Skip to content

Supporting Documents for Board of Directors Adopted Budget.pdf

Budgets · FY 2014-2015 · 13 pages · 2,617 words · all RSU 5 documents · the district's file →

Text copied out by software, not the document itself. This is an image-only scan, read by text-recognition software, so figures, names and tables are unreliable. The district's copy is authoritative; check it before relying on this text.

RSUS5

Durham — Freeport — Pownal Board of Directors’ Adopted Budget 2014-2015 May 28, 2014

Page 1-2 Cover Pages 3-4 Enrollments Page 5-6 Budget Priorities Pages 7 Budget Summary Pages 8-9 Budget Adjustments

Page 10-11 Capital and Fuel Reserve Funds Pages 12-13 Tax Impact Summary

|

|

;

|

05/28/2014 . 2

RSUS Proposed Budget 2014-2015 Teachers per Grade | crate | communiy | Mowe tect | etenenay | Mast Landing | ‘wicte [High School Grade Communi Morse Street Elementa Mast Landing Middle High School PPK) Po CK 35-16) | 56) Tce) TC Csi“ sr P35 2020, | 409.20) | 103)__| ~«id SiS Po 2.517.179) | 47-18) [1c8sy) TC —“C*~srSC“‘CSC“C*d

SE Ye) A EY TC) Poa 2) 4 9-20) Ps 3 Gia) 02) 5) Po 8) 0022 P30 9220) Po 2) T8197 a ee ee es ee ee es 1 OO

I

A OO OC i PP Teachers 23 13 14 16 See attached 2011-2012 {2012-2013 2013-2014 2014-2015

Enrollment {Enrollment Enrollment Projected 10/1/11 10/1/12 10/1/13 Enrollment 2010-2011 2011-2012 2012-2013 2013-2014 | 2014-2015 Tuition Tuition Tuition Tuition Projected Students Students Students Students Tuition

10/1/10 10/1/11 10/1/12 10/1/13 Students | GradeK] 0] Charter) | Graded] charter | Grade] | Charter | Grades} | 0 Charter) | Grade] Charter | Grade P28 10 Charter) (Charter) | Grade Nf 26 | 0 S23 Charter)

05/28/2014 3

2013/14 Class Loads Freeport High School as of 1/30/14 Andreson, Charles [FineArts [0 [6 [8B Berkemeyer, Brian [Math | 81 TST 16.2[MathLab Cd DiSilvestro, Victor [Science | _ 905.5 | 16.4[Duty Cd Donovan, Kierston [Technology| 68 [S| 13.6[Duty CS [Dyhrberg, Geoffrey [Soc Studies[_ 89 | 6 [47s Greear, Matthew [Health/PE [149 [12*_ [13S] Cid Harper, Jay MGT ST [Medsker-Mehalic, K. [Fine Arts [84 [6 | Independent Study Mellon, Charles___—[Soc Studies[_ 69 [6 [SP CCSCidz” Nolan, Christopher [English [73 [6 [12.2 Ogilby, Henry [Soc Studies] 105, [6 TST Cid” Pizzuto, Debra [Math | 45 TST Mathtab CS Smail,David [Science [| 80 [ST t6[Duty Cid

Stivers, John [English [90 [S| 18| Writing Center Ci Taylor, Erin [ForLang [| 90 [6 TP Cd Trefsger, Keirstin _[English/Alt |__ 49 [S| 8A. Program Watts, David [FineArts [17 [ 6 TT (Whitmore, Diane [ForLang_ | 74 [6 [_—12.2|Independent Study i

* Semester Classes (sections)

05/28/2014 4

RSUS Superintendent’s Recommended Budget FY15 March 25, 2014 The Board established budget priorities in January 2014 based on the information available at the time. These priorities were used to develop the Superintendent’s Recommended Budget for the 14-15 school year. The following information outlines the Board’s priorities and those items included in the Recommended Budget. The Board asked administration to specify what reductions were made within the budget and what new items were requested but not included. It is important to the Board to recruit and retain high quality educators who have the most significant impact on student learning. Fair and competitive wages are one component of the Board’s efforts in this area. The negotiated contract for educator wages for 14-15 has been ratified and the overall wage increase year to year is 4%. This is a priority area for the Board every year and is in addition to the following priority areas administration is recommending for consideration:

