2010 Capital Budget Completed Projects Pownal School Entry Enclosure
Pownal Gym Lighting Upgrade Pownal Front Roof Section Morse Street Water Heater
Pownal Entry Enclosure Pownal Entry Enclosure ———s = This design will decrease the in tush a er of cold air into the front hall when ~~ the front door is opened during the a ia | cold weather months Bobs rr —- = Payback or energy savings is difficult — i aia to quantify but should be evident . a ao throughout the cold weather Pownal Gym Lighting Upgrade _ Pownal Gym Lighting Upgrade ~~ . - 2 Removes 36 T12 lighting Fixtures
= and replaces these with 12 T SHigh oe . efficiency fixtures ee xf a 2 Added three occupancy sensors
See ~ - =» Earned incentives from Efficiency ee Maine | 1 sg Pownal Roof Replacement Front Pownal Gym Lightin rad ; ym Lighting Upgrade Section
» Hours of Operation 2000 hours to 1600 a hours per year 20% less due to occupancy ee pes sensors os — = Electrical: usage per year old fixtures a. “ee en SS
« Electrical usage per year new fixtures Mk a ree £0 a
» Total Savings per year $1,397.00 ee ee :
» Rebate from Efficiency Maine $900.00 ee ee
« Payback for this project 2.04 years rt—“‘i<“‘“‘COCOCS
Pownal Roof Replacement Front P Morse Street Water Heater Section
= Front section completed over the 4 - 4 i aed = 35 year architectural shingles Ss i ie Morse Street Water Heater Morse Street Water Heater a Old Heater cost $44.13 a day to = Project replaces a 27 year old operate or $16,107 per year electric water heater servicing the «s New Heater cost $12.84 a day to kitchen and Wing D operate or $4,686 per year
» Heater converted from electric to = Savings per day to operate new natural gas heater $31.29 or $11,421 per year
» Payback for this project 2.49 years
2
Durham Geothermal Construction Durham Geothermal Construction = Uses a closed loop system to extract Eee ee ae heat from the ground water in winter —— (ow Ge oT eg and expels heat into the ground in : ee a ~ sa warmer months mae a 2 Environmentally friendly “ a.
« Energy management system in place See a =
« First year of operation will allow us to es | oe | build a baseline for future savings oe . —
; ; Freeport Middle Dishwasher Freeport Middle Dishwasher P Relocated from Durham relocated from Durham Elementary Elementary replaces the high temperature — a machine that had reached the end of , oe it’s life cycle of 20 years . = “ae
= The low temperature machine uses os = ee 6.88 KWH less energy per hour of ov, aie.
use a Pownal Soffett and Fascia | Pownal Soffett and Fascia ne ~ — = This project preserves the wood a a ee understructure and improves the
ft “fh s oo i appearance of this building
3
Durham Elementary Recycled Durham Elementary recycled . . Materials Materials # Pendant Lighting — ee = Ceiling tiles a =. 2 White boards lc (‘i Yr! a. a Projectors = SB. =e
» Bookcases oe Oe s Desks and classroom furniture POS : . Durham Elementary recycled Durham Elementary Recycled Materials Materials pe eee SU eee ot eee | aad fi SO ne eis Uae cys SS ee A OU eta pea e. Ss es es Shc. Ee Re emer Durham Elementary Recycled Durham Elementary Recycled . . Materials Materials Se ee RE ON in Durham Elementary Recycled .
