel Oil 2009-2010 == Therms of Natural Savings per Year Natural Gas costs per school Gas anticipated costs

- Pownal Elementary $7,640 Pownal $19,695 Pownal $12,055 Morse St School $10,381 Morse St $26,774 Morse St $16,393 Freeport High School $17,138 High School $44,205 High School $27,067 TOTAL SAVINGS $35,159

5

Natural Gas For Heating Payback wos 2011-2012 Anticipated

Pownal Payback 3.24 years Capital Budget* Morse St. Payback 1.94 years High School Payback 2.92 years . g y Y *Taken from RSU No. 5 Capital Plan . adopted January 2010 2011-2012 Anticipated Capital 2011-2012 Anticipated Capital Budget” Budget zn Two 78 Passenger School Buses = Buses (two) 78 passenger (year 1 payment) $52,000 ay . = Pick Up Truck with dump body $30,000 ad Pick up truck with Dump = High School Gym roof $50,000 = High School Gym Roof Replacement » High School Gym Flooring $100,000 = High School Gym Floor Replacement » Kitchen Equipment Dishwasher Morse St. $15,800 & Dishwasher/Disposal Morse Street « Kitchen Equipment Refrigerator Pownal $20,000

« Reach in Refrigerator Pownal Elementary 2011-2012 Anticipated Capital 2011-2012 Anticipated Capital Budget* Budget Bus Replacement

» Proposed new capital $267,800 eee

« Existing capital debt service $431,413 oe we

« Existing bus payments $52,000 aS = Total capital debt service $751,213 a ee = Proposed budget increase $92,665 2

6

2011-2012 Anticipated Capital 2011-2012 Anticipated Capital Budget Bus Replacement Budget Bus Replacement Two 78 Passenger School Buses Current Fleet:

» 1993 International . 1335 intemationa! ae i ntemationa . + 2000 Blue Bird » Replace one 1993 International 78 : 200% International passenger bus 155,000 miles a ionat . 2 5003 Thomas » Replace one 1997 International 78

0 ee Thomas passenger bus 175,000 miles = 2006 Thomas = 2008 Thomas = 2011 International = 2011 International

Pick up Truck with Dump Body Pick up Truck with Dump Body a 6 Bp = Slide in dump body currently in use Ja jee is at the end of it’s life cycle. Retrofit es : aa body 15 life cycle purchased in 1991 oe ——— 2 Small body limits amount of work ——— — = Used for salt and sanding in winter ae = Used for mulching = ee. » Used daily on sports fields High School Gym Roof High Schoo] Gym Roof re aa ae an « This 25 year old roof is at the end of ee Se a a it’s life cycle eS er = Skylights are at the end of life cycle es = « Repairs to this roof only gains two eee years of extended life ee » Gym Floor directly under this roof is Be ee eS also on this replacement cycle

7

Gym Floor Replacement Gym Floor Replacement ee a a4 a The Gym floor at Freeport High eee School has damage from a past roof

Soe S oe leaks causing dead spots in several

. ee =» Repair of this floor would be oo extensive making replacement more ...,.r,rrrrt—i‘i economical

Kitchen Equipment Kitchen Equipment Replacement Replacement eee

« Dishwasher/disposal at Morse Street Le oe : -— |

« Reach in Refrigerator At Pownal i oe, ee Elementary School ii ae Kitchen Equipment Replacement ' Kitchen Equipment Replacement ae Jue ee a Early 1980’s Dishwasher at Morse [7 @ — Street is at the end of its life cycle come aa a 2 » 1980 reach in refrigerator at Pownal =—- pees pes ae —— | school is at the end of its life cycle

8

Anticipated Capital 2012-2013 Anticipated Capital 2012-2013 s One 78 passenger bus cones

« Middle schoo! resurface access road $75,000 = Mast Landing resurface access road $50,000 . = Morse Street resurface bus road $25,000 . Proposed new capital $400,000

» Mast Landing Carpet replacement $100,000 « Existing capital debt service $415,395 5 Kitchen equipment HS/MLS dishwasher $29,605 in Existing bus payments $104,000 . a Kitchen equipment Morse St. steamer $15,000 . .

» Carpet replacement Pownal $22,000 a Total capital debt service $919,395

« Central office carpet replacement $10,000

* copia reserve account Sao 000 = Proposed budget increase $168,182 Anticipated Capital 2013-2014 Anticipated Capital 2013-2014

» One 78 passenger bus $26,000 = Proposed new capital $426,000 a Pick up truck $30,000 gs . .

« Athletic field upgrade $100,000 = Existing capital debt service $400,183

« Athletic field lights $100,000 » Existing bus payments $104,000

« Morse street roof repairs D-wing $50,000 « Total capital debt service $930,183

« Morse Street flooring D-wing $24,000

« Middle School roof repairs (Gym) $50,000 . = Capital reserve Account $46,000 » Proposed budget increase $10,788 = Total $426,000 Anticipated Capital 2014-2015 Anticipated Capital 2014-2015 s 78 passenger bus cower :

» Two vans $60,000 = Proposed new capital $400,000 : Ae aor + repai 5250/00 » Existing capital debt service $388,858

« High School roof repairs ’ gs a High School security system $15,000 = Existing bus payments $104,000

« Kitchen High School steam table $16,000 » Total capital debt service $892,858

« Capital reserve account $26,000 = Total $400,000 = Proposed budget increase $37,325

9

Source: , linked from www.rsu5.org/board-of-directors-and-policies/board-committees/standing-committees/finance-committee. Text copied out by software (pdftotext, then OCR); no wording corrected.