1. Board Priority Area January 2014: Instructional Programs/Student Supports Last year we had to reduce one literacy strategist position. The return of this position is a very high priority with administration and staff. The Board also tried to add a math strategist position but was unable to do so due to the financial impact to our taxpayers. Administration supports the addition of this position for 14-15. Incremental increases are also needed to support students and teachers through additional Educational Technician hours, incremental increases in nursing and guidance support, and in special education services. Our supply and equipment lines have had limited increases in recent years and additional funds are needed in these areas. The reduction of the van driver position and use of bus driver/custodians has impacted the time spent cleaning building. There is a need to increase van driver/custodial hours to make improvements in this area. Superintendent’s Recommended Budget March 2014: The goals of this priority area are partially met but we needed to make reductions in some areas to offset increases in other areas. The specifics of these goal areas are listed below. Financial Impact of Wages and Benefits for employees — There is an average increase of 3.75% in wages for employees and have budgeted an increase of 8% in current year insurance premiums resulting in an increase of approximately $1,176,308 (now including full retirement costs) after all increases and decreases in positions. This increase results in an increase of 6.29% compared to last year’s amount. Class Size — The budget reflects the movement of 1 position at Morse Street School (due to decreased enrollments) to Mast Landing School to fill a vacancy at that school. This results in class sizes ranging from 16 to 20 at Morse Street and 19 to 20 at Mast Landing. Charter Tuition Funds —There are 24 students who have signed a letter of intent to attend a charter school next year. We are required by state law to pay the state average tuition to the charter school including both state and local funds. We have budgeted a total of $242,298 for charter tuition, which includes funds for 3 additional students. Special Education Programming — There is a need for an additional Resource Room at the high school resulting in 1 new teaching position. We have included funds for an additional 4 out-of-district placements based on student need. 05/28/2014 5)

2. Board Priority Area January 2014: Professional Development Time and Training

Professional development time is a vital support for educators as we continue to improve and expand our curriculum and program offerings to students. Unfortunately, we had to reduce one Professional Flex Day last year. There is a need for increased time for professional development and for parent-teacher conferences at the middle and high school level. Our goal is to fund Summer Institute trainings and an additional Professional Learning Day for the 14-15 school year.

Superintendent’s Recommended Budget March 2014:

Our Educational Technicians currently are budgeted for 2 professional days for training purposes. The proposed budget includes one additional day for Ed Tech training. Summer Institute trainings are included in the budget for PK-12. We were unable to add back in a Professional Day for educators but increased substitute time to support professional development.

3. Board Priority Area January 2014: Technology Investment:

There is a need for increased funds this year for student technology equipment linked to the purchase of higher- powered desktop computers for STEM and performing arts software.

Superintendent’s Recommended Budget March 2014:

The technology equipment budget was increased by $35,000, which includes the higher powered desktop computers for STEM, wifi upgrades, teacher/student laptop upgrades, and replacement of aging projectors.

4. Board Priority Area January 2014: Capital Investments

This year there continues to be a major focus on capital investments. The Capital Plan recommendations provide funds to support on-going improvements in all of our 7 facilities and our vehicles. The District Safety Committee is recommending the purchase of radios for use in the buildings and in an emergency, if needed. Superintendent’s Recommended Budget March 2014:

The budget continues to fund important capital investments. Funds for repaving of the Freeport Middle School access road and Audio/Visual upgrades have been placed in capital reserves. The purchase of radios is included but we have excluded the “repeater” for communications between buildings.