raly EC’ Natural Gas for Heating - Materials SS ee
oo ough | (Ee « Natura! Gas will be the primary eeu ae Pownal Elementary, Freeport High CS School and Morse Street School = ce || beginning in late October and early Natural Gas for Heating Natural Gas for Heating
Fuel Oil a» Therms of Natural 2009-2010 gallons Gas anticipated used s Cost of natural gas per Therm $.859
« Fuel Oil equivalent per Gallon $1.12
« Propane equivalent per Gallon $.079 = Pownal 10,100 = Pownal 14,039
. » Morse Street s Morse Street School 13,730 school 19,084 = Freeport High a Freeport High School 22,669 School 31,510
Natural Gas for Heating Natural Gas for Heating Fuel Oil 2009-2010 == Therms of Natural Savings per Year Natural Gas costs per school Gas anticipated costs
- Pownal Elementary $7,640 Pownal $19,695 Pownal $12,055 Morse St School $10,381 Morse St $26,774 Morse St $16,393 Freeport High School $17,138 High School $44,205 High School $27,067 TOTAL SAVINGS $35,159
5
Natural Gas For Heating Payback wos 2011-2012 Anticipated
Pownal Payback 3.24 years Capital Budget* Morse St. Payback 1.94 years High School Payback 2.92 years . g y Y *Taken from RSU No. 5 Capital Plan . adopted January 2010 2011-2012 Anticipated Capital 2011-2012 Anticipated Capital Budget” Budget zn Two 78 Passenger School Buses = Buses (two) 78 passenger (year 1 payment) $52,000 ay . = Pick Up Truck with dump body $30,000 ad Pick up truck with Dump = High School Gym roof $50,000 = High School Gym Roof Replacement » High School Gym Flooring $100,000 = High School Gym Floor Replacement » Kitchen Equipment Dishwasher Morse St. $15,800 & Dishwasher/Disposal Morse Street « Kitchen Equipment Refrigerator Pownal $20,000
« Reach in Refrigerator Pownal Elementary 2011-2012 Anticipated Capital 2011-2012 Anticipated Capital Budget* Budget Bus Replacement
» Proposed new capital $267,800 eee
« Existing capital debt service $431,413 oe we
« Existing bus payments $52,000 aS = Total capital debt service $751,213 a ee = Proposed budget increase $92,665 2
6
2011-2012 Anticipated Capital 2011-2012 Anticipated Capital Budget Bus Replacement Budget Bus Replacement Two 78 Passenger School Buses Current Fleet:
» 1993 International . 1335 intemationa! ae i ntemationa . + 2000 Blue Bird » Replace one 1993 International 78 : 200% International passenger bus 155,000 miles a ionat . 2 5003 Thomas » Replace one 1997 International 78
0 ee Thomas passenger bus 175,000 miles = 2006 Thomas = 2008 Thomas = 2011 International = 2011 International
Pick up Truck with Dump Body Pick up Truck with Dump Body a 6 Bp = Slide in dump body currently in use Ja jee is at the end of it’s life cycle. Retrofit es : aa body 15 life cycle purchased in 1991 oe ——— 2 Small body limits amount of work ——— — = Used for salt and sanding in winter ae = Used for mulching = ee. » Used daily on sports fields High School Gym Roof High Schoo] Gym Roof re aa ae an « This 25 year old roof is at the end of ee Se a a it’s life cycle eS er = Skylights are at the end of life cycle es = « Repairs to this roof only gains two eee years of extended life ee » Gym Floor directly under this roof is Be ee eS also on this replacement cycle
7
Gym Floor Replacement Gym Floor Replacement ee a a4 a The Gym floor at Freeport High eee School has damage from a past roof
Soe S oe leaks causing dead spots in several
. ee =» Repair of this floor would be oo extensive making replacement more ...,.r,rrrrt—i‘i economical
Kitchen Equipment Kitchen Equipment Replacement Replacement eee
« Dishwasher/disposal at Morse Street Le oe : -— |
« Reach in Refrigerator At Pownal i oe, ee Elementary School ii ae Kitchen Equipment Replacement ' Kitchen Equipment Replacement ae Jue ee a Early 1980’s Dishwasher at Morse [7 @ — Street is at the end of its life cycle come aa a 2 » 1980 reach in refrigerator at Pownal =—- pees pes ae —— | school is at the end of its life cycle
8
Anticipated Capital 2012-2013 Anticipated Capital 2012-2013 s One 78 passenger bus cones
« Middle schoo! resurface access road $75,000 = Mast Landing resurface access road $50,000 . = Morse Street resurface bus road $25,000 . Proposed new capital $400,000
» Mast Landing Carpet replacement $100,000 « Existing capital debt service $415,395 5 Kitchen equipment HS/MLS dishwasher $29,605 in Existing bus payments $104,000 . a Kitchen equipment Morse St. steamer $15,000 . .
» Carpet replacement Pownal $22,000 a Total capital debt service $919,395
« Central office carpet replacement $10,000
* copia reserve account Sao 000 = Proposed budget increase $168,182 Anticipated Capital 2013-2014 Anticipated Capital 2013-2014
» One 78 passenger bus $26,000 = Proposed new capital $426,000 a Pick up truck $30,000 gs . .
« Athletic field upgrade $100,000 = Existing capital debt service $400,183
« Athletic field lights $100,000 » Existing bus payments $104,000
« Morse street roof repairs D-wing $50,000 « Total capital debt service $930,183
« Morse Street flooring D-wing $24,000
« Middle School roof repairs (Gym) $50,000 . = Capital reserve Account $46,000 » Proposed budget increase $10,788 = Total $426,000 Anticipated Capital 2014-2015 Anticipated Capital 2014-2015 s 78 passenger bus cower :
» Two vans $60,000 = Proposed new capital $400,000 : Ae aor + repai 5250/00 » Existing capital debt service $388,858
« High School roof repairs ’ gs a High School security system $15,000 = Existing bus payments $104,000
« Kitchen High School steam table $16,000 » Total capital debt service $892,858
« Capital reserve account $26,000 = Total $400,000 = Proposed budget increase $37,325
9