05/28/2014 6

2014-2015 SORERIRTENDERE RECOMMENDED BUDGET

Assessed Proposed 2013-2014 2014-2015

Article # Description Budget Budget Difference

Article 1. STUDENT AND STAFF SUPPORT $ 2,389,233 $ 2,598,918 $ 209,685 Article 2)|=SCHOOL ADMINISTRATION $ 1,250,147 $ 1,300,246 $ 50,099 Article 3) FACILITIES MAINTENANCE $ 2,936,504 $ 3,040,846 $ 104,342

Article 4 CAREERAND TECHNICAL EDUCATION $ 461,494 $ 506,152 $ 44,658

Article 5 ALL OTHER EXPENDITURES (Nutrition, Crossing Guards) $ 106,400 $ 156,400 $ 50,000

Article 6 REGULAR INSTRUCTION $ 11,060,907 $ 11,458,449 $ 397,542

Article 7 OTHER INSTRUCTION (Co-Curricular & Athletics) $ 678,292 $ 652,027 $ (26,265) *

Article 8 SYSTEMADMINISTRATION $ 685,897 $ 751,497 $ 65,600

Article 9 TRANSPORTATION AND BUSES $ 1,369,698 $ 1,430,555 $ 60,857

Article 10 DEBT SERVICE AND OTHER COMMITMENTS $ 1,754,858 $ 1,728,287 $ (26,571)

Article 11 SPECIAL EDUCATION $ 3,161,883 $ 3,625,613 $ 463,730 TOTAL ARTICLE 1-11 BUDGET $ 25,855,313 $27,248,990 $ 1,393,677 ADULT EDUCATION $ 83,000 $ 83,000 $ .

TOTAL OPERATING BUDGET $ 25,938,313 $27,331,990 $ 1,393,677

* ESL ($75,392) moved to Article 6 (Regular Instruction) per DOE

7

05/28/2014

Budget Adjustments 2014-2015

ARTICLE 1: STUDENT AND STAFF SUPPORT- Pages 1-10 GUIDANCE *Added 6 additional summer days FHS *Added .3 MLS NURSING *added .16 FTE to address medical needs MLS CURRICULUM DEVELOPMENT *Added Professional Development Funds LIBRARY SERVICES *Changed 20 hr Ed Tech to .5 FTE Librarian; added 40 hrs summer library *Books funded at $19.16 per student TECHNOLOGY *FHS STEM Lab; AV Upgrades; MSS/MLS/FMS Wifi Upgrades

ARTICLE 2: SCHOOL ADMINISTRATION.- Pages 11-13 *Reductions due to staff retirements

ARTICLE 3: FACILITIES MAINTENANCE-Pages 14-18 *Revenues from Town of Freeport to offset expenses of Hunter Rd. field maintenance

ARTICLE 4: CAREER AND TECHNICAL EDUCATION-Page 18

*As recommended by Region 10 Board of Directors

ARTICLE 5: ALL OTHER EXPENDITURES-Page 18

*Due to changes in federal requirements resulting in increased food cost and lower participation numbers

ARTICLE 6: REGULAR INSTRUCTION-Pages 19-25 *Addition of 1 FTE PreK-6 Math Strategist *Addition of 1 FTE PreK-8 Literacy Strategist *Allocated $9,100 in music funds for equipment based on Music Committee request

* Added $5,000 for Middle School Math Consulting DCS/FMS *Added $15,000 for Math Consulting FHS *Reallocated 1 FTE Teacher to MLS due to enrollment decreases at MSS *Added .2 FTE MLS; removed 30 Ed Tech hours *Added .5 FTE Drama FHS *Charter tuition allocated throughout budget as required by DOE *Moved 1 FTE ESL Ed Tech to FHS ISS *ESL moved from Article 7 per DOE *Copier Lease payoff in lieu of new lease for replacement copiers

05/28/2014 8

Budget Adjustments 2014-2015

ARTICLE 7: OTHER INSTRUCTION-Pages 26-29 *ESL ($75,392) moved to Article 6 (Regular Instruction) per DOE *Includes $4,000 for Drama/One Act Supplies FHS *Continued phase in funding for Booster funded teams *Continuation of uniform replacement plan

ARTICLE 8: SYSTEM ADMINISTRATION-Pages 30-31 . *Educator and Support Professional Negotiations *Superintendent Retirement

ARTICLE 9: TRANSPORTATION AND BUSES-Pages 32

*Re-distributed staff driving and riding vans *Bus Lease payoff in lieu of new bus purchases

ARTICLE 10: DEBT SERVICE AND OTHER COMMITMENTS-Page 33

*Scheduled reductions

ARTICLE 11: SPECIAL EDUCATION-Page 33-43 *Reallocated Instructional Strategist and Secretarial Support to Local Budget from LE due to Out of District Placement Needs “Contingency funds for 1 Out of District Placement/Medicaid Seed Money

*Added 1 FTE FHS Resource Room *Added .5 FTE PES Resource Room *Added .5 FTE MSS Resource Room

*Removed 87.5 hrs Resource Room Ed Tech to offset 1FTE Teaching position

05/28/2014 9

RSU5 2014-2015 RESERVE FUNDS SUMMARIES CAPITAL RESERVE FUND

Summary as of May 28, 2014 Capital Reserve July 1, 2013 Balance $ 73,010 2013-2014 Capital Improvements $ 50,000 Capital Reserves Balance $ 123,010 Security Upgrades at School Entrances $ (25,000) Anticipated Capital Reserve Balance as of May 28, 2014 $ 98,010 How Funded: 2013-2014 Anticipated Unexpended Capital Reserve Fund Balance $ 98,010

2014-2015 Capital Improvements $ 202,000 Capital Reserve Fund $ 300,010 Anticipated 2014-2015 Capital Items

Item 1 Bus (2) 78 Passenger (Bus/Van Lease payoff in lieu of new bus purchases) $ 43,658 Item 2 Middle School repave access rd (to reserves) $ - Item 3. High School Tennis Courts $ 24,000 Item 4 Morse St Steamer (Kitchen) $ 15,000 Item 5 Middle School Library Carpet $ 12,000 Item 6 Mast Landing Playground Upgrade $ 10,000 Item 7 Pownal Playground Upgrade $ 10,000 Item 8 Pownal Gym Roof $ 30,000 Item 9 Mast Landing Dishwasher $ 14,000 Item 10 Middle School Reach In Cooler $ 9,000 Item 11 Audio/Visual upgrades (to reserves) $ = Item 12 High School-add cabinets to science wing $ 15,000 Item 13 Radios for Safety Communications $ 9,000 Item 14 Capital Reserves (for Items 2 & 11) $202,000 $ 393,658 Breakdown of Capital Items Funding:

Article 3 Capital Improvements $ 350,000

Article 9 Bus/Van Lease (Bus/Van Lease payoff in lieu of new bus purchases) $ 43,658 Capital Reserves Fund $ - Total Funding $ 393,658

05/28/2014 10

RSU5 2014-2015 RESERVE FUNDS SUMMARIES FUEL RESERVE FUND

Summary as of May 28, 2014 Fuel Reserve July 1, 2013 Balance $ 74,013 Anticpated Usage Due to Extremely Cold Winter $ 61,000 Anticipated Fuel Reserve Balance as of May 28, 2014 $ 13,013 Funding for 2014-2015:

Anticipated 2013-2014 Unexpended Fuel Reserve Fund Balance $ 13,013 Anticipated 2013-2014 Unexpended Fund Balance $62,000 Fuel Reserve Fund $ 75,013 2014-2015 Heating Fuel Budgeted in Operating Budget* $ 151,047 2014-2015 Anticipated Fuel Reserve Expenditures** $ 25,800 *Amounts budgeted are based on anticipated Natural Gas expenditures Durham Community School utilizes Geothermal heating with Propane backup. **Buffer for Natural Gas pricing

05/28/2014 11

RSU5 2014-2015 BOARD OF DIRECTORS' ADOPTED BUDGET IMPACT

Assessed Projected 2013-2014 2014-2015 Difference RSU Operating Budget

Total Operating Budget $ 25,855,313 §$ 27,248,990 $ 1,393,677 5.39% Adult Ed Budget $ 83,000 _$ 83,000 $ : Total RSU Operating Budget w/Adult Ed $ 25,938,313 $ 27,331,990 $ 1,393,677 Less: State and Non-Shared Debt F-Non-Shared Local Debt $ 197,414 §$ 191,496 $ (5,918) D- State Supported Debt $ 1,387,141 $ 1,368,745 $ (18,396) D-Non-Shared Local Debt $ 215,585 _$ 212,167 $ (3,418) Total State and Non-Shared Debt $ 1,800,140 $ 1,772,408 $ (27,732) Less: Local Revenues Shared Revenue* $ 673,357 $ 365,502 $ (307,855) Additional Assessment Durham $ - $ - $ - State Aid $ 3,716,819 $ 4,149,656 $ 432,837 Total Revenues $ 4,390,176 $ 4,515,158 $ 124,982 Less: RSU Plan Required Local Contribution $ 15,907,360 $ 15,629,558 $ (277,803) Total Additional Local Monies Required $ 3,840,637 $ 5,414,867 $ 1,574,230 Additional Local Monies Required Distribution Per RSU Plan Durham 21.42% $ 822,664 §$ 1,159,864 $ 337,200 Freeport 65.98% $ 2,534,052 §$ 3,572,729 $ 1,038,677 Pownal 12.60% $ 483,920 $ 682,273 $ 198,353 Total Additional Local Monies Required $ 3,840,637 §$ 5,414,867 $ 1,574,230 *Shared Revenue Town of Freeport Hunter Rd Field Maintenance $83,902

State Agency $18,800 Medicaid $31,600 Misc / Interest $19,900 Laugh & Learn $15,300 Contingency $196,000 Fund Balance: $0 Total Shared Revenue $365,502

05/28/2014 12

RSU5 2014-2015 BOARD OF DIRECTORS' ADOPTED BUDGET IMPACT

Assessed Projected 2013-2014 2014-2015 Difference Additional Local Monies Required Distribution Per RSU Plan Durham 21.42% $ 822,664 $ 1,159,864 $ 337,200 Freeport 65.98% §$ 2,534,052 $ 3,572,729 $ 1,038,677 Pownal 12.60% $ 483,920 $ 682,273 $ 198,353 Total Additional Local Monies Required $ 3,840,637 $ 5,414,867 $ 1,574,230 Durham RSU Plan Additional Local Monies $ 822,664 $ 1,159,864 $ 337,200 RSU Plan Required Local Contribution $ 2,851,071 $ 2,844,923 $ (6,149) Non Shared Debt $ 215,585 §$ 212,167 $ (3,418) Assessment HS Choice Transportation $ - $ - $ - $ - $ - $ - Net Impact $ 3,889,320 $ 4,216,954 $ 327,633 Impact on Mil* $0.99 6.64% Freeport RSU Plan Additional Local Monies $ 2,534,052 §$ 3,572,729 $ 1,038,677 RSU Plan Required Local Contribution $ 11,559,588 $ 11,290,590 $ (268,998) Non Shared Debt $ 197,414 §$ 191,496 $ (5,918) $ - $ - $ - Net Impact $ 14,291,054 $ 15,054,815 $ 763,761 Impact on Mil* $0.55 3.49% Pownal RSU Plan Additional Local Monies $ 483,920 $ 682,273 $ 198,353 RSU Plan Required Local Contribution $ 1,496,701 $ 1,494,045 $ (2,656) Non Shared Debt $ - $ - $ - $ - $ - $ - Net Impact $ 1,980,621 $ 2,176,318 $ 195,697 Impact on Mil* $2.11 6.08% *Based on April 1, 2013 Town Valuations and Mil Rates

05/28/2014 13

Source: , linked from www.rsu5.org/budget/budget-2014-2015. Text copied out by software (pdftotext, then OCR); no wording corrected.